Notice of invitation of interest in land-use investment project of Binh An Duc Hoa Urban Area, in Duc Hoa Ha commune, Duc Hoa district, Long An province
Department of Planning and Investment of Long An province invites the interested investors submit application for registration to implement project of Binh An Duc Hoa Urban Area, in Duc Hoa Ha commune, Duc Hoa district, Long An province with the following information:

YEU CAU SO BO-KDT BINH AN DUC HOA638484463216564883.pdf

THONG BAO MOI QUAN TAM 457638484463157175932.pdf

QUYET DINH CHU TRUONG 12405 - 29-12-2023638484462714135207.pdf

QUYET DINH 3049- 02-04-2024638484462611635997.pdf

1.         Project name, investment objectives and investment scale of the project:

1.1.      Project name: BINH AN DUC HOA URBAN AREA

1.2.      Investment objectives

Synchronously invest in technical infrastructure and social infrastructure in urban area to connect synchronous regional infrastructure according to the approved 1/500 detailed planning, develop housing according to the detailed planning (the product is commercial apartment).

 

PEOPLE'S COMMITTEE

LONG AN PROVINCE

DEPARTMENT OF PLANNING AND INVESTMENT

____________

No. :457 /TB-SKHDT

SOCIALIST REPUBLIC OF VIETNAM

Independence - Freedom – Happiness

__________________________________

Long An, April 10, 2024

1.3.      Investment scale of the project

1.3.1. Land use area: about 131,753 m2 (location and boundary of the land are for project implementation according to the cadastral map extract issued by the Division of Natural Resources and Environment of Duc Hoa district on October 10, 2023).

1.3.2. Population scale: About 10,100 people.

1.3.3. Construction scale: Completely and synchronously invest in technical and social infrastructure according to the approved 1/500 detailed planning.

1.3.4. Preliminary structure of housing products: Commercial apartments, with housing product structure including:

No.

LAND TYPE

LAND AREA (m2)

MAXIMUM FLOOR HEIGHT

MAXIMUM CONSTRUCTION LAND AREA (m2)

MAXIMUM TOTAL CONSTRUCTION FLOOR AREA (m2)

BLOCK NUMBER

EXPECTED NUMBER OF APARTMENTS

1

BLOCK A

16,248

14-20

9,062

127,237

5

736

 

A1

12,503

14-20

7,337

97,912

4

493

 

A2

3,745

17

1,725

29,325

1

243

2

BLOCK

B

22,691

14-25

11,596

220,508

7

1,850

 

B1

9,211

14-20

5,128

88,136

3

699

 

B2

7,165

20-25

3,245

72,445

2

637

 

B3

6,315

17-20

3,223

59,927

2

514

3

BLOCK C

18,385

22-28

12,184

250,336

6

2,916

 

C1

9,203

22-28

6,137

125,348

3

1,458

 

C2

9,182

22-28

6,047

124,988

3

1,458

 

Total

57,324

 

32,842

598,081

18

5,502

1.3.5 Social Housing Development Land Fund

Implementing the allocation of land for social housing construction under the current legal regulations. After selecting the investor to carry out the project, the locality will coordinate with the investor to accurately determine the social housing land fund in as prescribed.

1.3.6. Preliminary investment plan for urban infrastructure construction and management within and beyond the project scope; preliminary part of urban infrastructure that the investor retains for business investment, and the part of urban infrastructure that the investor hands over to the locality.

-The investor invests in complete, synchronized technical infrastructure, and social infrastructure according to the detailed approved planning.

-The management and handover of technical infrastructure projects will be carried out according to the current regulations of the state authorities.

-Complete the construction of mixed-use high-rise residential buildings, social housing (if any); complete the construction of mixed-use projects including commercial services, culture, sports, offices; healthcare facilities, educational facilities including preschools, primary schools, and secondary schools. After completing the investment in project construction, the investor has the right to operate and do business with the invested construction items.

-For urban infrastructure beyond the project scope, the urban infrastructure projects outside the project scope are implemented according to the approved planning. Specifically for infrastructure within the project boundary, the investor is responsible for implementing and coordinating with the local authorities in connecting technical infrastructure.

2. Preliminary total project implementation costs: 8,814,487,307,000 VND (in words: eight thousand eight hundred fourteen billion four hundred eighty-seven million three hundred seven thousand Vietnamese Dong).

3. Preliminary total compensation, support, and resettlement costs: 477,758,693,000 VND (in words: four hundred seventy-seven billion seven hundred fifty-eight million six hundred ninety-three thousand Vietnamese Dong).

4. Project operation duration: 50 years (calculated from the date the investor obtained the decision of land delivery, the decision of land lease, or the decision of land use purpose change).

5. Project implementation schedule: 02 (two) years from the date of having investor approval decision.

6. Project implementation location: Duc Hoa Ha commune, Duc Hoa district, Long An province.

7. Land area: about 131,753 m2

8. Land use purpose: Implement according to the provisions of land law.

9. Deadline for submitting application for project implementation registration: Before 17:00 P.M. of May 31, 2024.

10. Contact information

Department of Planning and Investment of Long An province

+ Address: 61 Truong Dinh, Ward 1, Tan An city, Long An province.

+ Phone number: (0272) 3886 009 - (0272) 3826 199.

+ Fax number: (0272) 3825 044.

+ Email: skhdt@longan.gov.vn

- Other information about the project:

+ See full project information at https://muasamcong.mpi.gov.vn and Notice of Invitation for Interest at https://skhdt.longan.gov.vn/

+ See Decision No. 12405/QD-UBND dated December 29, 2023 of Long An Province People's Committee on approving the investment policy of Binh An Duc Hoa Urban Area project, in Duc Hoa Ha commune, Duc Hoa district, Long An province; Decision No. 533/QD-UBND dated January 16, 2024 of the People's Committee of Long An province on approving the project investment policy adjustment of Binh An Duc Hoa Urban Area, in Duc Hoa Ha commune, Duc Hoa district, Long An province; Detailed construction planning at 1/500 scale for Binh An Duc Hoa Urban Area, Duc Hoa Ha Commune, Duc Hoa District, Long An Province at Decision No. 3763/QD-UBND dated April 15, 2022 of Duc Hoa District People's Committee.

11. The Investors are interested and have need to register the project implementation

- Prepare documents according to the forms in the appendix attached to Decision No. 3049/QD-UBND dated April 2, 2024 of Long An Province People's Committee on approval of preliminary request on capacity and experience of investors registering to implement investment project of Binh An Duc Hoa Urban Area, in Duc Hoa Ha commune, Duc Hoa district, Long An province.

- Must carry out procedures to be issued digital certificate on the National Bidding Network System.

- Investors submit project implementation registration documents on the National Bidding Network System.

With the above content, Department of Planning and Investment of Long An province invites the interested investors submit the application for project implementation registration./.