THUAN DAO INDUSTRIAL PARK, BEN LUC, LONG AN
02/12/2016
Location: Ben Luc town, Ben Luc district, Long An province.
 Contact: www.thuandao.com Distance to traffic hubs 1. From the Industrial Park (IP) to Center of Ho Chi Minh City: 21 km. Phu My Hung urban area – Dist. 7, HCM City: 18 km (20 mins) Green City, Tan An City – Long An: 20 km (20 mins) 2. Road: National Road 1A => the IP: 0.8 km Highway of HCMC – Trung Luong => the IP: 2 km Belt Road 4 => the IP: 2 km Belt Road 3 (Highway Ben Luc Long Thanh) => the IP: 5 km 3. Waterway & Port system: Vam Co river: 200m in width, 12 – 20m in depth Bourbon and Hoang Tuan ports: away from the IP 500m, vessel of 5,000 DWT, capacity of 550,000 ton/year Long An International seaport: far from the IP 28 km – vessel of 50,000 – 70,000 DWT; capacity in 2020: 15 million ton/year Hiep Phưoc seaport Tp. HCM: far from the IP 30 km (road) – vessel of 50,000 – 70,000 DWT, capacity of 200 million ton/year Cat Lai port – Tp. HCM: far from the IP 35 km, capacity of 70 million ton/year 4. Airway: Tan Son Nhat Airport – Tp HCM: away from the IP 20 km; capacity: 23 million passengers/year and 600,000 ton of commodities/year Long Thanh International Ariport – Dong Nai: far from the IP 45 km (Highway of Ben Luc – Long Thanh); capacity of 100 million passengers/year and 5 million ton of commodities/year. 
STRENGTHS | 1. Convenient location: Thuan Dao Industrial Park locates at the center of Ben Luc town, Ben Luc district, Long An province. Long An is considered as a "backyard" of Ho Chi Minh city and is the key and only trading gateway between the two major economic zones of the South and Mekong Delta. 2. Transportation advantages: Thuan Dao Industrial Park is a hub for the national traffic system (road, airline, waterway and railway) easily and conveniently such as: - Road: National Road 1A, Belt Road 3, Belt Road 4, Highway from HCMC – Trung Luong – Can Tho, provincial road 16. - Airline: Tan Son Nhat International airport, Long Thanh International airport - Waterway: Ben Luc Bourbon port, Long An International port, Hiep Phuoc Port; Cat Lai Port. 3. Term of land use: Investor is entitled to use land for 50 years and does not have any other annual land payment to the Government. 4. HR- Training: Thuan Dao is the only IP in Mekong Delta occupies 53% of Long An labor force with 30,000 workers compared to 47,000 workers of the whole province 5. Procedures of "one stop service": Investors are served with procedures of one stop service quickly and free of charge: investment certificate, tax code, seal, etc. 6. Free consulting service: Investors are freely provided with the consulting services of environment, design, construction, completion, works ownership, procedures of customs, tax, banking, accounting, bank loan, investment and construction of warehouses, machinery and equipment, etc. | POSITION See location map on Google maps | - East: adjoining to provincial road 19 - West: adjoining to Long Cang - Long Dinh road - North: adjoining to Chanh canal - South: internal road | INVESTMENT INCENTIVES | Incentive for corporate income tax : tax exemption for first 02 years and reduction by 50% for the next 04 years (income tax is 17%) Click here for more information | PERFORMANCE DURATION | Until September 06th, 2061. | LEASING PRICE AND MODE OF PAYMENT | 75 - 85 USD/m2 (not inclusive of VAT, depending on area and location) 1. Payment Method for land lease: - Signing MOU: deposit of 10% - Issueing an Investment Certificate: payment of 30% (Total: 40%) - Signing Contract of Land Lease: payment of 30% (Total: 70%) - Handover of the land: payment of 25% (Total: 95%) - Issueing Certificate of Land Use Right: payment of the rest. | FACTORY LEASE PRICE | 3 - 5 USD/m2/month (can be built according to customer's design). | INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICES | Infrastructure maintaining fee: 0.034 USD/m2.month (not inclusive of VAT) | WATER RATES | 0.47 USD/m3 (not inclusive of VAT) | FEE WASTEWATER TREATMENT | 0.34 USD/m3 (not inclusive of VAT) | ELECTRICITY PRICE | According to the price table of the Government | FUNCTIONAL BLOCK | 1. Land for lease: 132 ha - Land for dyeing and plating industries: 26 ha - Land for other industries: 95 ha 2. Land for warehouse lease: 11 ha | LAND USE STRUCTURE | Total: 189.843 ha - Land for factory & warehouse: 130.25 ha (Land for dyeing and plating: 26 ha) - Land for commercial service: 18.58 ha - Land for transportation: 19.63 ha - Land for green trees: 19.04 ha - Land for engineering: 2.34 ha | SCOPE OF PERMITTED INVESTMENTS | Projects on dyeing and textile Projects on mechanical engineering and plating Projects on production of building materials, exception for fibro cement roofing sheet Projects on traffic and production of asphalt concrete Projects on energy and production of power