Skip Ribbon Commands
Skip to main content

Skip Navigation LinksIntroduction

 
Introduction - Administrative apparatus
 
Associations and Unions  
 
Districts and Cities  
 
Members of People’s Committee of Long An Province for the term of 2016 - 2021 
 
Departments, Committee and Branches  
 
Members of People's Council of Long An Province for the term of 2016 - 2021 
 
 
  
  
Tóm tắt
Nội dung
  
  
  
Long An and Binh Duong cooperate for investmentLong An and Binh Duong cooperate for investment
On April 15th, former President – Truong Tan Sang; Standing Deputy Prime Minister –Truong Hoa Binh; Secretary of the Provincial Party Committee, Chairman of the People’s Council of Long An province – Pham Van Ranh; Secretary of the Provincial Party Committee of Binh Duong province – Tran Van Nam, and leaders of departments, branches and enterprises of Long An and Binh Duong provinces attended the Investment Cooperation Conference between the two provinces held in Can Giuoc district (Long An province).

On this occasion, the delegation actually visited Long An International Port in Tan Tap commune, Can Giuoc district. General Director of Long An Industrial Park Joint Stock Company – Ho Minh Tuan provided the delegations with information about Long An International Port project. Long An International Port project has a scale of 1,935 hectares which is divided into 4 projects, including: Industrial park, Industrial service, urban residential area, and seaport. With the investment of synchronous and modern infrastructure, leaders of Long An Industrial Park Joint Stock Company hope to call for investors as well as partners to invest in the port more.​​

Long An va Binh Duong hop tac đau tu 1542018.jpg

Leaders and departments, branches of the two provinces will coordinate to support enterprises in the process of project implementation

At the conference, the leaders of Long An and Binh Duong provinces agreed to cooperate between the two provinces. In particular, Binh Duong province, with its strengths in industrial, service and urban development, will support Long An province in calling for investment and implementation of investment projects on infrastructure, industry, service and urban sector. Long An will support investors in the process of land clearance, resolving legal procedures, speeding up the progress of investment in infrastructure, especially the infrastructure connecting key industrial parks.

The leaders of the two provinces also said that, Becamex IDC Corporation and Long An Industrial Park Joint Stock Company need a breakthrough to remove difficulties to accelerate the project progress; leaders and departments, branches of the two parties should coordinate to support enterprises in the implementation of this project./.

Reported by Phuong Canh-That Huy

  Translatedby Lan Vy​

17/04/2018 3:00 CHĐã ban hành/PublishingImages/2018-11/Long An va Binh Duong hop tac đau tu 1542018.jpg
People’s CommitteePeople’s Committee
Members of People’s Committee of Long An Province for the term of 2016 - 2021

 

1Trần Văn Cần.jpg

1. Chairman: Mr. Tran Van Can, Deputy Secretary of the Provincial Party Committee

Date of Birth: 1962

Ethnic: Kinh

Religion: None

Place of birth: Hiep Thanh commune, Chau Thanh District, Long An Province

Date of joining the Party: 20/2/1985

Qualifications:

+ Education: University

+ Profession: University of Party and State Government Construction

+ Politics: High-ranking

Be responsible for all activities of the Provincial People's Committee, directly responsible for the following sectors: planning, organization - personnel administrative reform, inspection, judiciary, anti-corruption, citizen welcoming and settlement of complaints and denunciations from the citizens, internal affairs, external affairs and border affairs, emulation and commendation. 

​​

 Nguyễn Văn Út.jpg

2. Vice Chairman: Mr. Nguyen Van Ut  -  Member of Executive Committee of the Provincial Party Committee

Date of Birth: 30/12/1969

Ethnic: Kinh

Religion: None

Place of birth: Bình Hòa Nam commune, Duc Hue District, Long An Province

Date of joining the Party: 05/4/1997

Qualifications:

+ Education: Master

+ Profession: Economics

+ Politics: High-ranking

3Pham Van Canh.JPG

3. Vice Chairman: Mr. Pham Van Canh -  Member of Executive Committee of the Provincial Party Committee

Date of Birth: 1/1/1963

Ethnic: Kinh

Religion: None

Place of birth: An Nhut Tan commune, Tan Tru District, Long An Province

Date of joining the Party: 21/7/2006

Qualifications:

+ Education: University

+ Profession: Bridge and Road Engineer

+ Politics: High-ranking

To be responsible for specific tasks in the fields of: agriculture-forestry-fishery, agriculture promotion, plant protection, veterinary, programs on construction and development of new rural areas, science and technology, natural resources and environment, clean water, cooperative economy, construction, transport.​



phạm-tấn-hòa.jpg

4. Vice Chairman: Mr. Pham Tan Hoa – Member of the Executive Committee of the Provincial Party Committee.

Date of birth: January 02nd, 1973
Ethnic group: Kinh
Religion: No
Home town: Tan Binh Thanh commune, Cho Gao district, Tien Giang province 
Admitted as a member of Communist Party of Vietnam on: 7/8/1999 
Academic level:
+ Education: Master 
+ Qualification: Economics   
+ Politics: Advanced​


 

6Nguyen Van Bon So Noi vu.jpg

5. Member: Mr. Nguyen Van Bon - Member of Executive Committee of the Provincial Party Committee - Director of Department of Home Affairs

Date of Birth: 1960

Ethnic: Kinh

Religion: None

Place of birth:  My Yen commune, Ben Luc District, Long An Province

Date of joining the Party: 30/3/1989

Qualifications:

+ Education: University

+ Profession: Bachelor of Laws

+ Politics: Bachelor 

Mr. Nguyen Van Bon, Director of Department of Home Affairs, is in charge of internal affairs.​


 

vo-minh-thanh.jpg

6. Member: Mr. Vo Minh Thanh - Director of the Department of Director of Department of Natural Resources and Environment

Date of Birth: 13/8/1978

Ethnic: Kinh

Religion: None

Place of birth:  My Hanh Tay commune, Duc Hue District, Long An Province

Date of joining the Party: 25/4/2006

Qualifications:

+ Education: Master

+ Profession: Law

+ Politics: High-ranking 



 

Nguyễn Thanh Truyền.jpg

​7. Member: Mr. Nguyen Thanh Truyen  – Director of the Department of Agriculture and Rural Development 

Date of birth: March 15th, 1964
Ethnic group: Kinh
Religion: No
Home town: Vinh Tri commune, Vinh Hung district, Long An province
Admitted as a member of Communist Party of Vietnam on: November 10th, 1992
Academic level:
+ Education: University
+ Qualification: Administration
+ Politics: Advanced​​​


 

11Le Minh Duc.jpg

8. Member: Mr. Le Minh Duc - Director of Department of Industry and Trade

Date of Birth: 11/8/1960

Ethnic: Kinh

Religion: None

Place of birth:  Tan Kim commune, Can Giuoc District, Long An Province

Date of joining the Party: 25/2/1989

Qualifications:

+ Education: University

+ Profession: Bachelor of Economics; Bachelor of Party Construction and State Management

+ Politics: High-ranking 

Mr. Le Minh Duc - Director of Department of Industry and Trade​ is in charge of industry and trade.


 

14Nguyen Van Hoc.jpg

9. Member: Mr. Nguyen Van Hoc  -  Member of Provincial Party Committee - Director of Department of Transport

Date of Birth: 10/2/1961

Ethnic: Kinh

Religion: None

Place of birth:  My Thanh Dong commune, Duc Hue District, Long An Province

Date of joining the Party: 08/4/1986

Qualifications:

+ Education: Bachelor

+ Profession: Economics

+ Politics: High-ranking

 Mr. Nguyen Van Hoc  - Director of Department of Transport is directly in transport.


 



15Nguyen Thanh Tiep.JPG

10. Member: Mr. Nguyen Thanh Tiep  -  Director of Department of Education and Training

Date of Birth: 20/12/1966

Ethnic: Kinh

Religion: None

Place of birth:  Lac Tan commune, Tan Tru District, Long An Province

Date of joining the Party: 29/8/1991

Qualifications:

+ Education: Master

+ Profession: Education

+ Politics: High-ranking

Mr. Nguyen Thanh Tiep   Director of Department of Education and Training is directly in charge of  education and training.

nguuyen-hong-mai.jpg

11. Member: Mrs. Nguyen Hong Mai- Director of Department   of Labor, War Invalids and Social Affairs

Date of Birth: 23/8/1969

Ethnic: Kinh

Religion: None

Place of birth: Long Thuong commune, Can Giuoc District, Long An Province

Date of joining the Party: 10/6/1993

Qualifications:

+ Education: University

+ Profession: Pedagogy of Literature

+ Politics: High-ranking



Lê Quốc Dũng.png

1​2. Member: Mr. Le Quoc Dung – Director of the Department of Science and Technology.

Date of birth: June 06th, 1970
Ethnic group: Kinh
Religion: No
Home town: Binh Thanh commune, Duc Hue district, Long An province
Admitted as a member of Communist Party of Vietnam on: September 13th, 2002
Academic level:
+ Education: Master
+ Qualification: Chemical Engineer, Bachelor of Administration, Master of Political Science
+ Politics: Advanced​​​​​​​

Huỳnh Minh Phúc.jpg

13. Member: Mr. Huynh Minh Phuc – Director of the Department of Health.

Date of birth: February 10th, 1965
Ethnic group: Kinh
Religion: No
Home town: An Ninh Tay commune, Duc Hoa district, Long An province
Admitted as a member of Communist Party of Vietnam on: August 05th, 1996
Academic level:
+ Education: Master
+ Qualification: Specialized Doctor for Medical Management
+ Politics: Advanced



Nguyễn Bá Luân.jpg

14. Member: Mr. Nguyen Ba Luan - Director of Department of Information and Communications

Date of Birth: 22/6/1964

Ethnic: Kinh

Religion: None

Place of birth: Dương Xuan Hoi commune, Chau Thanh District, Long An Province

Date of joining the Party: 02/7/1993

Qualifications:

+ Education: Master

+ Profession: Politics

+ Politics: High-ranking



 16 Nguyen Anh Dung.JPG

15​​​. Member: Mr. Nguyen Anh Dung  -  Director of Department of Culture, Sports and Tourism

Date of Birth: 02/9/1963

Ethnic: Kinh

Religion: None

Place of birth:  Tan Kim commune, Can Giuoc District, Long An Province

Date of joining the Party: 12/9/1994

Qualifications:

+ Education: University

+ Profession: Agriculture Economics, Administration

+ Politics: High-ranking 

Mr. Nguyen Anh Dung   Director of Department of Culture, Sports and Tourism is directly in charge of culture, sports and tourism.


 

17 Do Thanh Son.jpg

16​​. Member: Mr. Do Thanh Son - Director of Department of External Affairs

Date of Birth: 18/10/1962

Ethnic: Kinh

Religion: None

Place of birth:  My Cam commune, Cang Long District, Tra Vinh Province

Date of joining the Party: 25/02/1989

Qualifications:

+ Education: Bachelor

+ Profession: Law

+ Politics: High-ranking

Mr. Do Thanh Son - Director of Department of External Affairs is directly in charge of external affairs.


Lê Hồng Nam.jpg ​

17. Member: Mr. Le Hong Nam – Director of the provincial Police.

Date of birth: June 05th, 1966
Ethnic group: Kinh
Religion: No
Home town: Tan An ward, Thu Dau Mot town, Binh Duong province  
Admitted as a member of Communist Party of Vietnam in: November 1990
Academic level:
+ Education: Master
+ Qualification: Investigation of crimes infringing on social safety
+ Politics: Advanced​



  

20 TRAN VAN TRAI.JPG

18​​. Member: Mr. Tran Van Trai - Member of Standing Committee of the Provincial Party Committee - Commander of Provincial Military High Command

Date of Birth: 12/3/1967

Ethnic: Kinh

Religion: None

Place of birth:  Lac Tan commune, Tan Tru District, Long An Province

Date of joining the Party: 29/7/1988

Qualifications:

+ Education: University

+ Profession: Bachelor of Military

+ Politics: High-ranking

Mr. Tran Van Trai, Commander of the Provincial Military Command is directly in charge of national defense and in charge of operations of Tan Tru District.

​ 

06/07/2018 10:00 SAĐã ban hành/PublishingImages/2018-07/to-chuc-bo-may.jpg
Tan An CityTan An City
The City has 9 wards and 5 communes with the total natural area of 8,194.94 ha, and population of 130,806  according to the census up to 21/5/2013 in which district 1 is the economic, political and cultural center of the city and the remaining wards-communes including: ward 2, ward 3, ward 4, ward 5, ward 6, ward 7, Tan Khanh ward, Khanh Hau ward and communes of Loi Binh Nhon, Huong Tho Phu, Nhon Thanh Trung, Binh Tam, An Vinh Ngai.

​Tan An City is located in the Southwest of Ho Chi Minh City, about 47 km away from HCMC and shares the borders with the following administrative units: the North adjoins to Thu Thua district; the East adjoins to Tan Tru District and Chau Thanh district; the West and Southwest adjoin to Tien Giang province. ​

Tan An City is the political, cultural, economic, science and technology center of Long An province. The city is located on the development axis of South Key Economic Zone as the economic gateway of Mekong River Delta Region provinces with the main waterway and road network running through the center of National Highway IA, National Highway No. 62 and Cam Co Tay River.

The above mentioned geographical location has given Tan An City the relative advantage in terms of economic and geographical to promote the socio-economic development of Long An Province in general and Tan An City in particular.

17/03/2015 11:25 SAĐã ban hành
 Long An International Sea Port  Long An International Sea Port
The Long An port project is a 1,925 hectare project in Can Giuoc district, Long An, South of Ho Chi Minh City and about 30 km to center of Ho Chi Minh City. Project is divided into four components, comprising a 396 ha industrial park, 236 ha industrial service area, 1,145 ha residential area and a 147 ha seaport with 2.6 km of frontage along Soai Rap river.

I. LOCATION AND ACCESSIBILITY OF LONG AN INTERNATIONAL SEA PORT

The project has many advantage conditions of site and accessibility

Distance to HCM city center of approximately 30 km by national way 50; To HCM city - Trung Luong highway of 30km; To Hiep Phuoc Port of 7 km by river way.

Adjacent to HL19 (Ben Luc – Tan Tap Road); Tan Tap – Long Hau Highway; and Ring Road No.4.

Distance to estuary of East Sea of 15 km by Soai Rap river way;

Easy to access Vam Co river system and Cho Gao canal which is arterial waterway connected to the Mekong Delta.

Soai Rap River can welcome the 50,000 DWT vessel at the present and 70,000 DWT vessel in the future.

long An international sea port 02.jpg 

Long An international sea port

II. LONG AN PORT INFORMATION

-           Land area about 147ha.

-            Running 2.6km along the Soai Rap River.

-           Seven international wharves with 1.67 km long to handle ships weighing between 30,000 and 70,000 deadweight (DWT) and six wharves with 0.4 km long for domestic inland ships of 1,000 DWT.

-           Its loading and unloading capacity is expected to reach 2.5 million tons/year in the first phase in 2015, increasing to 9.3 million tons in the 2nd phase and 15 million tons in the 3rd phase.

-           The first wharf have been constructed and expected to finish in the beginning of 2015.

cang-quoc-te-Long-An-03.jpg 

Master Plan of The Long An port project

- Present condition: Area 396 ha, most of the area is agricultural land and residential area. Convenient infrastructure connections.

