|
DUC HOA III - THAI HOA INDUSTRIAL PARK, DUC HOA, LONG AN
02/12/2016
Location: Tan Hoa hamlet, Duc Lap Ha commune, Duc Hoa district, Long An province
 Contact: www.thaihoa-ip.vn Distance to traffic hubs Next to Ho Chi Minh city on road 10, distances from: Ho Chi Minh city center : 35 km An Sương Station : 26 km Tan Son Nhat airport : 32 km Sai Gon Port : 45 km STRENGTHS | * The policy of exempt, reduce corporate income tax in the first 10 years. * Advantage of geographic position, providing convenient in transportation and carriage. * Complete infrastructure, able to build factory right away. * Vietnam standard's Activated Sludge sewage treatment system with capacity of 2,000m3/day&night. * A system to prevent flood, waterlogged in industrial zone: equiped 3 pumps with capacity of 10,000m3/hour/machine, ensuring that no water penetration in the zone when there is rain storm, tide. * Reasonable price and payment method; saving initial investment cost for investors. | POSITION See location map on Google maps | Located at Tan Hoa hamlet, Duc Lap Ha commune, Duc Hoa district, Long An province; 2.5km away from 832 provincial road. There are two main transport routes to Thai Hoa IZ: + Thay Cai road: 20m wide, 11km long, asphalted. This road goes along the channel, across head of Thai Hoa IZ. + Duc Hoa 3 road: 36 meters wide, 11 kilometers long, go through the middle of Thai Hoa IZ | INVESTMENT INCENTIVES | Free of 02 years, 50% in the next 04 years. Click here for more detail | PERFORMANCE DURATION | Until 06/09/2054 | LEASING PRICE AND MODE OF PAYMENT | 51 USD/square meter Rental land is guaranteed to meet all leveling standards and have a complete infrastructure. - Rental price is applied for different time of land rental registration, which depends on loaction and payment method. - Payment method: flexible, suitable for investors' demand and financial resources. Especially, factory and land rental package with payment in 10 years. | FACTORY LEASE PRICE | 2.5 USD/m2 | INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICES | Section A: 1.050 VNĐ m2/ Month, Section B: 630 VNĐ m2/ Month | WATER RATES | 7.330 VNĐ/ m3 | FEE WASTEWATER TREATMENT | 6.300 VNĐ/m3 | ELECTRICITY PRICE | | FUNCTIONAL BLOCK | | LAND USE STRUCTURE | Factory construction land: 70.28 hectare (70.09%) Administrative construction and service land: 4.19 hectare. Storey: 2-12 floors (4.17%) Technical area land (sewage treatment station): 1.00 hectare (1.00%) Verdure land,water surface : 10.17 hectare (10.14%) traffic land: 14.60 hectare (14.60%) | SCOPE OF PERMITTED INVESTMENTS | Thai Hoa IZ accepts the following manufacturing industries: - Produce building materials (apart from cement, clay brick) - Manufacture domestic and export comsumer goods. - Products for serving agriculture, foodstuff for cattle; manufacturing and assembling machinery of agriculture - fishery. - Produce phamaceutical products and cometics. - Food and beverage (except alcoholic products) - Process wood (without soaking). - Manufacture glass, pottery, porcelain. - Process farm products. - Footwear, rubber tyre and tube, which is using up-to-standard rubber (not waste rubber from used tyre and tube). | CLIMATE | influenced by monsoon climate, lots of rain falls, annual average rainfall is 1,805 mm, average temperature: 27.70C. High level of humidity, illumination, suitable for many kinds of cultivated crops, have only few influence of natural disaster. influenced by 2 main kinds of wind: southwest wind in rainy season, southeast wind in dry season. | TOPOGRAPHY AND GEOLOGY | - Constructive height: 1.4 m - Compression ratio: 0.5 cm2/kg - Adhesion strength C: 0.18 kg/cm2 - Natural weight: 1.91g/cm3 - Compressive intensity of land: 5 tons/m2 | WASTE WATER | Follow current Vietnam's standards | FIRE PREVENTION AND PROTECTION | Fire protection system complies with the current regulations of the government | INFRASTRUCTURE | | TRAFFIC SYSTEM | * Approximately 2.5km away from provincial road number 8. Two main routes to access to Thai Hoa IZ: + Thay Cai road: 20m wide, 11km long, asphalted. This road goes along teh channel, across head of Thai Hoa IZ. + Duc Hoa 3 road: 36 meters wide, 11 kilometers long, go through the middle of Thai Hoa IZ * Industrial zone's internal roads: include 4 main roads (A, B, C, D); length: 2,000m; parallel to artificial channel and with 8 cross-line named from 1 to 8, each line 500 long. | ELECTRICITY SUPPLY SYSTEM | Supplied by Duc Hoa Electric Power Company. Duc Hoa Power Station is 110/22 KV with capacity of 2x65MVA; Duc Hoa Power station 2 is 110/22 KV with capacity of 65 MVA, 2km away from Thai Hoa IZ entrance. Electricity cost is calculated according to Government regulations. | WATER SUPPLY SYSTEM | Fresh water system is supplied by Phu My Vinh Water Supply Plant with capacity of 40.000m3 water per day and night. Water supply network will be covered all over industrial zone so that all investors are able to connect and use. Water cost is calculated according to Gorvernment regulations, with Vietnam quality standard. | WASTEWATER TREATMENT SYSTEM | Vietnam standard of Activated Sludge sewage treatment system with capacity of 2,000m3/day&night. | POST AND TELECOMMUNICATION SYSTEM | * Telephone: 1,000 lines * High speed Fibre Optic Cable with bandwith up to 100 Mbps * Cost is calculated according to Government price | PUBLIC UTILITIES | * A system to prevent flood, waterlogged in industrial zone: equiped 3 pumps with capacity of 10,000m3/hour/machine, ensuring that no water penetration in the zone when there is rain storm, tide. * Verdure system, environment sanitation provides beautiful clean scenery, fresh air which is environmental friendly and pollution free * Artificial channel creates natural airy scenery for the industrial zone. | SUPPORTING SERVICES | | FREE SERVICES | * Consulting service related to applying Business Registration Certificate, Investment Certificate, Construction Permit documents, as-built document,etc. * Support service for importing factory equipments: investors only need to contect us when having teh demand to importing factory equipments, we will give our best support in legal procedure so that investors are able to operate as soon as possible. * Tax consulting service, bank loans: Investors of Thai Hoa IZ will receive consulting from professionals so as to understand thoroughly all tax policies, incentive standard, low interest rate bank loan in a short time. | SUPPORTING SERVICE | Verdure take care service Supply industrial servings Bank, shopping area, schools, job center | TYPICAL CLIENTS | | CUSTOMER LIST | Click here for more detail | DOCUMENTS | |
Source: Long An Economic Zone Authority (LEAZA)
Related news
-
Notice of invitation interestors to sumbit registration documents to implement project of social housing (9.53ha) in Duc Hoa Dong commune, Duc Hoa...
02/01/2025
-
Notice of Invitation of interest in land-use investment project of social housing (9.62ha) in Duc Hoa Dong commune, Duc Hoa district, Long An province
02/01/2025
-
Long An attracted 5 investment projects in the industrial clusters in the first 9 months of 2018
18/10/2018
-
Phu An Thanh Industrial Park & Sojitz sign cooperation to lure more hi-tech investors
14/10/2018
-
THUAN DAO INDUSTRIAL PARK, BEN LUC, LONG AN
02/12/2016
-
DUC HOA III – VIET HOA INDUSTRIAL PARK, DUC HOA, LONG AN
02/12/2016
-
PHUOC DONG INDUSTRIAL PARK AND PORT, CAN DUOC, LONG AN
02/12/2016
-
LONG HAU - HOA BINH INDUSTRIAL PARK, THU THUA, LONG AN
02/12/2016
-
VINH LOC 2 INDUSTRIAL PARK, BEN LUC, LONG AN
02/12/2016
-
LONG AN S.E.A INDUSTRIAL PARK, CAN GIUOC, LONG AN
02/12/2016
|
| |