wire and cable Projects on electronics and telecommunication Projects on exploration, exploitation and processing of minerals Projects on waste treatment: building up non-toxic industrial waste treatment and disposal facilities Projects on timber processing, production of glass and ceramic products Projects on food processing Projects on processing of agricultural products Projects on breeding and animal feed processing of cattle, poultry, fishery, except for the project of construction of fishmeal processing facility Projects on production of chemical fertilizer, pesticide, except for the project of extracting and packaging pesticide Projects on chemicals, pharmaceuticals and cosmetics Projects on production of paper and stationery Other projects, excepting for leather from fresh leather, rubber processing, rubber latex | CLIMATE | - Rainy season: from May to October - Dry season: From November to April - Average temperature: 27.2 0C - 27.7 0C - Annual rainfall: 966 - 1,325 mm - Average humunity: 80% - 82% - Annual Average hours of sunshine: 2,500 - 2,800 hours - Wind: Northeast: frequency of 60 - 70% in dry season; Southwest: frequency of 70% in rainy season. | TOPOGRAPHY AND GEOLOGY | - Handover elevation: 1.85m - Ground compression: 8 - 10 tons/m2 - Depending on location and area, pile ranges from 8 - 15m | WASTE WATER | According to QCVN 40:2011/BTNMT | FIRE PREVENTION AND PROTECTION | Fire protection system complies with the current regulations of the government | INFRASTRUCTURE | | TRAFFIC SYSTEM | 1. Internal road: - Asphalt concrete road designed by Vietnam standard H30, is from 16 – 30 m 2. External road: - Nguyen Trung Truc street is 30m linking the Industrial Park into the National Road no.1A - Long Cang – Long Dinh street is 24m linking the Industrial Park into Ben Luc town - The provincial road no.19 is 24m linking the Industrial Park into Long An International seaport | ELECTRICITY SUPPLY SYSTEM | - Ben Luc pawer station, 110/22KV, output 40 + 63MVA - Rach Chanh – Can Duoc power station, output 40 MVA | WATER SUPPLY SYSTEM | There are four plants supplying water for the IP: - Go Den water plant: 7,200 m2/day - Hoang Long water plant: 10,000 m3/day - Binh Anh water plant: 15,000 m3/day | WASTEWATER TREATMENT SYSTEM | 1. Land area: 15,000 m2 - Stage 1: 2,500 m3/day - Stage 2: 5,000 m3/day - The pipeline: F 600 – 800 2. Investor treats their wastewater up to B Standard – QCVN 40:2011/BTNMT. The IP continues to treat the wastewater up to A Standard – QCVN 40:2011/BTNMT 3. The IP invests to build a monitoring station to automatically test the wastewater before discharging into Chanh Canal | POST AND TELECOMMUNICATION SYSTEM | The modern telecommunication network is established according to international standards such as MDF, telephone system and high-speed internet connection supplied by the post-telecommunication provider which is able to meet all the investors' requirements. | PUBLIC UTILITIES | Land area: 28 ha including: Custom office, Bank, Post office, Hospital, Schools, Commercial & service centers, restaurants, Canteens, Offices for rent, Sport center, Convention center, Kindergarten, Warehouses, Logistics, etc … are set up in the IP and the residential area | SUPPORTING SERVICES | | FREE SERVICES | Making applications for all licenses from the beginning to investor's operation. | SUPPORTING SERVICE | - Consulting: Design, construction, completion, ownership of structure, customs, tax, accounting, wastewater treatment … - Assisting: Recruiting and training, lunch meal, telecommunication, electricity, water, houses … - Supplying building materials: fresh concrete, drain, pile, floor tile, wall tile, roof tile, sanitary wares, UPVC window, liquid paint … with competitive prices | TYPICAL CLIENTS | | CUSTOMER LIST | Click here for more detail | DOCUMENTS | |
Source: Long An Economic Zone Authority (LEAZA)
Related news
-
Notice of invitation interestors to sumbit registration documents to implement project of social housing (9.53ha) in Duc Hoa Dong commune, Duc Hoa...
02/01/2025
-
Notice of Invitation of interest in land-use investment project of social housing (9.62ha) in Duc Hoa Dong commune, Duc Hoa district, Long An province
02/01/2025
-
Long An attracted 5 investment projects in the industrial clusters in the first 9 months of 2018
18/10/2018
-
Phu An Thanh Industrial Park & Sojitz sign cooperation to lure more hi-tech investors
14/10/2018
-
DUC HOA III – VIET HOA INDUSTRIAL PARK, DUC HOA, LONG AN
02/12/2016
-
DUC HOA III - THAI HOA INDUSTRIAL PARK, DUC HOA, LONG AN
02/12/2016
-
PHUOC DONG INDUSTRIAL PARK AND PORT, CAN DUOC, LONG AN
02/12/2016
-
LONG HAU - HOA BINH INDUSTRIAL PARK, THU THUA, LONG AN
02/12/2016
-
VINH LOC 2 INDUSTRIAL PARK, BEN LUC, LONG AN
02/12/2016
-
LONG AN S.E.A INDUSTRIAL PARK, CAN GIUOC, LONG AN
02/12/2016
|
| |