- Project goals: Integrated industrial parks and infrastructure to attract investments.

- Total estimated capital: US $86 million.

- Investors: the Long An S.E.A Industrial Park Joint. Calling for potential investments to cooperate.

- Progress: 
+ Had Detail plan, scale 1/2000.
+ Carrying out site clearance and constructing infrastructure.

- Uban policies: Have many preferred policies about land rent, tax policy as well as provincial policies.

III. PICTURES

cang-quoc-te-Long-An-04.jpg 

cang-quoc-te-Long-An-05.jpg

cang-quoc-te-Long-An-06.jpg

cang-quoc-te-Long-An-07.jpg

Source: Long An Economic Zone Authority (LAEZA)​

02/11/2015 1:00 CHĐã ban hành/PublishingImages/2018-11/cang-quoc-te-Long-An-04.jpg
TAN DO INDUSTRIAL PARK, DUC HOA, LONG ANTAN DO INDUSTRIAL PARK, DUC HOA, LONG AN
Location: Duc Hoa Ha commune, Duc Hoa district, Long An province.

khu-cong-nghiep-tan-do-01.JPG

Contact: kcntando.com
Distance to traffic hubs

8 km from National Highway 1A

17 km from the center of Ho Chi Minh City

25 km from Tan Son Nhat International Airport

3 km from Duc Hoa downtown

4 km from Vam Co Dong River

Tan Do I.P. is connected to main traffic lines: National Highway 1A, TransAsia Highway, Saigon

Trung Luong freeway, 825 Road, 830 Road,...

Convenient waterway traffic for transportation of goods, materials from the I.P. to adjacent provinces and Cambodia

khu-cong-nghiep-tan-do-04.JPG

STRENGTHS- Borders to Ho Chi Minh City, convenient for goods transportation
- Complete infrastructure, available for building factories
- Stable power supply (provided by Duc Hoa electricity company)
- Favorable incentives for Corporate Income tax

POSITION

See location map on Google maps

Borders to:
- North: An Ha Cannel
- Southeast: Binh Loi, Binh Chanh District, Ho Chi Minh City 
- West: Hai Son Industrial Park.
INVESTMENT INCENTIVES- Corporate income tax: free of tax for the first 02 years, 50% reduction for the next 04 years. 
- 17% corporate income tax is applied from 01/01/2016
Click here for more detail
PERFORMANCE DURATIONUntil 03/2058
LEASING PRICE AND MODE OF PAYMENTLand leasing price: USD55-65 m2
+ For factory building land: the leasing price is quoted for complete standard infrastucture land lot
+ For residental and service land: depends on their location, area, and using purposes, leasing price for residental and service land will be counted separately for each land lot.
FACTORY LEASE PRICERent: USD 2.5/m2/month
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICESManagement fee: US$ 0.025/m2/month
WATER RATESPrice: VND 14,000/m3 Water source from Ho Chi Minh City QCVN 01:2009/BYT
FEE WASTEWATER TREATMENTFee: USD 0.3/m3 Calculation method: 80% of input water Accepted output wastewater from the investors' plants: type B (QCVN 40:2011/BTNMT)
ELECTRICITY PRICEClick here for more detail
FUNCTIONAL BLOCK- Factory, warehouse building area: 1.628.693 m2
- I.P's administration and service area: 22.249,5 m2
- Technical center area: 20.928 m2
- Traffic system: 188.594 m2
- Pond, park, and green areas: 230.4969 m2
- Garden apartment: 296.390 m2
- Garden villas: 71.808 m2
- Apartment building: 20.586 m2
- Public works and areas: 59.863 m2
LAND USE STRUCTURE
SCOPE OF PERMITTED INVESTMENTS1. Project group for electronics and telecommunications: projects for telecom cable production; projects for electrical and electronic equipment production; projects for electrical and electronic component production; 

2. Project group for mechanical and metallurgic industry: projects for mechanical engineering, machinery and equipment production; projects for sheet metal rolling (not galvanized); projects for steel rolling (from rough shape); projects for building, repairing and assembling carriages, automobiles; 
projects for manufacturing, assembling and repairing motorcycle; projects of defined aluminum production (from rough shape). 

3. Project group for food and beverage processing: projects for seafood processing; projects for alcohol, wine production (not allowed to use treacle materials); projects for confectionery production; project for food processing; projects for beverage production; projects for bottled purified water (not allowed to exploit groundwater); projects for milk production in many kinds; projects for vegetable oil processing;

4. Project group for wood processing, glass and ceramic production: projects for plywood production; projects for household furniture production (excluding the soaking and dipping stage); projects for handicraft production; projects for sanitary porcelain; projects for enameled tile production; projects for bulb and thermos production; projects for wood processing; projects for glass and ceramic production. 

5. Project group for stationery: projects for stationery production. 

6. Project group for textile and garment: projects for undyed textile; projects for garment processing excluding the washing step; projects for industrial laundry; projects for silk and synthetic fiber production. 
7. Project group for building material production: projects for brick and tile production; projects for other building material production (slight polluting sectors). 

8. Project group for chemicals, pharmaceutical products and cosmetics: projects for vaccine production; projects for veterinary medicine production; projects for detergent and additive production; projects for chemical and cosmetic production; projects for pharmaceutical product production; projects for plastic product production; projects for package production (from plastic granules); projects for production of paints, basic chemicals in many kinds; projects for production of additives for footwear sector; 

9. Group of other projects: projects for footwear production; projects for production of tires and tubes in all kinds; projects for production of firefighting tools and products; projects for cardboard package production (excluding the forming process). 

10. Project group for energy, radioactivity: photovoltaic project. 

11. Project group for mining: projects for surface water mining. 

12. Project group for processing of farm
CLIMATELong An is located in a tropical monsoon area; temperature is relatively high all year round with two distinctive rainy and sunny seasons. Duc Hoa district is particularly affected by moonsoon climate. Annual average temperature: 27.7 degrees Celsius
TOPOGRAPHY AND GEOLOGY- Alluvium soil delta, descending from West to East.
- Ground standard height: 2.5 m
- Ground Loading capacity: Rtc = 55.1 kPa
- Underground water: 200 met under ground level
- Ground surface stability: stable
WASTE WATERFollow current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the Government
INFRASTRUCTURE
TRAFFIC SYSTEMInternal traffic systems: with a total length of nearly 30 km, hot asphalt concrete, high loading capacity, is connected to the external traffic system via Provincial Route 10. The main roads with cross section of 42 m , 30 m and 18 m, are planned properly, with trees line and clear sidewalks forming a complete internal traffic system. 
External traffic system: Tan Do I.P. is located next to Provincial Route 824, 825 (P.R. 10) and 830 which are connected to main traffic systems of Ho Chi Minh Highway, National Highway 1A, Xuyen A Highway,... will ease the way for goods transported to and from the I.P. In addition, the I.P is also next to An Ha Cannel linking to Vam Co Dong River provides the I.P with an advantage in transportation to Cambodia and provinces in the West.
ELECTRICITY SUPPLY SYSTEMThe systems of industrial electricity, wastewater and sewage collection, surface drainage, telecommunication, and fire prevention and protection, ....are placed at the plants' fence, ensuring the ability to meet the needs of production, business and living activities throughout the Industrial Park.
WATER SUPPLY SYSTEMTan Do Investment and Construction J.S. Company invested pipneline system leading clean water from Ho Chi Minh City with high capacity, fully supply for the demand of Tan Do I.P and other adjacent I.Ps.
WASTEWATER TREATMENT SYSTEMWith the capacity of 5000m2/24 hours, receives wastewater from investors' plant at class B and provides output treated water at Class A, according to current standards of Vietnam
POST AND TELECOMMUNICATION SYSTEMCommunication system, Internet ... are built modern synchronously to meet the need of the plants' use
PUBLIC UTILITIESTan Do Investment and Construction JSC invests service works to add value for the investors, such as :
- Office services;
- Housing for experts;
- Housing for workers ;
- Medical center;
- Kindergarten;
- School;
- Restaurant, 3 star hotel;
- Trade center, markets;
- Culture-Sport center, ecotourism and entertainment zone
SUPPORTING SERVICES
FREE SERVICES
SUPPORTING SERVICE1. Construction designing consultancy and implemetation: with a team experienced architects, engineers, and skilled workers, Tan Do is capable to provide the whole service package for household and industrial constructions, transportation, water supply and treatment, landscape,.... ensuring for the quality and cost saving. 
2. Supporting services for legal issues: Investments in the Tan Do Industrial Park will be supported by Tan Do Investment and Construction J.S Company in the preparation of legal procedures from investment registration until the operation period of their plant, such as: investment approval, business certificate, environment assessment report, … 
3. Financial assistance: when an investor has loan demands to pay a transfer amount/land rental or to build workshop, Tan Do Investment and Construction J.S Company will support such investor in bank loan procedures at the Asia Commercial Bank with favourable conditions and interests, using the transferred land as a mortgage.
TYPICAL CLIENTSDuy Tan Long An Plastic J.S. Co. 
Dong Khanh Textiles and Garment J.S. Co.
CUSTOMER LISTClick here for more detail

Source: Long An Economic Zone Authority (LEAZA)

02/12/2016 2:00 CHĐã ban hành/PublishingImages/2016-12/khu-cong-nghiep-tan-do-01.JPG
KIZUNA RENTAL SERVICED FACTORY, CAN GIUOC, LONG ANKIZUNA RENTAL SERVICED FACTORY, CAN GIUOC, LONG AN
Location: Quoc Lo 50, Tan Kim Ward, Can Giuoc District, Long An Province

Khu nha xuong dich vu kizuna 01.jpg

Contact: www.kizuna.vn
Distance to traffic hubs

Away from HCMC: 0,3 Km;

Away from City center: 19 km (Ben Thanh market);

Away from Phu My Hung town: 16 km;

Away from Saigon Port: 19 km

Away from Cat Lai Port: 26 km

Khu nha xuong dich vu kizuna 04.jpg

STRENGTHS- Green - clean - beautiful factory system suitable for the food and high-tech industry
- 02 national power supplies to help stabilize production
- 03 - layer security system to help secure assets
- Support Investment Certificate and sublicenses
- Multi - languages speaking staff 
- Flexible payment policy
- Develop business community inside the area
- Services are designed based on demands

POSITION

See location map on Google maps

- Away from HCMC: 0,3Km
- Connected to HCMC through Quoc Lo 50
- Away from Hiep Phuoc International Port: 12 Km
INVESTMENT INCENTIVESTax exemption in the first 02 years, 50% tax reduction in the next 04 years. Corporate income tax is 20%.
Please refer here
PERFORMANCE DURATIONLeasing term up to Year 2058.
LEASING PRICE AND MODE OF PAYMENT
FACTORY LEASE PRICE3.9 - 4.8 USD/m2/month
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICESRental fee included management fee, maintenance fee and security fee.
WATER RATES
FEE WASTEWATER TREATMENT+ Wastewater level A: 3.000 VND/m3 + Wastewater level b: 4.800 VND/m3 + Domestic Wastewater: 4.000 VND/m3
ELECTRICITY PRICE
FUNCTIONAL BLOCK
LAND USE STRUCTUREKizuna 1:
Total area: 58.000m2
Workshop area: 23.500m2
Kizuna 2:
Total area: 45.000m2
Workshop area: 30.440 m2
SCOPE OF PERMITTED INVESTMENTSAgricultural and fishery machinery;
Manufacturing household appliances, plastics, soaps;
Manufacturing furnishing materials, assembled building components;
Food processing, frozen seafood, wood paint production, plating stage in the production process of finished products in mechanics (not plating processing);
Processing industries: food processing, processing of agricultural products, seafood;
Production of fertilizer, animal feed;
Light Industry: precision engineering industry, machinery and repair of machines, equipmenr, spare parts, assembly tools;
Electronics industry, production of machines, spare parts, industrial electrical appliances;
Production of sports instruments, furnishing, office;
Textile, plastics, toys, jewelry, cosmetics;
Production of packaging, typesetting, designing samples, printing;
Casting of non-ferrous metals in small scale: production of electric cables, optical cables;
High-tech industry;
Electronics industry, media, telecommunications media.
Processing, extracting of lubricants.
CLIMATELong An in the monsoon tropical area, near the equator, temperature is high during the year, with two rainy seasons - sunny and rainy season but Duc Hoa District is influenced by rainy monsoon climate. Average annual temperature is 27.7 degrees C
TOPOGRAPHY AND GEOLOGY- Delta sediment, descending from west to east.
- Standard height of land : 2.5 m
- The loading capacity of soil: RTC = 55.1 kPa
- Underground water level: 200m above the ground.
- A stability level of surface cracks: stable
WASTE WATERAccording to current standards of Vietnam
FIRE PREVENTION AND PROTECTIONFire protection and fighting system in compliance with the current regulations of the Goverment
INFRASTRUCTURE
TRAFFIC SYSTEMTransportation system in the industrial park has been completed.
ELECTRICITY SUPPLY SYSTEMIncluding 02 national power supplies: 01 from Giuoc and 01 from HCMC
WATER SUPPLY SYSTEMClean water provided by Water Supply Holland Company - water supplier for the ewhole area of Can Giuoc district and Tan Kim industrial park.
Capacity: 4800 m3/date ensures enough water for manufacturing and consumption in Tan Kim Industrial park.
Water price: According to the price of Water Supply Holland Company.
WASTEWATER TREATMENT SYSTEMWastewater treatment system produced and managed by Asia-Tech Co., Ltd. duction and monitoring according to USBF technology of Europe.
Treatment capacity: 3000m3 / day.
Wastewater after treatment meets standards level A (TCVN5945-95).
Wastewater treatment fee:
- Industrial wastewater: 0.24 USD / m3.
- Domestic wastewater: 0.2 USD / m3.
POST AND TELECOMMUNICATION SYSTEMVNPT Long An is proud to become the provider of telecommunications network for Tan Kim Industrial Park with high-speed fiber optic technology to ensure communication need. Fixed telephone subscription and mobile information. ADSL internet.
PUBLIC UTILITIESProtection - Security
3-layer security system: access control station, fence with alarm, camera system in front of each workshop and professional trained and highly disciplinary security forces provided by reliable security company such as Dong Hai, Quang Trung with the local police force in the industrial park to ensure security for the whole area 24/24.
Fire protection and fighting.
Arranging adequate means of firefighting.
Regularly organize training and periodic rehearsal.
Hygiene
Collection of waste for treatment with waste transfer stations provided by Can Giuoc Urban Project Joint Stock Company.
SUPPORTING SERVICES
FREE SERVICES- Consulting Investment, licensing procedures
- Support Investment Certificate, Branch establishment registration or new business establishment registration
- Newspaper publishing to establish the company (03 continuous series)
- Administrative Services
- Worker recruitment support
SUPPORTING SERVICE- Services of administration, IT, environmental report, shuttle bus, payroll registration, accounting, forklift, translation, office for lease, safety box
- And some services are designed according to demand
TYPICAL CLIENTS
CUSTOMER LISTClick here for more detail http://www.kizuna.vn/en/introduction/list-of-investors-2/
DOCUMENTSprofile Kizuna-Presentation- ENG.PDF

Source: Long An Economic Zone Authority (LEAZA)

Description: http://ipinvietnam.vn/Upload/Gallery/152/Khu%20nha%20xuong%20dich%20vu%20kizuna%2001.jpg
02/12/2016 1:00 CHĐã ban hành/PublishingImages/2016-12/Khu nha xuong dich vu kizuna 01.jpg
NHUT CHANH INDUSTRIAL PARK, BEN LUC, LONG ANNHUT CHANH INDUSTRIAL PARK, BEN LUC, LONG AN
Location: 832 provincial road, hamlet 5, Nhut Chanh commune, Ben Luc district, Long An province

​​khu-cong-nghiep-nhut-chanh-01.jpg

Contact: www.thanhyen.com​

Distance to traffic hubs

Roads

National road 1A 1.2 km

Ho Chi Minh city center: 33km

Boder HCMC: 9km

Tan Son Nhat Airport: 28 km
Ports

Bourbon port 600m

Sai Gon port: 18 km
Airport

Tan Son Nhat Airport: 28 km​

STRENGTHSWaste water treatment plant with capacity 4.000 m3/day
Complete infrastructure, ready to build warehouse
Stable electric system supplying
Locate in Southern major economic area
Own internal river port (Vam Co Dong river)
Bordering with 832 road and far away from national road 1A 1.2 km
Far away from Ho Chi Minh city center 33 km, Tan Son Nhat airport 28 km, Sai Gon port 18 km

POSITION

See location map on Google maps

East: Provincial road No. 832, 1.2 km from National Highway No.1A 
West: Road No. 832 
North: Bac Tan culvert and canal 
South: Nhut Chanh IP project (Phase II-expanding)
INVESTMENT INCENTIVESFree of 02 years, reduce 50% in the next 04 years, company income tax rate 20%.
Click here for more detail
PERFORMANCE DURATIONPeriod of land leasing: to October 2nd, 2057
LEASING PRICE AND MODE OF PAYMENTLand for lease meets all technical requirement of ground leveling, complete infrastructure including road system, water supplying network, electrical system, and underground drainage network...
- Land leasing and transfering price: 1.500.000 - 1.900.000 VNĐ/m2(equal to 70 - 90 USD/m2), not include VAT, depends on land plot location and payment method
- Management charge: 2.183 vnd/m2/year (equal to 0.1 USD/m2/year), not include VAT, annual paid by renter 
- Infrastructure maintenance charge: 655 vnd/m2/month (equal to 0.03 USD/m2/month),not include VAT, monthly paid by renter 
-Wastewater treatment charge: To reach an agreement (6.549 vnđ/m3, equal to 0.3 USD/m3), not include VAT
- Power charge, telephone charge and other services … base on current official list of Long An province area. 
Payment method: 
- Terms of payment: At the present, we supply a preferable payment within 01 year with 04 (four) stages: 20%, 30%, 30% and 20%. Besides, we also apply another suitable payment method which agreed by both our company and investor.
FACTORY LEASE PRICE55.000 - 60.000 VNĐ/m2 (equal to 2.8 - 3 USD/m2), not include VAT
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICES- Management charge: 2.183 vnd/m2/year (equal to 0.1 USD/m2/year), annual paid by renter - Infrastructure maintenance charge: 655 vnd/m2/month (equal to 0.03 USD/m2/month), monthly paid by renter * Above fees not include VAT
WATER RATESFollow price list of Long An Water Supplying Factory, about 8.150 VNĐ/m3 (July 2014)
FEE WASTEWATER TREATMENT- Wastewater treatment charge: To reach an agreement (6.549 vnđ/m3, equal to 0.3 USD/m3), not include VAT
ELECTRICITY PRICEElectricity price is issued by Vietnam Electricity (EVN)
FUNCTIONAL BLOCK- Management zone
- Waste water treatment plant
- Office & warehouse for lease
- Car parking
- International port
- Industrial land for lease or transfer
LAND USE STRUCTURETotal area: 122.75 ha
Industrial and logistical land: 92.12 ha
Land for traffic, ports: 14.38 ha
Land for service and management: 1.3 ha
Land for key technical construction: 1.25 ha
Land for garden, park: 13.7 ha
SCOPE OF PERMITTED INVESTMENTSIndustries are encouraged for investment into Nhut Chanh IP: 
- Processing of agricultural-food and seafood products, milky products and canned food products 
- Manufacturing plastic products, electrical products, aluminum household's products, exported-domestic consumer goods such as home appliances, soap, cosmetic, clothing products, leather and imitation leather goods, shoes and children toys 
- Manufacturing medicines and drugs, veterinary drugs, fertilizer, chemical products serving for agriculture and industry. 
- Manufacturing construction materials, interior decoration products, manufacturing cement and clinker, manufacturing of frame, roof spans or wall spans products. 
- Manufacturing machine-tools, replacement equipment and machinery serving for agricultural and industrial production. 
- Power assembled products, electronic products or assembling mechanical machine or special machinery. 
- Warehouse and port serving for the demand of production. 
- Drink and food processing industry (except sugar producing, alcohol producing and mono sodium glutamate producing industry )
CLIMATELocated in the tropical region under the influence of sub-equatorial monsoon with high temperature and distinctively dry and rainy season in a year. Average temperature reaches 27 C. Annual average humidity is relatively high, around 70% - 80%. West - South wind: from May to November; East - South wind: from December to April
TOPOGRAPHY AND GEOLOGY- Land height: 2.1m
- Compressive strength: 0.082 cm2/kg
- Cohesion strength C: 0.18 kg/cm2
- Natural unit weight: 1.96 g/cm3
- Compressibility coefficient: 1.74 kg/cm2
WASTE WATERFollow current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEM- Road system: Provincial road No. 832 with the approximate width of 68.5 meters including 01 main road in the center (15 meters in width), and 02 double lines with the width of 7.5 meters, having the barrier with the width of 8.5 meters and sidewalk (2 sides) with the width of 7 meters.
- Waterway system: Vam Co Dong river system is one of the main waterway traffic systems in the key economic region of Southern Vietnam, and landing stage and warehouse are scheduled building along Vam Co Dong River with the length of quay about 500 meters 
- Internal road system in Industrial zone is classified logically with 02 main roads 45.25 meters & 50 meters widen. Inside road system has the width of 39.5 meters & 45.25 meters, established with the demand of industrial standards about safety and effectively, such as: fire prevention and protection; emergency medical caring work; cargo and passengers transportation of each factory.
ELECTRICITY SUPPLY SYSTEM- The electrical system belongs to the national electrical grid, supplied by an electrical medium voltage resource (voltage of 22 KV) connecting from 110KV power station at Ben Luc (double electrical circuit). This source will supply electricity to each factory in Nhut Chanh IP through an electrical cable system.
WATER SUPPLY SYSTEM- Water supplying system of Nhut Chanh IP is supplied by Long An Water Supplying Factory.
WASTEWATER TREATMENT SYSTEM- Waste water from factories is collected through the underground piping network and treated in the Sewage Treatment Plant with its capacity 4,000 m3/day in conformity to The Vietnam Environmental Standard before its falling into Vam Co Dong River. The wastewater shall be treated to meet The Vietnam Environmental Standard.
POST AND TELECOMMUNICATION SYSTEM- Establishing the modern and international standard network of Postal & Telecommunication Service; such as to equip and install MDF, telephone system and ADSL provided by a Telecommunication Service and meet all demands of investors.
PUBLIC UTILITIES- Drainage of rainfall and dirty water are separated
- Park system is planned for the whole in order to provide fresh air, prevent air pollution and create beautiful sights and comfortable working environment for the work force
SUPPORTING SERVICES
FREE SERVICES- Business establishment registration
- Custom and accounting registration
- Investment certificate
- Factory construction permit
SUPPORTING SERVICE- On-site custom office
- Stand ready-built factories/warehouses
- Housing experts and workers
- Petrol/liquid petrol gas supplied
- Catering supplied
- Shuttle-bus between major location: HCMC,…
- Banking, shopping area, schools and training centers, hospital,…
TYPICAL CLIENTS
CUSTOMER LIST- Café Outspan Vietnam Co., Ltd
- Greenfeed Vietnam J.S.C
- IBS J.S.C
- B.M.T Investment & Construction J.S.C
- Vina Ge Co., Ltd
DOCUMENTS

Source: Long An Economic Zone Authority (LEAZA)​​

02/12/2016 12:00 CHĐã ban hành/PublishingImages/2016-12/khu-cong-nghiep-nhut-chanh-01.jpg
HAI SON INDUSTRIAL PARK, DUC HOA, LONG ANHAI SON INDUSTRIAL PARK, DUC HOA, LONG AN
Location: Binh Tien 2 Hamlet, Duc Hoa Ha Commune, Duc Hoa District, Long An Province

khu-cong-nghiep-hai-son-01.jpg

Contact: http://www.kcnhaison.com.vn​

Distance to traffic hubs

To National Highway 1A 11km

17 km to the center of Ho Chi Minh City

25 km to Tan Son Nhat International Airport

3 km to center of Duc Hoa 

4 km to Vam Co Dong river 

Hai Son Industrial Park is connected to the important roads such as Highway 1A, Xuyen A highway, Saigon 

Trung Luong freeway, Provincial Road 825, 830 ...

Convenient roa raffic and waterway for transporting goods and supplies from the Industrial park to ports, neighboring provinces and Cambodia

khu-cong-nghiep-hai-son-02.jpg

STRENGTHS- Geology very well include soil, clay, gravel, under basement so the investment costs for the construction of factories reduced, low compared to other regions is 30%.
- Completed wastwater system.
- Border with HCM city, conveniently in freight traffic.
- Complete Infrastructure can build factories immediately.
- Main roads leading into the industrial park 26 m wide, including margins, two sidewalks with many shade trees, the side road 22 meters wide.
- Stable power supply (Power by EVN Duc Hoa)

POSITION

See location map on Google maps

- North: An Ha canal
- East: Binh Loi, Binh Chanh District, HCMC
- West: Hai Son industrial zone.
INVESTMENT INCENTIVESFree of 02 years, 50% in the next 04 years. 17% corporate income tax.
Click here for more detail
PERFORMANCE DURATIONUntil 2058
LEASING PRICE AND MODE OF PAYMENT- Prices sell / lease of land:
Land leased is guaranteed to be properly leveled with completed infrastructure 
- Leasing prices: time varying.
FACTORY LEASE PRICE
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICESManagement fee : 0,03 USD/m²/tháng (chưa bao gồm thuế VAT)
WATER RATES
FEE WASTEWATER TREATMENT
ELECTRICITY PRICEClick here for more detail
FUNCTIONAL BLOCK
LAND USE STRUCTURE
SCOPE OF PERMITTED INVESTMENTSMechanical, metallurgy; textile, apparel; food processing, beverages; chemical manufacturing, pharmaceuticals, cosmetics; type processing, glass manufacturing, ceramics; electronics manufacturing, telecommunications; Group projects in electronics, telecommunications: the manufacture of tools, equipment and components for electrical, electronics and telecommunications, project manufacturing household electrical equipment, cable production project communication; group projects on mechanics, metallurgy: projects that build, repair and assembly of rolling automotive, motorcycle, project manufacturing, assembly, repair, motorcycle, industrial engineering projects : manufacture of machinery, equipment and spare parts for industry, agriculture, forestry (not a stage of molding, forging, plating), project rolling aluminum and steel from ingot materials (non-public paragraph smelting, plating), projects production of metal products and fabricated metal products from raw materials embryo (not a stage of cooking, preparation, plating), projects production of motor vehicles and other means of transport; group projects on weaving, dyeing and garments: Knitwear (not reduce weight, not dyed), the project produced textiles, textile, apparel, footwear; Project group on chemicals, pharmaceuticals, cosmetics: PP production of plastic resins, production of packaging, pharmaceutical production, chemical production projects cosmetics: Detergents, project bottling and packaging vaccines and veterinary drugs (no mixing stage), projects production of paints used in construction, project manufacturing plastics, rubber and plastic products, rubber plastic materials, plastic scrap (unprocessed latex); group projects in woodworking, glass, ceramics: woodworking projects, artificial plywood, wood substitute materials, production of ceramic products, glass; group projects food processing, beverage: food processing projects, food production projects bottled water, beverage, chemical transfer projects, production projects ice, projects to extract, bartender; Other group projects including concrete mixers, welding rod production, packaging and printing, medical equipment manufacturers, materials furnishing, household plastic, project manufacturing jewelery, furniture imitation jewelery and related details, the project of printing and reproduction of recorded media, project leasing warehouse, factory Built with the correct lines on the nature of the zone trades were approved, storage of goods, logistics, business exhibitors and products, project manufacturing, new materials, equipment manufacturing projects, spare parts for electricity production.
CLIMATELong An is located in a tropical monsoon and equatorial area with stable and high temperature background around the year and it has two distinctive rainy and sunny seasons but Duc Hoa dst. is affected by monsoons with more rains. Annual average temperature: 27.7 degrees Celsius
TOPOGRAPHY AND GEOLOGY- Delta sediment, descends from west to east.
- Land height: 2.5 m
- The ability of the soil load: RTC = 55.1 kPa
- Underground water level: 200m above the ground.
- A stable level surface cracks: stability
WASTE WATERFollow current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEMIndustrial Park Road Network:
* Main road:
- Hai Son - Tan Do street is connected to Provincial road 825 11mx2 wide, wide range separates 2m wide sidewalks 4,5mx2.
- Street No. 2: 16m road presence, wide sidewalks 5mx2, width of 36m, the length of 1.583m.
- Road No. 4: 16m road presence, wide sidewalks 5mx2, width of 36m, length 1.670m.
- Road No. 7: 16m road presence, wide sidewalks 5mx2, width of 36m, the length of 1.448m.
- Road No. 9: 16m road presence, wide sidewalks 5mx2, width of 36m, the length of 1.522m.
- Road No. 10: with 16m road surface, sidewalks 5mx2, width of 36m, the length of 1.483m.
* Secondary road:
- Road No. 1: 14m wide road presence, wide sidewalks 4mx2, width of 32m, 660m length
- Road No. 3: 14m wide road presence, wide sidewalks 4mx2, width of 32m, length 1.306m
- Road No. 5: 14m wide road presence, wide sidewalks 4mx2, width of 32m, length 1.383m
- Road No. 6: 14m wide road presence, wide sidewalks 4mx2, width of 32m, length 1.314m
- Road No. 8: 14m wide road presence, wide sidewalks 4mx2, length 1.356m.
ELECTRICITY SUPPLY SYSTEM- Electrical system: from Duc Hoa station 110/22 KV - 40 + 63 MVA 22 kV line through the 825 provincial road leading into Hai Son Industrial park.
WATER SUPPLY SYSTEM- Water supply factory (groundwater) meeting vietnam' standard .
WASTEWATER TREATMENT SYSTEM- Completed waste treatment system
POST AND TELECOMMUNICATION SYSTEMThe modern telecommunication network is established according to international standards such as MDF, telephone system and high-speed internet connection supplied by the post-telecommunication provider which is able to meet all the investors' requirements.
PUBLIC UTILITIES
SUPPORTING SERVICES
FREE SERVICES
SUPPORTING SERVICE
TYPICAL CLIENTS
CUSTOMER LIST- Dong Quang Textile company, Dong Quang vibrant company.
- Duong Vinh Hoa Packing company
- Tuan An company 
- Thanh Cong plastic company
- Chan Hung company
- Gia Huy Thinh company ....
DOCUMENTS

Source: Long An Economic Zone Authority (LEAZA)

02/12/2016 11:00 SAĐã ban hành/PublishingImages/2016-12/khu-cong-nghiep-hai-son-01.jpg
Long An attracted 100,000 visitors in October 2018Long An attracted 100,000 visitors in October 2018
According to the data of the Department of Culture, Sports and Tourism of Long An province, in October, there were about 100,000 visitors in Long An (up 10% over the same period). In which, international visitors were about 1,200 visitors (up 20% over the same period), and revenue reached about 48 billion dong (up 11% over the same period).

Công viên  tượng đài Long An Trung dũng kiên cường toàn dân đánh giặc tiếng anh 7112018.jpg

Long An Monumental Park "Valiant and resilient, all people fight the enemy" attracted tourists. Photo: Luc Nguyen

The tourism industry focused on serving and introducing local history and culture to visitors. In October 2018, 4,000 tourists visited Long An Monumental Park "Valiant and resilient, all people fight the enemy" in Ward 5, Tan An Town.

In November 2018, the tourism industry will organize the appraisal and ranking of tourist accommodation establishments as specified and the work of granting tour guide cards, and tour guide certificates in order to professionalize the travel activities in the locality.​

    Reported by Minh Dang ​ 

Translated by Lan Vy​​

07/11/2018 2:00 CHĐã ban hành/PublishingImages/2018-11/Công viên tượng đài Long An Trung dũng kiên cường toàn dân đánh giặc tiếng anh 7112018.jpg
Long An: “Taking off” for integrationLong An: “Taking off” for integration
In recent 10 years, Long An has become one of the provinces attracting investment capital with a series of projects in industrial parks and clusters and one of the provinces having the highest budget revenue in the Mekong Delta region. Products come from Long An are always known in the domestic markets and friends in the region.

Completion of traffic system – the leverage for industrial economic development

To exploit the strengths of industrial development in 28 industrial parks and 34 industrial clusters, there is no faster and more sustainable solution than the construction of a complete traffic infrastructural system. This system is the attraction and leverage in the industrial economic development, helping Long An's economy "take off".

From the policy of speeding up the construction of traffic infrastructural structure system to serve industrial development, at the Investment Promotion Conference in October 2016, Long An signed 4 investment memorandums with the total investment of VND 14,300 billion and USD 2.5 billion; witnessed the signing of 3 investment cooperation contracts; awarded 12 certificates of investment registration with the investment of VND 4,332 billion and USD 118 million. Also at the Investment Promotion Conference, the province introduced and called for investment in 16 specific projects with the total investment of VND 6,300 and more than USD 7 billion, making Long An become one of the leading provinces in the Mekong Delta region on attracting investment.

Getting closer to international friends

One of the activities that brought Long Anh integrate with international friends is the trade promotion activities. The products originated from Long An: dragon fruit, Fohla banana, non-seed lemon, etc. which are highly appropriated by international friends.

1992017    tieng anhxuc-tien-thuongmai.jpg

Trade promotion activities contribute to bringing Long An to international friends

 1992017 tiennng anh_xuat-khau-nong-san-sang-trung-quoc (1).jpg

Long An's typical products are highly appreciated by international friends

In the future, Long An province will promote trade promotion activities, bringing the province's products to difficult markets in the world: the US, Japan and European countries. This is not just commercial activities, but also introduces Long An's image and development potential to international friends.

Reported by Kien Dinh

Translatedby Lan Vy​

19/09/2017 4:00 CHĐã ban hành/PublishingImages/2018-11/1992017 tieng anhxuc-tien-thuongmai.jpg
Tan Lap floating village to put into operation before Tet holidayTan Lap floating village to put into operation before Tet holiday
Secretary of the Party Committee of Long An province Pham Van Ranh led leaders of Department of Culture, Sports and Tourism, the Tran Thai Group and Thap Muoi Tourism Company to visit and survey Tan Lap floating village- the ecological tourism area in Tan Lap Commune, Moc Hoa District, Long An province on December 6.

Lam-viec-cac-nha-dau-tu lang noi Tan Lap 30122017.jpg

Secretary of the Party Committee of Long An Province has a working session with investors and leaders of relevant departments

Tan Lap floating village located in the heart of Dong Thap Muoi sub-region (also known as the Plain of Reeds) which covers more than 135 hectares of core area and 500 hectares of buffer area. 

The floating village has been known as wetlands with its habitat of indigo forests, lotus, lily, water hyacinth, typical rice of the area; and as the home of many wildlife as birds, stork, fish...

Tan Lap floating village has a special location for tourism exploitation and development being just about 60 kilometers of the northwestward of central Tan An city and about 100 kilometers of the westward of Ho Chi Minh City.

In the past, the Tan Lap floating village was managed by the Department of Culture, Sports and Tourism; after that it was transferred to the Thap Muoi Tourism Company under Tran Thai Group in 2016 for investment and exploitation following the socialization form. 

At present, investors are carrying out construction works, renovating some works including 5 kilometer-long road through the indigo forest, cable car system for visitors, and 32 hotel- rooms on based of renovation of observation tower (including nine floors with 38 meters high). 

Besides, they have also expanded many functional areas as environmental educational center, natural conservation area, wild bird sanctuary, floating houses on piles, park-restaurant area, marina area...

Nhiều-công-ty-lữ-hành-tham-quan,-tìm-hiểu-Khu-du-lịch-Làng-nổi-Tân-Lập30122017.jpg

Many tour operators discover Tan Lap floating village. Photo: Le Duc

The leader of Thap Muoi Tourism Company said that although the Tan Lap floating village does not officially put into operation, it receives around 200 visitors per day, and around 1,000 arrivals per day on weekends.

Secretary Pham Van Ranh said that with the interference location between the Southeast and the Mekong Delta region, bordering with Ho Chi Minh City, located on the national tourism route of Ho Chi Minh City – the Mekong Delta and trans-Asia travel route connecting with Cambodia through the provincial border, Long An has an important strategic position in trade and tourism; in particular, the province has identified Tan Lap floating tourist village as one of the key tourism projects of the province and the region.

During the survey, Secretary of the Party Committee of Long An Province Pham Van Ranh appreciated the efforts and determination of investors in concentrating resources, speeding up the construction adding that the leaders of the province and related departments and agencies will create the most favorable conditions for the Tan Lap floating tourist village to early be completed and officially put into operation before the Lunar New Year of 2018.

Tham quan thực tế các hạng mục đang đầu tư30122017.jpg

On-site visit the investment works

At the same time, Secretary of the Party Committee of Long An Province Pham Van Ranh asked the Department of Culture, Sports and Tourism to continue coordinating with the Tran Thai Group, Thap Muoi Tourism Company and other potential investors to research and form tours connecting from Ho Chi Minh City to the key tourism projects in the province: 

Ecotourism sites of Rach Cat-Can Duoc, Tan Lap floating village, Center of Conservation and Development of Medicine of Dong Thap Muoi, Lang Sen Wetland Reserve, key historical-cultural relic sites of the province which would contribute to the formation of typical tourism products of Long An, meeting rising demand for short-term excursions, typical ecotourism in Dong Thap Muoi …of this potential market from Ho Chi Minh City and the neighboring provinces./.

Source:  http://news.baolongan.vn/

30/12/2017 10:00 SAĐã ban hành/PublishingImages/2018-01/Nhiều-công-ty-lữ-hành-tham-quan,-tìm-hiểu-Khu-du-lịch-Làng-nổi-Tân-Lập30122017.jpg
Long An Province Socio-Economic Development Master Plan up to 2020 and vision to 2030Long An Province Socio-Economic Development Master Plan up to 2020 and vision to 2030
I. DEVELOPMENT ORIENTATIONS
1. Long An Province Socio-Economic Development Master Plan up to 2020 and vision to 2030 must suit the Socio-Economic Development Strategy of the country, Mekong River Delta Region Socio-Economic Development Master Plan; ensure to be synchronous and unified with the industry, sector planning.

2. Promote to the maximum the potentials and advantages of the province; exploiting and using effectively all resources for fast and sustainable socio-economic development and environmental protection; promoting the economic mechanism transition, increasing the growth rate and the competitiveness of the economy.

3. Developing the economy together with ensuring the social progress and justice, protecting the natural resources and environment to step by step increase the living standards of the people, reduce the number of poor households; developing health, culture, education and training. Focusing on training the high-quality human resource to meet the demands of the market, linking the human resource development with the development and application of science and technology.

4. Combining the economic development with the political security and social order protection; ensuring the security and national defense with the location of Long An located in the border region of Mekong River Delta region and in economic integration of Southeast Asia Region and the world.

II. DEVELOPMENT OBJECTIVES

1. General objectives

- Developing Long An to become the province with sustainable and harmonic development between the urban and rural areas; having hi-tech level, synchronous and modern infrastructure system; high-quality human resource; strong national defense-security, ensured social safety and order. Aiming at becoming an industrial province by 2020.

2. Particular objectives

a) Economic:

- The average economic growth rate for period 2012 – 2030 reaches 12.5%/year in which increases to 13%/year for period 2012 - 2020.

- By 2015: the average GDP per capita reaches VND50 million/person/year (around USD2,400); the ratios of the agricultural, industrial and service sectors in the GDP are 28%, 41%, 31% respectively; the revenue for state budget in the province accounts for 10% GDP; the investment capital mobilized from the state budget accounts for 28.5%.

- By 2020: the average GDP per capita reaches VND 80 million/person/year (around USD3,800); the ratios of the agricultural, industrial and service sectors in the GDP are 15%, 45%, 40% respectively; the revenue for state budget in the province accounts for 10.8% GDP; the investment capital mobilized from the state budget accounts for 29.6%.

- Vision to2030: the average GDP per capita reaches VND172 million/person/year (around USD8,000); the ratios of the agricultural, industrial and service sectors in the GDP are 7%, 48%, 45% respectively; the revenue for state budget in the province accounts for 10.8% GDP; the investment capital mobilized from the state budget accounts for 29.6%.

b) Social:

- By 2015:

The natural population growth rate is below 1.2%; the percentage of malnourished children under 5 years is less than 16%; 100% commune health stations meet the standard and 90% communes meeting the national standard on health; providing compulsory preschool education for children of 5 years; 40% - 50% communes, towns, wards meeting the standards of compulsory high school education; 50% schools meeting national standards; the percentage of poor households in accordance with the national standards is less than 3%; the percentage of trained labor is 60%.

Aiming at the objective of 20% (about 36 communes) meet the criteria of new rural commune; 50% communes, wards, towns have the cultural and sports centers; 30% communes, wards, towns meet the cultural standards; 90% of urban households and 95% rural households can access hygienic water and 99.25% households can access power .

- By 2020:

Aiming at reducing the birth rate to 1.46%; the average life expectancy reaches 76 years; the percentage of malnourished children under 5 years is less than 12%; the number of patient bed/10,000 people is 20 beds; the minimum number of doctor/commune is 1 and 8 doctors/10,000 people;

The percentage of poor households in accordance with the national standards is 1%; the percentage of trained labor is 65%; the unemployment rate in urban areas is3%; the ratios of the labors in 3 areas of I, II, III are 28.1%, 37.8%, 34% respectively; the percentage of trained labors is 628,600 and jobs are created for 180,000 people;

The percentages of children going to school are as follows: 100% at primary schools, 95% at secondary schools, 70% at high schools. The percentage of schools meeting national standard is 70%; the number of people with college, university or higher degrees/1000 people is 170 people;

Aiming at the objective of 50% (about 83 communes) meets the criteria of new rural commune; 90% cultural houses at the provincial level; ensuring 100% of districts, city have the cultural, sports centers, 75% communes, wards, towns have the cultural, sports centers; 100% households can access hygienic water and 99.7% households can access power.

- Vision to 2030:

The birth rate reduces to 1.5%; the average life expectation is 78 years; the percentage of malnourished children under 5 years is less than 10%; the number of patient beds/10,000 people is 30 beds; the number of doctors/commune is 3 doctors at the maximum and 10 doctors/10,000 people.

The percentage of trained labors is 70%; the unemployment percentage in urban areas is 2%; the number of trained labors is 762,720 people and jobs are created for 190,000 people;

Aiming at the objective of 100% kindergartens meets national standards; the number of people with degree, university and higher degree/1000 people is 200 people; having 95% cultural houses at the provincial level.

c) Environmental protection:

- Ensuring the green coverage percentage by  2015 reaches 21% and maintained unitl 2020, 2030; increasing the forest coverage percentage to 15% in 2015 and 17%, 19% in 2020, 2030 respectively; the area impacted by the flood (flooding more than 1m) in 2015, 2020, 2030 is 25%, 23%, 20% respectively.

- Aiming at the objective of by 2015, 80% of domestic and industrial solid waste and 100% health solid waste are collected and treated; allocating 100% production establishments causing environment pollution out of the urban areas and residential areas; 100% enterprises commit to protect the environment.

- Raising the awareness of the community and strengthening the capacity for the relevant parties on environmental issues; protecting and exploiting in sustainable way the natural resources; reducing the population and  environmental degradation.

- Ensuring the national defense, security, keeping the political stability, controlling the increase and gradually reducing the crimes and social evils.

III. DEVELOPMENT ORIENTATIONS OF SECTORS, INDUSTRIES

1.Developing agricultural, forestry and fishery sectors: Developing comprehensively aiming at producing high-quality products, protecting the ecological environment and following sustainable development. It is aimed at the average growth rate of 5.7%/year for period 2011 – 2020 and 4.8%/year by 2030; the ratios of the agricultural, forestry and fishery sectors are 82% - 4% - 14% respectively in 2020 and 78% - 6% - 16% respectively in 2030.

- Agriculture: defining rice as the key product to ensure the national food security; following intensive and specialized production, applying advanced technology, using high-quality varieties to increase the production value per unit of farming land and meet the demand of the markets; paying attention on the after-harvesting processing and increasing the quality of export rice. Increasing the production of key products of the province such as sugarcane, vegetables and fruits to meet the standards for domestic consumption and export; step by step controlling the diseases and ensuring the sustainable agricultural growth rate; conforming to the technology procedures in all phases including production, processing to consumption.

Developing animal breeding (pig, cow, livestock) with the suitable scale to meet the demand for domestic consumption; applying advanced breeding technology, producing high-quality products, ensuring food hygiene and safety; strictly controlling diseases and animal pollution from animal breeding activities.

- Forestry: maintaining and protecting the available forest resources to ensure the sustainable forest development; conserving the environment for the wild life, valuable and rare genes in combing with ecological tourism development, especially the specialized forests in which Dong Thap Muoi Region plays an important role in reducing the impacts of climate change and seawater rise. Protecting and issuing suitable policies to maintain the reasonable area of protective forests, combining the forest development with national security in border districts. Exploiting the forest resources reasonably, encouraging investment and production activities and sustainable forest development.

- Fishery: Developing the aquaculture activities in Dong Thap Muoi Region aiming at ecological environment control and protection. Studying to establish the suitable aquaculture models (clubs, cooperatives, economic organizations, farms etc.) to protect the benefits of the parties and promote the goods production; investing in developing the infrastructure to apply the technology in aquaculture.

2. Industrial development

- Developing the industry in sustainable way shall have the impacts on the agricultural and service sectors and become the socio-economic driving force for the province. Aiming at the growth rate of 14.2%/year in 2015, 14.4%/year in 2020 and 13.6%/year in 2030. Paying attention on developing the industries to diversify the products, industries with high percentage of high technology, green and clean criteria.

- Ensuring to provide the suitable infrastructure services for the development of sectors, international business activities; constructing high-quality industrial parks to call for foreign investments; establishing the industry development policies with clear and detailed implementation mechanism, promoting the available resources; ensuring to provide the trained and high-quality labor force at reasonable cost; developing the new sectors to create the key sectors for industrial development of the province in the general background of the industry development of Vietnam.

- Encouraging the industries in accordance with the policies of the province, supporting the existing industries in the South Key Economic Zone such as: high technology, knowledge industry, research and development, environment, new material-based industry, electronic and software production, liquefied petroleum gas (LPG), energy batteries, power production system from hydro etc. developing the agricultural tool industry basing on the existing and relevant agricultural production sectors in the province.

-Focusing on developing quickly, effectively and investing in the infrastructure, attracting the investments into the existing industrial parks and complexes, linking with the construction of waste treatment works, ensuring the green and clean environment.

3.Trade, service and tourism development

Aiming at the growth rate of 17%/year by 2020 and 15.3%/year by 2030.

- Trade, service: developing high-quality and diversified services to meet the demands of the people; improving the infrastructure and services to provide the modern and convenient facilities for the users; balancing the service quality in urban and rural areas.

Developing urban centers with competitive capacity to provide the suitable services combined with space development. Establishing the service centers to exploite the advantage of being located in the gateway of Mekong River Delta Region and South Key Economic Zone. Improving the services serving for industrial development, urban service development such as logistics service, technology and information, utilities, market research, financial service etc.

- Tourism: Developing the comprehensive tourism system including information provision, infrastructure and transport service, high-quality accommodation, diversified cuisine; entertainment areas, high-quality serving human resource. Diversifying the tourism products, promoting the cooperation in tourism development with other provinces in the Region, especially with Ho Chi Minh city and provinces of Cambodia. Tourism development models: ecological tourism, trade village tourism with the cultural values etc.

4. Social sectors

a) Education and training:

- Continue to invest in physical facilities for the schools from kindergartens to universities, increasing the school, classroom network especially in rural, remote, border areas and auxiliary works serving for education and training and considered this as a priority objective of the Province.

- Increasing the qualifications and capacity of the teachers, improving the teaching and learning methods to meet the diversified demand in term of skills and quality as well as to create the legal background and promoting the internal forces for education development.

- Constructing the suitable vocational training structure to meet the demand of the economy, the training must be linked with job creation after training; diversifying the vocational training methods to improve the quality; paying attention on providing vocational training for rural labor, strengthening the network of the vocational schools; increasing the cooperation, association on training with other provinces in the country and foreign countries.

b) Health:

-Developing synchronously the health network; gradually improving the quality of the professional quality and ethics for medical staffs; modernizing the physical facilities, medical equipment, disease examination and treatment, prevention; upgrading the preventive health centers at district level; promoting the socialization to attract the investment capital in investing and constructing the clinics disease treatment associated with relaxation therapy;

- Paying attention on constructing the healty society, increasing the quality of the preventive health system, constructing the health care system for the people; increasing the effectiveness of health communication and education, environmental sanitation, food safety and hygiene;

-Aiming at the objective of implementing the universal health insurance and population, family planning policies, increasing the population quality.

c) Culture, Sports:

- Constructing the advanced, healthy culture with national identity, creating high-quality and typical cultural products of the province; focusing on establishing the synchronous cultural system at all levels, restoring the cultural, historical relics and preserving the traditional cultural values of the nations; 

- Paying attention on developing the sports movements; paying attention on training, fostering high performance athletes; promoting the socialization, attracting the investments for physical facilities and increasing the physical education in the schools.

d) Poverty reduction, job creation and social security:

- Continue the investments into rural infrastructure, gradually finishing the necessary infrastructure such as schools, health stations, traffic roads, commune centers, power, water, irrigation systems for the poor commune and areas with economic difficulties. Developing rural economy, especially farm and household economy, rehabilitating and developing trade villages, developing labor-intensive small and medium-sized enterprises in rural areas; issuing the policies to serve for creating jobs and developing agricultural and fishery production.

e) Science and technology

- Increasing the management by standards and quality of the product and establishing the advanced quality control system; expanding the cooperation in science and technology; standardizing the key agricultural products of the province (rice, dragon fruits, peanut, shrimp etc.)

- Promoting the application of the achievements of science and advanced technology such as biological technology, after-harvesting technology, creating the innovation in varieties of plants, animals of high productivity and value; gradually mechanizing the agricultural production phases. Supporting the enterprises to innovate and apply the technologies at the traditional trade villages;

5. Infrastructure development:

a) Traffic

- Developing the traffic infrastructure aiming at creating modern infrastructure and increase the connection with big urban centers, centers with high growth rates and the regions in the province; ensure the safe, effective transportation of the cargoes and passengers as well as protecting the environment and avoiding such issues as traffic jams, traffic accidents, air pollution; establishing the suitable organization mechanism and institution to create and manage the transportation network and transportation services effectively.

- Developing the traffic network (road and waterway) effectively with high competition and connecting with the regional traffic networks to create the conditions for Long An province to become the real gateway connecting Mekong River Delta region and the South Key Economic Zone; upgrading, improving the rural traffic roads, preventing floods and creating conditions for safe and smooth circulation of the means of transportation; developing the suitable public transport services to meet the demands of the people.

b) Irrigation

- Upgrading and improving the irrigation system in districts of Duc Hoa, Can Duoc and Can Giup to create the conditions for agricultural production; constructing the additional water receiving Canals from Phuoc Hoa Lake; studying to prepare the plan for exploiting the groundwater source; planning to exploit the water from Hong Ngu Canal to supply water for irrigation for the region between Vam Co Dong River and Vam Co Tay river.

c) Power supply

- Upgrading and constructing the power network synchronously, increasing the capacity of the substations to stabilize the power supply source; studying,  constructing the power projects using other energy sources such as: wind, solar etc. at suitable locations;

-Developing the power distribution system to the industrial areas, complexes, tourism areas, residential areas and centralized production areas; gradually undergrounding the urban power system; focusing on rural power network development.

d) Water supply, drainage and environmental sanitation:

-Focussing the investments in upgrading and newly constructing the domestic water supply system for the urban areas to ensure the clean water demand for domestic and production activities of the people; for the rural areas, ensuring the access to hygienic water of the people; basing on the ability to mobilize the capital for each phase, preparing the plan for upgrading and expanding the water treatment plants, transmission and distribution network; implementing effectively the rural clean water and environmental sanitation programs.

- Constructing synchronously the drainage, wastewater collection and treatment systems, especially in urban areas, industrial complexes, preventing the flooding situation in urban areas; collecting and treating health solid waste at the hospitals, health stations; studying to construct the centralized landfills at the urban areas.

e) Information and communication

- Increasing the quality, diversifying the services, providing new services. Applying information technology in constructing the online communication system from the city to the districts

-Modernizing, expanding the network in combination with applying advanced technology in post and telecommunication sector; ensuring the information security to meet the socio-economic development demand.

6. Natural resource and environment protection

- Minimizing the environmental pollution in industrial, agricultural production, service and urban development; promoting the application of clean technology in economic sectors; improving the environmental depression and environmental quality; protecting the biodiversity and ecological environment.

-Managing and protecting strictly and effectively the natural resources, especially land, forest and minerals. Controlling closely the use and treatment of chemicals, pollutants at the business production establishment and households.

7. National defense and security.

- Strengthening the national defense and security; promoting the general strength of the entire political system to construct the people's national defense and security.

- Constructing and developing effectively the national defense methods, managing closely the prevention national defense force to ensure the quality and quantity; combining with the socio-economic development of the province in the development investment planning, plans, programs and projects.

IV. DEVELOPMENT SPACE ORGANIZATION ORIENTATIONS

1. Urban-Rural development

a) Urban development

- Developing the urban area linking Tan An-Ben Luc to support the effective transport and developing the urban areas along the corridor.

- Developing Duc Hoa Urban Area as the role of the service center of the Northeast Region; Can Giuoc Urban Area will be proposed to provide the services for ports (Hiep Phuoc and Long An) as well as the inland area; establishing Moc Hoa Urban Area to be the development center of Dong Thap Muoi Region, developing the border gate to provide the facilities for trade activities through the border.

- Strengthening and upgrading the urban areas such as Can Duoc, Tan Tru, Thu Thua, Hau Nghia, Dong Thanh, Thanh Hoa, Tan Hoa, Tan Hung and Vinh Hung.

b) Rural development

Developing the rural centers to link with: Thanh Hoa-Tan Thanh Urban Complex; Dong Thanh-Hau Nghia Urban Complex; Moc Hoa – Binh Hiep Urban Complex, ensuring the development of high-quality urban services to improve the living standards of the rural people.

Developing Vam Co Dong and Vam Co Tay ecological corridor, ensuring the water supply for domestic and production activities and serving for the transport of the province as well as creating opportunity for developing other ecological activities, meeting the demand of the urban, rural people and tourists.

2.Development of economic zones:

- Zone 1 (Food security, tourism and border gate economy zone): including the districts of Vinh Hung, Tan Hung, Moc Hoa, tan Thanh, Thanh Hoa, Chau Thanh and a part of Thu Thua district, where has the competitive advantage in agricultural production and tourist attraction.

Aiming at developing strongly agricultural, forestry, fishery sectors and ensuring the industrial development to serve for agriculture, rural development; developing services, industries at the border gate economic zones; developing ecological tourism; developing Moc Hoa Urban area to ensure the exchange of trade and service with Dong Thap Muoi Region and Tan An city.

-Zone 2 (Ecological Buffer Area): located between two rivers of Vam Co Dong and Vam Co Tay. This zone is defined as the area to protect Zone 1 from the impacts of the excessive urban and industrial development activities of Zone 3; creating the special landscape in terms of land use and combing the urban and rural features; reducing pollution for Vam Co Dong River and Vam Co Tay River and restoring the space for development orientation after 2020.

In the short run, Zone 2 is defined for agricultural development with the seasonal land fund for industrial development, ecological urban area, interprovincial transfer area. The center of the Zone is Thua Thua town to connect with many economic sub-regions of the province, connect the land border and sea port. Focusing on controlling the development of Zone 2 and only permitting the development in the planned areas along the roads and some other defined areas.

- Zone 3 (Urban and Industrial Development Zone) consists of Vam Co Dong River and districts of Duc Hoa, Ben Luc, Can Giuoc, Can Duoc and a part of Tan Tru district in the downstream, Tan An city and a part of Thu Thua district.

Aiming at urban development and general industry to create the central urban development corridor in Ben Luc-Tan An and typical industrial urban areas in Duc Hoa, Can Giuoc, Can Duoc.​

04/03/2015 3:00 CHĐã ban hành/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
Chau Thanh DistrictChau Thanh District
Chau Thanh district shares borders with Tan An City, about 12 km away from the city center, 52 km following National Highway No. 1A and 42 km following National Highway No. 50 away from Ho Chi Minh city. The North of the district adjoins to Tan Tru District sharing the borders with Vam Co Tay River; the South adjoins to Cho Gao district and Go Cong Tay District of Tien Giang province; the East adjoins to Can Duoc district with the administrative border of Vam Co river; the West adjoins to Chau Thanh district, Tien Giang province. Chau Thanh district has the total natural area of 15,087.83 ha, and population of 107,840 people according to the census up to 21/5/2013.

Chau Thanh district has the convenient waterway and road system to facilitate the agricultural product consumption and application of science and technology to develop the hi-tech agriculture, processing industry, trade-service and become the clue for purchasing agricultural products. Provincial Road No. 827 and the bypass through National Highway No.50 shall be the main external road of the District connecting the economic zones together. On the other hand, Chau Thanh is located adjoining to Vam Co River, near East Sea with many saline areas, at the downstream, there is fresh water source from Cho Gao canal and Bao Dinh canal, therefore, the fresh water is limited (especially in communes of Thanh Phu Long, Thuan My, Thanh Vinh Dong) and there are many saline alluvial areas.​

17/03/2015 10:00 SAĐã ban hành
Departments, Committee and Branches Departments, Committee and Branches
Departments, Committee and Branches

1. LONG AN ECONOMIC ZONE AUTHORITY

Mr. Truong Van Trieu - Director of Long An Economic Zone Authority

Addresses: No. 6​5B Chau Van Giac, Ward 2, Tan An City, Long An Province

Phone number : (0272) 3825445

Fax: (0272) 3825442

Email: bqlkkt@longan.gov.vn

Website: https://bqlkkt.longan.gov.vn/Eng/Pages/default.aspx

Function: Long An Economic Zone Authorit was established on the basis of reorganization of the Management Board of Industrial Parks in Long An province, is directly under the People's Committee of Long An Province; directly performing state management functions for industrial zones, economic zones and border economic zones in Long An province; managing and implementing service-providing functions of public administration and other support services related to investment activities and production business for investors in industrial zones and economic zones, border economic zones in Long An province in accordance with the law

Long An Economic Zone Authority was decided to establish by the Prime Minister, international transaction name is "Long An Economic Zone Authority"; abbreviation is "LAEZA"; subject to the direction and management of the organization, staffing, program work plans and operational expenditure of Long An province; under the direction, guidance and inspection expertise of the operations, administration, industry or sector concerned; shall coordinate closely with the professional bodies of the PPC in the management of industrial zones, economic zones and border economic zones.

2. LONG AN DEPARTMENT OF INDUSTRY AND TRADE 
Mr. Le Minh Duc - Director of Department of Industry and Trade

Address: 112, Cach Mang Thang Tam Street, Ward 1, Tân An City, Long An Province 
Phone number : (0272) 3826 336  

Fax: (0272) 3826 956  

Email: sct@longan.gov.vn

Website: https://sct.longan.gov.vn/Eng/Pages/default.aspx

Function:  Long An Department of Industry and Trade is the specialized organization under Provincial People's Committee and is responsible for providing advices and supporting the Provincial People's Committee to perform the state management functions in industry and trade, including: mechanical, metallurgy, electricity, new energy, renewable energy, chemical, mine and mineral exploitation industry, consumer goods industry, food industry, other processing industries, good circulation in the province, import, export, border trade, market management, competitiveness management, trade promotion, monopoly control, anti-dumping, anti-subsidy, consumer right protection, e-trade; commercial services, economic integration, management of industrial parks and complexes in the province, industry encouragement activities, industrial services under the state management authority of the Department.

3. LONG AN DEPARTMENT OF EDUCATION AND TRAINING

Mr. Nguyen Thanh Tiep - Director of Department of Education and Training
Addresses: 411, National Highway No. 01, Ward 4, Tan An City, Long An Province

Phone number : (0272) 3826394

Fax:(0272) 3832144

Email: sgd@longan.gov.vn

Function:  Long An Department of Education and Training is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee to perform the function of State management of education and training.

4. LONG AN DEPARTMENT OF TRANSPORT

Mr. Nguyen Van Hoc - Director of  Department of  Transport

Addresses: 66 Hung Vuong Street, Ward 2, Tan An City, Long An Province

Phone number : (0272) 3526465

Fax: (0272) 3824725

Email: sgtvt @longan.gov.vn

Function: Long An Department of Transport is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committees in performing the function of State management over transport including: Planning and implementing plans to build the road and river transportation network in the area; Drafting and submitting Provincial People's Committees to promulgate mechanisms, policies, legal documents and sectoral management in their respective localities according to regulations; To organize the implementation of legal documents, plannings, plans, programs, schemes, projects, standards, technical regulations and economic-technical norms in the field of communications and transport. is issued or approved by a competent state agency.

5. LONG AN DEPARTMENT OF PLANNING AND INVESTMENT

Mr. Huynh Van Son​​​​​ - Director of Department of Planning and Investment

Addresses: 61 Truong Dinh Street, Ward 1, Tan An City, Long An Province 
Phone number : (0272) 3837 127

Fax: (0272) 3825 044  

Email: skhdt @longan. gov.vn 

Function: Long An Department of Planning and Investment is the specialized agency of the People's Committee of the province that has the function of advising and assisting the People's Committee of the province to perform the function of State management and investment plans including: synthesis of planning, socio-economic development plans; implementation and proposals on mechanisms and policies of socio-economic management of the province; domestic investment, foreign investment in the locality; management of official development assistance (ODA), non-governmental aid; Bidding; business registration within the locality; synthesis and unified management of business issues, collective economy, private economy; organizations providing public services under the jurisdiction of the department in accordance with the regulations of the law.​​​

6. LONG AN DEPARTMENT OF SCIENCE AND TECHNOLOGY​

Mr.  Le Quoc Dung - Director of the Department of Science and Technology

Addresses: 365, National Highway No. 01, Ward 4, Tan An City, Long An Province

Phone number : (0272).3826249

Fax: (0272).3822093  

Email:skhcn@longan.gov.vn

Website: https://skhcn.longan.gov.vn/Eng/Pages/default.aspx

Function:  Long An Department of Science and Technology is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committees in State management related to science and technology, including science and technology, development of scientific and technological potential; standard, measurement, quality; intellectual property; application of radiation and radioactive isotopes; radiation and nuclear safety; public services in the area of the Department under the management of the province in accordance with the provisions of law.

7. LONG AN DEPARTMENT OF LABOUR, WAR INVALIDS AND SOCIAL AFFAIRS

Mrs​​. Nguyen Hong Mai - Deputy Director in charge of ​ Department​ ​​​of Labor, War Invalids and Social Affairs

Addresses: 76 Nguyen Hue Street, Ward 1, Tan An City, Long An Province

Phone number (0272) 382 6214  

Fax: (0272) 3827 149  

Email: sld@longan.gov.vn

Function: Long An Department of Labor, War Invalids and Social Affairs is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in performing the State management function in the fields, including job; vocational training; labor; salary; social insurance (compulsory social insurance, voluntary social insurance, unemployment insurance); labor safety; people with merit; social protection; child protection and care; gender equality; prevent and fight against social evils (referred to labor, people with merit and social affairs); public services under the management of the Department and perform some other tasks and function as assigned and authorized by the Provincial People's Committee and the provisions of law.

8. LONG AN DEPPARTMENT OF HOME AFFAIRS

Mr. Nguyen Van Bon -  Director of Department of Home Affairs

Addresses: 19 A Tran Hung Dao Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3.826.353  

Fax: (0272) 3.834.028

Email: snv @longan.gov.vn

 Function: Department of Home Affairs is the specialized agency of the provincial People's Committee of  Long An has the function of advising and assisting Provincial People's Committee performs the function of state management of internal affairs, including : organizational structure, staffing and administrative agencies, career state administrative reform, local government, administrative boundaries; officials ,civil servants, state employees, officers and servants of communes, wards and townships organizing, NGOs government; clerical state archives religious; emulate - rewarded. 

9. LONG AN DEPARTMENT OF AGRICULTURE AND RURAL DEVELOPMENT

Mr. Nguyen Thanh Truyen - Director of Department of Agriculture and Rural Development

Addresses: 8T, National Highway No. 01, Ward 5, Tan An City, Long An Province

Phone number : : (0272) 3.826410  

Fax: (0272) 3.822967  

Email: snn @longan.gov.vn

Function: Long An Department of Agriculture and Rural is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committees in performing the function of State management in terms of agriculture; forestry; seafood; irrigation and rural development; flood prevention; the safety of agricultural, forestry, fishery; public services related to the agriculture and rural development sector and performing some tasks and powers under the authorization of the Provincial People's Committee and in accordance with the law.

10. LONG AN DEPARTMENT OF FOREIGN AFFAIRS

Mr. Do Thanh Son - Director of Department of Foreign Affairs

Addresses: 61 Nguyen Hue Street, Ward 1, Tan An City, Long An Province

Phone number : (0272).3553070

Fax: (0272).3553475

Email: sngv@longan.gov.vn

Function: Long An Department of Foreign Affairs is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in state management of external affairs and national border affairs of the locality; public services under the jurisdiction of the Department in accordance with the provisions of law.


 11. LONG AN DEPARTMENT OF FINANCE

Mr. Pham Van Do​​ - Deputy Director in charge of the Department of Finance

Addresses: 57 Truong Dinh Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3824 362

Fax: (0272) 3823 987  

Email: stc@longan.gov.vn

Function: Long An Department of Finance is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in performing the function of State management over finance; State budget; taxes, charges, fees and other revenues of the State budget; State property; State financial funds; financial investment; business finance; accountant; independent auditing; price and financial services activities in the locality in accordance with the law.

Mr. Vo Minh Thanh​​​​ - Director of Department of Natural Resources and Environment

Addresses: 137, National Highway No. 01, Ward 4, Tan An City, Long An Province

Phone number :  (0272) 3826 260  

Fax: (0272) 3823 264  

Email: stnmt@longan.gov.vn

Website: https://stnmt.longan.gov.vn/eng/Pages/default.aspx

Function: Long An Department of Natural Resources and Environment of Long An Province is the specialized organization in charge of supporting Long An Province People's Committee to perform the state management functions on land resources, water resources, mineral resources, geology, environment, meteorology, measurement and mapping; performing the public services in the sectors under the management authority of the Department.

13. LONG AN DEPARTMENT OF JUSTICE

Mrs. Phan Thi My Dung - Deputy​ ​​Director of Department of Justice

Addresses: 151 Nguyen Dinh Chieu Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3829522

Email: phongpbgdpl @longan.gov.vn

Function:  Long An Department of Justice is a specialized agency under the Provincial People's Committees, advising and assisting the Provincial People's Committees in performing the function of State management related to elaborating and monitoring the implementation of legal documents; inspecting and handling legal documents; controlling of administrative procedures; propagating and educating law; authenticating; adoption involving foreign elements; commercial arbitration; civil; nationality; judicial records; lawyer; legal advice; legal aid; judicial expertise; conciliation at grassroots level; auction of assets; the responsibility of the State in compensation; register security transactions; managing the implementation of the law on handling of administrative violations and other judicial work according to the provisions of law.

Mr. Nguyen Minh Hung - Deputy ​​Director of Department of Construction

Addresses:  19 Tran Hung Dao Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3826 169  

Fax: (0272) 3824 746  

Emailsxd@longan.gov.vn

Website: https://sxd.longan.gov.vn/Eng/Pages/Default.aspx

Function: Long An Department of Construction is a specialized agency of the provincial People's Committee, which functions to advise the PPC performing the function of state management in the field of construction; architecture, planning and construction; urban infrastructure, industrial parks, export processing zones, economic zones, hi-tech parks (including transport infrastructure in urban water supply and drainage, waste water treatment, lighting, green parks, cemeteries, urban solid waste, industrial parks, export processing zones, economic zones, high-tech zones); urban development; housing and offices; real estate business; building materials; public services in the field of state management of the facility; perform a number of tasks and powers as assigned, authorized by the PPC and the provisions of law.

15. LONG AN DEPARTMENT OF HEALTH

Mr. Huynh Minh Phuc -  ​Director in charge of the Department of Health

Addresses: 70 Nguyen Dinh Chieu Street, Ward 1, Tan An City, Long An Province

Phone number : 0272. 3826407 - 0272.3829050  

Fax: 0272.3824161 - 0272.3829050

Email: syt@longan.gov.vn

Function: Long An Department of Health is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in performing the function of State management over the care for people's health, including: preventive medicine, medical examination and treatment, functional rehabilitation, traditional medicine, preventive medicine for people, cosmetics affecting human health, food safety and hygiene, medical equipment; public services in the health sector; performing a number of tasks and powers under the authorization of the Provincial People's Committee and the provisions of law.

16. LONG AN PROVINCE INSPECTORATE

Mr. Tran Van Dung​​ - Provincial Chief Inspector

Addresses: 51A Nguyen Hue Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3824 958  

Fax: (0272) 3824 958

Email: ttra@longan.gov.vn

Function: The Province Inspectorate is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in performing the State management function of the inspection and settlement of complaints and denunciations, anti-corruption within the scope of State management of the Provincial People's Committee.

17. OFFICE OF PEOPLE'COMMITTEE OF LONG AN PROVINCE

Mr. Nguyen Thanh Vung​​​ - Office Manager of Provincial People's Committee

Addresses: 61 Nguyen Hue Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3826101

Fax: (0272) 3821858

Email: vpubnd@longan.gov.vn

Function:  The Office of the People's Committee of Long An Province is an agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in organizing the common activities of the People's Committee; To advise and assist the Chairman of the People's Committee and the Vice Chairman of the People's Committees in directing and administering the general activities of the administrative apparatus in their respective localities; To ensure the provision of information for the direction and administration of the People's Committees and presidents of the People's Committees and information to the public according to the provisions of law; To ensure the technical and material conditions for the operation of the People's Committees and the Chairman of the People's Committees.

18. LONG AN DEPARTMENT OF INFORMATION AND COMMUNICATIONS

Mr. Nguyen Ba Luan - Director of Department of Information and Communications

Addresses: 38 Thu Khoa Huan Street, Ward 1, Tan An Ciy, Long An Province

Phone number : (0272). 3523 345

Fax: (0272). 3523 567   

Emailstt@longan.gov.vn

Function: Long An Department of Information and Communications is a specialized agency under the Provincial People's Committee, which is responsible for advising and assisting the Provincial People's Committee in the state management of the press; publish; Postal; telecommunication; radio frequency; Information Technology; electronic; radio and television; external information; news bulletins; background information; communication infrastructure; Advertising in the press, in the network environment, on publications and integrated advertisement on postal, telecommunications and information technology products and services.


19. LONG AN DEPARTMENT OF CULTURE, SPORTS AND TOURISM

Mr. Nguyen Anh Dung - Director of Department of Culture Sports and Tourism

Addresses: 03 Vo Van Tan Street, Ward 2, Tan An City, Long An Province

Phone number (0272) 3826 452  

Fax: (0272) 3832 042  

Emailsvhttdl @longan.gov.vn

Function: Long An Department of Culture, Sports and Tourism is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committees in performing the function of State management related to culture, family, physical education, sports, tourism and advertisement (except advertising in newspapers, computer networks and publications) in the locality, public services under the management of the Department and implementing a the number of tasks and functions under the authorization of the Provincial People's Committees and the provisions of law.​


06/07/2018 10:00 SAĐã ban hành/PublishingImages/2018-07/to-chuc-bo-may.jpg
The planned industrial complexes up to 2020 and vision to 2030The planned industrial complexes up to 2020 and vision to 2030
The planned industrial complexes up to 2020 and vision to 2030

NO.Name of the planned industrial complex Location (district)Area (ha)
1Loc Giang Industrial-Small-scaled Industry Complex Duc Hoa district 74.24
2Long Son Industrial ComplexCan Duc District 48
3Tan Trach  Industrial Complex Can Duc District 44
4Duc Hoa Ha  Industrial ComplexDuc Hoa district 81.67
5Duc Hoa Dong Industrial ComplexDuc Hoa district 87
Total 334.91​
06/03/2015 9:00 SAĐã ban hành/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
Industrial Complexes in Long An Province after reviewing up to 2020 and vision to 2030Industrial Complexes in Long An Province after reviewing up to 2020 and vision to 2030
Industrial Complexes in Long An Province after reviewing up to 2020 and vision to 2030

No.Industrial Complex NameLocation (district, commune)Area (ha)
IIndustrial Complexes having the infrastructure invested, production enterprises operated or registered for operation
1Lien Hung Industrial ComplexDuc Hoa district, Duc Hoa Ha commune32.85
2Duc Hoa Plastic Industrial Complex Duc Hoa district, Duc Hoa Ha commune47.66
3Lien Minh Industrial ComplexDuc Hoa district, Duc Hoa Ha commune35.93
4Hoang Gia Industrial ComplexDuc Hoa district, My Hanh Nam commune128
5Duc Thuan Long An Industrial ComplexDuc Hoa district, Mu Hanh Bac commune46.80
6Duc My Industrial ComplexDuc Hoa district, Duc Hoa Dong 48.92
7Long Cang Industrial ComplexCan Duoc district, Long Dinh commune and Long Cang commune303.89
 Five-Star International Industrial ComplexCan Duoc district, Long Dinh commune13
 Loi Loi Industrial ComplexCan Duoc district, Long Dinh commune25
  Anova Group Industrial ComplexCan Duoc district, Long Cang commune20
 Hoang Long Long Cang Industrial ComplexCan Duoc district, Long Cang commune65
 Kien Thanh Industrial ComplexCan Duoc district, Long Cang commune30
8Loi Binh Nhon Industrial ComplexTan An City, Loi Binh Nhon commune88.39
9Hoang Huong Industrial Complex Tan Thanh district, Tan Binh commune14.30
Total 746.74
IIIndustrial complexes with infrastructure under construction
10Sao Vang Industrial Complex Duc Hoa district, Hoa Khanh Dong commune15.30
11Huu Thanh – Lien A Industrial Complex Duc Hoa district, Huu Thanh commune18.21
12Hiep Thanh Industrial Complex Ben Luc district, Luong Binh commune23
13Vissan Food Processing Industrial Complex Ben Luc district, Luong Binh commune22.40
14

 

Nhut Chanh II Industrial Complex

Ben Luc district, Nhut Chanh commune106.70
15Quoc Quang Industrial Complex Ben Luc district, Luong Binh commune19.16
16Phat Hai Industrial Complex  Can Giuoc District, Phuoc Ly commune24
17Caric-Hong Linh Industrial Complex Can Giuoc District, Phuoc Vinh Dong  commune100
18Hai Son Long Thuong Industrial Complex Can Giuoc District, Long Thuong commune54.60
19 Tan Phu Thinh Industrial Complex Can Giuoc District, Truong Binh commune30
20Thien Loc Thanh Industrial Complex Can Duoc district, Long Son commune18.14
21Phuoc Tan Hung Industrial Complex Chau Thanh District, Phuoc Tan Hung commune50
Total481.51
IIIIndustrial Complexes with the investment procedures under processing
22Hai Son Industrial ComplexDuc Hoa district, Duc Hoa Dong commune297
23ATAD Industrial ComplexDuc Hoa district, Duc Hoa Thuong commune41
24Phong Phu Industrial ComplexBen Luc district, Luong Hoa commune75
25Nam Hoa Industrial ComplexCan Giuoc District, Truong Binh  commune280
26Viet Hoa Nong Industrial ComplexThanh Hoa district, Tan Dong commune29
 27TTCN Binh Tay Industrial ComplexCan Duoc district, Long Khe commune36
28Deep-water port Industrial ComplexCan Duoc district, Long Huu Dong commune and Long Huu Tay commune  500, reduced to 150
29Long Cang Industrial Complex (expanded)Can Duoc district, Long Dinh commune and Long Son commune 557, reduced to 100
Total1,008
IVIndustrial Complexes having the withdrawal decision issued by Provincial People's Committee
30Vinh Phong Industrial ComplexCan Duoc district, Long Son Commune 68
31Hoang Huong I Industrial ComplexTan Thanh district, Kien Binh Commune 50
32Dong Tam Industrial ComplexCan Duoc district, Long Dinh commune and Long Cang Commune 300
33Van Phuc Loc Clean Industrial ComplexTan An City, Ward 715
34TTCN Tan Kim Industrial ComplexCan Giuoc District, Tan Kim Commune 17.40
35Tan Dong Industrial ComplexThanh Hoa district, Tan Dong Commune 187
36Nhat Quang Industrial ComplexCan Duoc district, Tan Trach Commune 30
37Thanh Tai Industrial ComplexCan Duoc district, Tan Trach Commune 70
38Gemadept Industrial ComplexTan An City, Nhon Thanh Trung Commune 80
39Hoang Long II Industrial ComplexBen Luc district, Luong Hoa Commune 38
40Hoang Long I Industrial Complex Ben Luc district, Thanh Phu Commune 266
Total1,121.4​
06/03/2015 9:00 SAĐã ban hành/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
Associations and Unions  Associations and Unions 
Associations and Unions 

​​

1. Provincial Veteran Association

Address: 48, National Highway No.62, Ward 2, Tan An City, Long An Province

Phone number : (0272) 3829453

Email: hoicuuchienbinh@longan.gov.vn

2. Provincial Red Cross Association

Mr Nguyen Van Ghim, Chairman of Provincial Red Cross Association

Address: 03 Vo Cong Ton, Ward 1, Tan An City, Long An Province

Phone number : (0272).3822529

3. Provincial Women Union

Mrs Nguyen Thi Hong Phuc,  Chairman of Provincial Women Union

Address: Song Hanh road, Highway 1A, Ward 6, Tan An City, Long An Province

Phone number : (0272) 3821313

Email: hoiphunutinh@longan.gov.vn

4. Provincial Farmer Association

Mr Pham Chi Tam, Chairman of Provincial Farmer Association

Address: 14 Truong Cong Xuong, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3826 350

Fax: 0272 3835 480

Email: hoinongdan@longan.gov.vn

5. The Ho Chi Minh Communist Youth Union of Long An

Mr Bui Quoc Bao - Secretary of The Ho Chi Minh Communist Youth Union of Long An

Address: Song Hanh road, Highway 1A, Ward 6, Tan An City, Long An Province

Phone number : (0272) 3826 347

Fax: (0272) 3825 029

Email: tinhdoan@longan.gov.vn

6. Provincial Fatherland Front Committee

Mrs Nguyen Thi Ngoc Hanh, Chairman of Provincial Fatherland Front Committee

Address: 24 Truong Cong Xuong, Ward 1, Tan An City, Long An Province

Phone number : (0272). 3826283

Email: mttq@longan.gov.vn

11/07/2018 8:05 SAĐã ban hành/PublishingImages/2018-07/to-chuc-bo-may.jpg
LONG HAU INDUSTRIAL PARK, CAN GIUOC, LONG ANLONG HAU INDUSTRIAL PARK, CAN GIUOC, LONG AN
Location: Long Hau Industrial Park and Long Hau Industrial Park Extended belongs to Long Hau ward, Can Giuoc district, Long An province.

LHC-Nhan vienkcn long hau can giuoc.jpg

Contact: www.longhau.com.vn​

Distance to traffic hubs

12 km from Phu My Hung residential area.

19 km from Ben Thanh market, the central of Ho Chi Minh city.

25 km from Tan Son Nhat international airport.

35 km from Long Thanh international airport (2015).

LHC-Nha dieu hanhmoi kcn long hau can duoc.jpg

LHC-Khu cong nghiep_2 long hau can duoc.jpg

STRENGTHSAdjacent North: Ho Chi Minh city along North – South alignment road (Nguyen Huu Tho road).
Adjacent East: SCCT port, Sai Gon Hiep Phuoc port, Tan Cang – Hiep Phuoc port (Long Hau – Hiep Phuoc road).
2km away from Hiep Phuoc ports including Tan Cang – Hiep Phuoc port (40,000-ton vessel), SPCT port (5,000 TEU), Sai Gon Hiep Phuoc port (50,000-ton vessel).

POSITION

See location map on Google maps

Long Hau Industrial Park and Long Hau Industrial Park Extended belongs to Long Hau ward, Can Giuoc district, Long An province.
Adjacent North: Ho Chi Minh city along North – South alignment road (Nguyen Huu Tho road).
Adjacent East: SCCT port, Sai Gon Hiep Phuoc port, Tan Cang – Hiep Phuoc port (Long Hau – Hiep Phuoc road).
2 km away from Hiep Phuoc ports including Tan Cang – Hiep Phuoc port (40,000-ton vessel), SPCT port (5,000 TEU), Sai Gon Hiep Phuoc port (50,000-ton vessel).
12 km from Phu My Hung residential area.
19 km from Ben Thanh market, the central of Ho Chi Minh city.
25 km from Tan Son Nhat international airport.
35 km from Long Thanh international airport (2015).
Click here to find us on Google Map: http://goo.gl/maps/hMrmo
INVESTMENT INCENTIVESFree of 02 years, 50% in the next 04 years. 20% corporate income tax.
Click here for more detail
PERFORMANCE DURATIONUntil 05/2059
LEASING PRICE AND MODE OF PAYMENTFrom 85.00 USD/m2,
FACTORY LEASE PRICEFrom 3.90 USD/m2including administration, maintenance, security…
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICESinfrastructure management fee 0,035 USD/m2/month
WATER RATES
FEE WASTEWATER TREATMENT
ELECTRICITY PRICEClick here for more detail
FUNCTIONAL BLOCK- Food processing area
- Construction material area (no cement, iron casting)
- Logistic area
- Supporting industry area
LAND USE STRUCTURE70% area has been leased.
- Current area: 141 ha
Land for industrial factories: 90,74 ha
Land for administration and services: 5.23 ha
Land for technical constructions: 2,12 ha
Land for green space: 24,67 ha
Land for traffic: 19,59 ha
- Extended area: 108 ha
Land for industrial factories: 61,48 ha
Land for administration and services: 21,03 ha
Land for technical constructions: 1,12 ha
Land for green space: 11,07 ha
Land for traffic: 13,78 ha
SCOPE OF PERMITTED INVESTMENTS1. Food processing. Sea food processing.
2. Supporting industries.
3. Warehouse, logistic.
4. High-tech, R&D industries.
5. Mechanical installation. High precision mechanic.
6. Construction material (no cement and iron casting)
7. Low toxic chemical production and processing.
8. Manufacturing products from wood and bamboo.
9. Package printing and related services (no ink production).
10. Consumer goods.
11. Fashion and textile.
CLIMATELong An is in humid monsoon tropical climate. As being bordered by the South East and South West, it is both of specific characteristics of the Mekong River Delta and of its special characteristics of the East Sea. The monthly average temperature is 270C. The annual average humidity is 70-80%. In dry season from November to April, there is north-easterly wind with frequency of 60-70%. In rainy season from May to October, there is south-westerly wind with frequency of 70%.
TOPOGRAPHY AND GEOLOGY- Topography: alluvial delta, lower from West to East.
- Land high standard: 2.5 m
- Soil bearing capacity: Rtc= 55.1 kPa
- Underground water level: 200m from ground.
- Surface rupture stability: stable.
WASTE WATERFollow current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEMINFRASTRUCTURE: 100% completed.
- Road system:
Connecting with Ho Chi Minh city via Nguyen Huu Tho alignment road (North - South) with capacity of 10 lane lines.
The traffic network is designed to connect with other neighborcities and provinces:
+ National highway 1A to Mekong delta provinces – Ho Chi Minh – Trung Luong.
+ Long Hau – Tan Tap – National Highway to Mekong delta provinces.
+ Phu Mybridge to Eastern provinces.
+ Ho Chi Minh city belt road system No. 4 - Southern inter-regional highway system.
- Waterway traffic system:
+ Connecting to deep water ports of Ho Chi Minh city including Sai Gon Premier Container Terminal (SPCT) which can receive vessels from 4,000 - 5,000 TEU.
+ Sai Gon Hiep Phuoc portcan receive vessels 50,000 tons.
+ Tan Cang Hiep Phuoc port can receive vessels 40,000 tons.
+ Kinh River port inside Long Hau Industrial Parkcan receive vessel 1,000 tons and barge 2,000 tons, meeting the demand of manufacturers in Long Hau Industrial Park for water transport at low cost. With the average width of 130m and transport depth from 6.8 - 10.3m, Kinh river connects to the most important waterway transportation of Ho Chi Minh city: Sai Gon - Nha Be - Mekong delta provinces, Eastern provinces and the East Sea.
ELECTRICITY SUPPLY SYSTEMStep-down station EVN 110/22KV - 37 MWA (inside Long Hau Industrial Park). Power source: 22 KV - Frequency: 50 Hz
WATER SUPPLY SYSTEMLong Hau Industrial Park has two water supplies:
- Long Hau Underground Water Factory, capacity 10,000m³/day.
- Ho Chi Minh city water supply system, capacity 15,000m³/day.
Water quality complies with Vietnam standard TCXD 33:2006.
WASTEWATER TREATMENT SYSTEMThe central sewage treatment plant with 10,000m2 is in charge of treating pre-treated sewage from factories in Long Hau industrial park. Total treatment capacityis 5,000m3/day.
POST AND TELECOMMUNICATION SYSTEMWhile Long Hau IP is in Long An, the tenants can use Ho Chi Minh city's phone number and the most advanced telecommunication technologies including cable internet, leased line… to make sure telecommunication always works properly, saving costs of calling to Ho Chi Minh numbers.
PUBLIC UTILITIES- Customs.
- Dormitory for workers and executives.
- Security (police station 2,000m2and Long Hau IP's security force).
- Clinic.
- Mini mart.
- Recreation service.
- Kindergarten.
- Fire prevention and firefighting system.
- Banks.
- Restaurant.
- Sports center.
SUPPORTING SERVICES
FREE SERVICES
SUPPORTING SERVICE- Investment certification
- Incorporation
- Recruitment and training
- Environment protection consulting
- Legal consulting
- Shared office
- Warehouse
TYPICAL CLIENTSAt the moment, there are 122 tenants in Long Hau Industrial Park and Long Hau Industrial Park Extended, in which there are 46 Japanese investors, 10 Korean investors, 4 Chinese investors (including Hong Kong and Taiwan) and other nations such as USA, Germany, Australia….Puma, Lotte, LocknLock, Nippon Harm, Nitta Gelatin
CUSTOMER LISTClick here for more detail
DOCUMENTS

Source: Long An Economic Zone Authority (LEAZA)

02/12/2016 10:00 SAĐã ban hành/PublishingImages/2016-12/LHC-Nhan vienkcn long hau can giuoc.jpg
Long An leader requires Kien Tuong town to focus on commerce-serviceLong An leader requires Kien Tuong town to focus on commerce-service
Long An province Party Committee secretary and People’s Council chairman Pham Van Ranh required Kien Tuong town to focus on developing commerce-services, border trade and industry at a meeting on November 1.

Bí thư Tỉnh ủy Phạm Văn Rạnh phát biểu trong buổi làm việc với BTV Thị ủy Kiến Tường tiếng anh1112018.jpg

Border trade is one of the fields which Long An province Party Committee secretary Pham Van Ranh requires Kien Tuong town to develop

In addition, the town should pay attention to developing hi-tech farming and product consumption connectivity chains.

According to Mr. Ranh, despite lots of efforts having been made, the town has not promoted its development potentials.

Bí thư Thị ủy Kiến Tường Phạm Tấn Hòa 1112018 tiếng anh.jpg

Secretary of Kien Tuong Party Committee informs of implementation of the committee's resolution in the first nine months of 2018

Reporting some achievements obtained in the first ten months of 2018, Kien Tuong town's representative said that production value reached VND3.2 trillion, accounting for 84.8 percent plan. Budget revenue was estimated to hit VND444.7 billion.

Social welfare polices were ensured. National defense and security were stable. The town efficiently implemented breakthrough programs and completed some major works.

Kiến Tường Trung tâm thương mại tiếng anh 3112018.jpg

Kien Tuong Trade and Service Center is among three major works that Kien Tuong has built and put into operation

Source: http://news.baolongan.vn/

03/11/2018 10:00 SAĐã ban hành/PublishingImages/2018-11/Bí thư Tỉnh ủy Phạm Văn Rạnh phát biểu trong buổi làm việc với BTV Thị ủy Kiến Tường tiếng anh1112018.jpg
Phu An Thanh Industrial Park & Sojitz sign cooperation to lure more hi-tech investorsPhu An Thanh Industrial Park & Sojitz sign cooperation to lure more hi-tech investors
Phu An Thanh Industrial Park and Japanese-based Sojitz Corporation yesterday co-signed cooperation program with aim at luring more hi-tech investment projects.

KCN Phú An Thạnh hợp tác đầu tư tin tiếng anh12102018.jpg​​​

Long An leaders witness the signing ceremony between Phu An Thanh Industrial Park and Sojitz Group

Secretary of Long An province Party Committee cum Chairman of the provincial People's Council Pham Van Ranh and Chairman of People's Committee Tran Van Can attended the event.

Chairman Can said Sojitz is the largest Japanese economic Corporation to invest in muti-fields in the province and has many experiences in attracting investment and supplying industrial park's high quality infrastructure services.

Long An authorities hoped that Sojitz would help call for more prestigous foreign investors to invest in Long An's Phu An Thanh Industrial Park, focusing on hi-tech fields to contribute environment protection and the provincial socioeconomic development.

Phu An Thanh Industrial Park covers an area of 692 hectares, locating at An Thanh Commune, Ben Luc District. Up to now, it has attracted 37 domestic & foreign investors with total investment capital up to VND 1trillion and US$ 204million and created over 4,000 jobs for local people.

General Director Tran Van Ngoc of Phu An Thanh Industrial Park shared the cooperation program between the park and Sojitz would increase more efficiency to lure more hi-tech investors, contributing to developing Long An's social economy./.

Source: http://news.baolongan.vn/​

14/10/2018 3:00 CHĐã ban hành/PublishingImages/2018-11/KCN Phú An Thạnh hợp tác đầu tư tin tiếng anh12102018.jpg
Ben Luc districtBen Luc district
Ben Luc district is located in the East of Long An Province where is a strategic location in terms of economy and military of Ho Chi Minh City and the Northern gateway of the Southwest Region. Ben Luc district has the natural area of 28,836 ha, population of 152,794 according to the census on 21/5/2013. The North of the district adjoins to Duc Hoa district, Duc Hue district; the east adjoins to Binh Chanh district, Ho Chi Minh city; the South adjoins to Can Giuoc District, Can Duoc district, Tan Tru district; the west adjoins to Thu Thua district.

National Highway No. 1A is the main traffic axis of the nation connecting the key economic zone of the South with Mekong River Delta region through Ben Luc district, creating the favorable conditions for economic development, cultural exchange and quick access to the latest information of the country, integrating with the market economy, developing many kinds of services and forming the cargo transfer locations between the West region to Ho Chi Minh city and vice versa.

The entire district is divided into 15 administrate units of commune level in which Ben Luc Town is the economic, political and cultural center of the district. The remaining administrative units including commune Thanh Loi commune, Thanh Hoa commune, Luong Binh commune, Luong Hoa commune, Tan Hoa commune, Binh Duc commune, An Thanh commune, Tan Buu commune, Thanh Phu commune, Thanh Duc commune, Nhut Chanh commune, Ben Luc town, Long Hiep commune, My Yen commune, Phuoc Loi commune.​

17/03/2015 11:20 SAĐã ban hành
From October 13th to October 21st, the Vietnam – Japan Trade and Tourism Exhibition 2018 will take place in Long An provinceFrom October 13th to October 21st, the Vietnam – Japan Trade and Tourism Exhibition 2018 will take place in Long An province
On the occasion of the 45th anniversary of establishment of diplomatic relations between Vietnam and Japan (21/9/1973 – 21/9/2018), Long An province will hold the “Vietnam – Japan Trade and Tourism Exhibition 2018 in Long An” from October 13th to October 21st, 2018 at War 3 Park, Tan An City, Long An province.

Thư mời khai mạc hội chợ triển lãm Nhật Bản 12102018.jpg

The Exhibition will be organized on the scale of more than 400 standard booths of provinces, cities and enterprises in order to introduce the achievements of socio-economic achievements and tourism development of each locality; promote and introduce potentials, strengths, products and goods; develop brands; and seek partners and consumption markets.

In particular, this Exhibition will combine many meaningful activities to exchange economy, culture, and promote tourism of Vietnam and Japan.

Reported by TV

​Translated by Lan Vy​

12/10/2018 10:00 SAĐã ban hành/PublishingImages/2018-11/Thư mời khai mạc hội chợ triển lãm Nhật Bản 12102018.jpg
Communication SystemCommunication System
Until the end of 2004, roadways in province was 1.698km, in which asphalt roads were 474km, accounting for 27,9%, gravel roads were 1053km (62%), other kinds of roads were 171km (10,1%) (excluding rural roads).

​/. Road traffic :

Until the end of 2004, roadways in province was 1.698km, in which asphalt roads were 474km, accounting for 27,9%, gravel roads were 1053km (62%), other kinds of roads were 171km (10,1%) (excluding rural roads). Total length of bridge was 15.799 m long/346 bridges, in which concrete bridges were 7.099 md/123 bridges, girder bridges were 6812 md/194 bridges, others were 1889 md/29 bridges. Density of road by area increased from 0,198 Km/Km2 in 1991 to 0,285 Km/Km2 in 2000 and 0,359 km/Km2 in 2004.

Density of road by population increased from 0,667 Km/1.000 persons in 1991 to 0,957 Km/1000 person in 2000 and 1,130 km/1000 person in 2004.

 

In general, roadways system is prioritized to invest, helping actively to develop production and improve living standard of population. However, there also remain some roads not satisfying the demand of transportation, lacking of synchronism between roads and bridges, not forming uninterrupted branches of roads.

 

Most of the Southern communications network has not been increased, mainly improved, upgraded and expanded, except some rural roads. In Nothern region, the communications network has developed rapidly, contributing to reclaimation, reallocation of population. To date, traffic roads are, however, quite scattered in this region, province road only has some roads just for cars, branches of roads accessible to residential clusters have not been built yet. Therefore this has influenced to travel and organization of life of rural people.

 

At present, the system of bridges and roads have been built synchronously in term of capacity in most of main roads from province to district and roads to industrial zones. However, there still remain some roads with low-capacity bridges, constraining the development of cargo transportation.

 

In recent years, although border belt ways have been invested, they are mainly small-scale rural roads, asynchronous bridge roads, inluencing to the national defense and smuggling fighting.

 

In recent years, the construction of rural transportation has become a big movement, combining from the budget and contribution of population. At present, 156 over 188 communes have car roads to the center (accounting for 83%), 32 communes under 7 districts do not have car roads to center, including 18 roads with total length of 126 km and 140 bridges/6637m long.

 

In recent years, the investment in traffic industry has been constantly increased. However, the annual budget for maintenance is low. Therefore the roads are degrading quickly. According to economists, it is necessary for capital given priority to maintain other than to invest in building. It will bring socio-economic efficiency.

 

In recent years, the roadways system has been considered and invested by the province, but in general it is not extensive and synchronous, influencing to the investment attraction and socio-economic development of province.

 

2/.Waterway traffic:

 

Since 1995, the waterways network has not increased, with scale of 2.559 km. Density of waterways by area was 0,59 Km/Km2 and by population was 1,8 Km/ten thousand of people with main waterways of Vam Co river, Vam Co Dong, Vam Co Tay, Rach Cat river . . .

 

Besides, on rural waterways, especially districts in Dong Thap Muoi, people can travel by boats from house to house, from region to region and boats are the main means of transport, means of living of many families in Dong Thap Muoi. Communes where do not have car roads to center will travel by waterways.

 

However, the waterways network, at present, still depends mainly on natural advantage, not developing the existing potentials, lacking in support system such as marking buoy, local waterways signal. The phenomena of appropriation of flow and way of boats, breach of protective corridors of local waterways such as construction of house and building materials yard, holding a market, etc. have not controlled properly. Many waterways have had great siltation through development in many years but they have not dredged and influenced to travel capacity of means.

 

Long An has great potentials of waterways but they are difficulties and obstacles for building road traffic.


19/08/2014 5:00 CHĐã ban hành/PublishingImages/2014-08/ht-giao-thong.jpg
Long An attracted 5 investment projects in the industrial clusters in the first 9 months of 2018Long An attracted 5 investment projects in the industrial clusters in the first 9 months of 2018
From the beginning of the year to date, Industrial clusters in Long An province have received 5 investment projects (in 2 fields: mechanics and plastics) with the area of 3.3 hectares.

Up to now, the whole province has 19 operating industrial clusters with a total area of 904.3 hectares, has leased 586.6 hectares. Industrial clusters attracted 544 projects with a total investment capital of VND15,635 billion. Of these, these are 60 foreign direct investment (FDI) projects with total investment capital of USD 209 million. The occupancy rate of industrial clusters is 86.55%.

Long An attracted 5 investment projects in industrial clusters  in the first 9 months of 2018 18102018.jpg

A production line of a fertilizer enterprise in Tan An City's industrial cluster

In the first nine months of 2018, the provincial People's Committee has set up six industrial clusters covering an area of 379.6 hectares including Hoang Gia, Dua Hoa Dong, Thanh Yen, My Kim, Tan Dong Tien and Tan My.

Besides, the Long An Department of Industry & Trade has proposed People's Committee to establish two more An Long and Tu Phuong industrial clusters. As per result, Long An has now total 40 industrial clusters covering 1,908 hectares.

Reported by Gia Han

Translated by Lan Vy

18/10/2018 3:00 CHĐã ban hành/PublishingImages/2018-11/Long An attracted 5 investment projects in industrial clusters in the first 9 months of 2018 18102018.jpg
Tan Tru districtTan Tru district
Tan Tru district is located in Mekong River Delta Region, between two rivers of Vam Co Dong and Vam Co Tay and is a district located in the Southeast of Long An Province. The district has the North adjoining to Ben Luc District, the East adjoining to Can Duoc District, the South adjoining to Chau Thanh district and the West adjoining to Tan An City and Thua Thua district. Tan Tru district has the natural area of 10,686.60 ha, and the population of 67,246 people according to the census up to 21/5/2013.

​Tan Tru is located at a very favorable geographical location. From Tan Tru Town, the center of the district is about 20km away from Tan An City of the province and only 40km away from Ho Chi Minh City to the South. Tan Tru is the economic-political and cultural center of the district. Tan Tru district consists of the communes of Binh Tinh, My Binh, An Nhut Tan, Que My Thanh, Lac Tan, Binh Lang, Binh Trinh Dong, Tan Phuoc Tay, Duc Tan, Nhut Ninh.​

17/03/2015 10:25 SAĐã ban hành
FloodFlood
Every year flood converges firstly to the Northern districts in Dong Thap Muoi, starting from the beginning or mid August and lasting to November. In this time, the rain has the biggest flow and intensity, causing difficulties for production and life. Flood in Long An province is slow and its level is not deep as upstream but it lasts for longer time.

The frequency of high flood tended to reduce from 1 time for 8 - 10 years in the past, to 1 time for 3 - 4 years (1961, 1966, 1978, 1984, 1991) and high flood had occured for 3 consecutive years (1994, 1995, 1996), especially, flood was very high in 2000.

- Flooding levels according to the natural area in 1996 were as follows:

+ Below 50 cm with flooded area of 50.294 ha, accounting for 13,2 % of the natural area.

+ From 50 - 100 cm with flooded area of 72.360 ha, accounting for 18,99% of the natural area.

+ From 100 -150 cm with flooded area of 63.830 ha, accounting for 16,75% of the natural area.

+ From 150 - 200 cm with flooded area of 94.840 ha, accounting for 24,88% of the natural area.

+ From 200 - 250 cm with flooded area of 66.720 ha, accounting for 17,50% of the natural area.

+ Over 250 cm with flooded area of 33.070 ha, accounting for 8,68% of the natural area.

- Flooding duration:


+ Less than 3 months with 305.757 ha, accounting for 69,91% of the natural area.


+ From 3 - 5 months with 64.724 ha, accounting for 30,09 % of the natural area.


Especially, flood of the year 2000 was the biggest in decades and the long flooding period caused great damages to production and life of people. The highest water level in Moc Hoa (Long An) was 3,27 meter, 41 cm higher than flood peak in 1978. Flood run strongly to the South, resonating with hurricane tide, causing deep and wide flooding in 300.000 ha of natural area, including 132/188 communes, equivalent to 12/14 districts of province. The average flood was from 1,5 - 2 meters, some regions had deep flood of over 3 meters. Total damages to property were about 650 billion dong.


At present, the province has co-ordinated with flood control programs of the Central level to build sewer and dyke system to control closely and effectively flood, i.e. with small flood, try to keep water, with high flood,  use for washing alum to transform the land. Invest in building 186 residential clusters to ensure the stable and sustainable life in flood season. In construction, should choose the elevation exceeding the flooding level of the year 200
19/08/2014 5:00 CHĐã ban hành/PublishingImages/2014-08/Lu.bmp
Long An province signs a cooperation agreement with Sacramento City – USALong An province signs a cooperation agreement with Sacramento City – USA
With the consent of the Party Central Committee’ Secretariat and implementing the province’s foreign affair program in 2018 that has been approved by the Prime Minister, on May 24th, 2018, comrade Pham Van Ranh – Member of the Party Central Committee, Secretary of the provincial Party Committee, Chairman of the People’s Council and the delegation of Long An province visited and worked in Sacramento City, California State, the United States.

Ngài-Thị-trưởng-Darrel-Steinberg-và-Bí-thư-Tỉnh-ủy-Phạm-Văn-Rạnh2552018tieng anh.jpg

The Mayor, Mr. Darrel Steinberg and the secretary of provincial Party Committee, Pham Van Ranh (right)

In the spirit of sincerity and friendship, on behalf of the Sacramento City Government, the Mayor Darrel Steinberg expressed his pleasure to welcome the delegation of Long An province.

Mr. Pham Van Ranh expressed his gratitude for the warm and respect welcome of the Mayor and his colleagues for the delegation, and generally informed of the location and role of Long An in the key economic zone in the South as well as in the Mekong Delta of Vietnam, highlighted the socio-economic achievements and redundant land for development of the province.

 Buổi lễ ký kết Biên bản ghi nhớ hợp tác giữa hai địa phương Hoa Ky 2552018tieng anh.jpg

The signing ceremony of Memorandum of Understanding between the two localities

At the end of the talks, Mr. Pham Van Ranh and the delegation witnessed the signing ceremony of Memorandum of Understanding between the Mayor of Sacramento City, Mr. Darrel Steinberg with the Vice Chairman of Long An People's Committee, Mr. Nguyen Van Duoc.

Accordingly, the two sides agreed to create all favorable conditions for the development of trade, promoting the investment from Sacramento City in Long An province in the fields of hi-tech agriculture, industry, solar energy; at the same time, making efforts to promote economic cooperation through trade, tourism, human resource training, etc. activities between the two localities.

It can be said that, this is an important event, opening up a new prospect for strengthening cooperation between the government and people of Sacramento City (USA) and Long An province (Vietnam), enriching and diversifying the province's foreign affair activities, contributing to strengthening of the friendly and cooperative relationship on the basic of respect for independence, sovereignty, equality and mutual benefit between the two countries in the new integration and development period.

On this occasion, the delegation conducted the investment promotion and witnessed the signing of investment cooperation between businesses in Long An province and the United States in Los Angeles, San Francisco, San Jose, Oakland Cities on the fields of preservation and processing of agricultural products, hi-tech electronics, solar power and survey of waste treatment technology./.

Reported by Nguyen Ba Luan

  Translated by Lan Vy ​

28/05/2018 3:00 CHĐã ban hành/PublishingImages/2018-11/Buổi lễ ký kết Biên bản ghi nhớ hợp tác giữa hai địa phương Hoa Ky 2552018tieng anh.jpg
PHUOC DONG INDUSTRIAL PARK AND PORT, CAN DUOC, LONG ANPHUOC DONG INDUSTRIAL PARK AND PORT, CAN DUOC, LONG AN
Location: 5 Hamlet, Phuoc Dong commune, Can Duoc District, Long An Province, Viet Nam.

khu-cong-nghiep-phuoc-dong-01.jpg

Contact: www.imgphuocdong.vn ​

Distance to traffic hubs

Roads:

Ho Chi Minh city center 45km

Phu My Hung Urban center 35km

Long An Province center 18km
Ports:

ICD Hiep Phuoc Port 30km

Cat Lai Port 43km

Long An International port 23km

Cai Mep Thi Vai Deep Port 74km
Airport:

Tan Son Nhat Airport (HCMC) 42km

STRENGTHSThere are road transport systems and river transport system
Length of Vam Co River: 3.150 m.
Planned industrial park port in Vietnam's seaport system with 3 clusters of 9 berths deep water ports, ensures 10.000 - 15.000 DWT ships.
Located adjacent to Nation road 50, 35 km to Ho Chi Minh City
Completed residential area serving the demand of officers and staff
Located in an area with abundant labor force and cheap labor.

POSITION

See location map on Google maps

Located at:
- East : Nuoc Man Channel
- West: Existing Residential area
- South : Vam co River
- North : Current residential areas in road 826B
INVESTMENT INCENTIVESFree of 02 years, 50% in the next 04 years. 20% corporate income tax.
Click here for more detail
PERFORMANCE DURATIONPeriod of land leasing: 50 years (up to January 6th, 2059)
LEASING PRICE AND MODE OF PAYMENTPlease contact us for information about pricing
FACTORY LEASE PRICEPlease contact us for information about pricing
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICES
WATER RATES0,28 USD/m3
FEE WASTEWATER TREATMENT0,25 USD/m3
ELECTRICITY PRICEPrice offered by Electricity Company of Vietnam for voltage from 22KV to 110KV
FUNCTIONAL BLOCK- Processing industry
- Light industry
- Chemical industry 
- Construction materials industry, consumer goods industry
- High-tech industry
- Other service.
LAND USE STRUCTUREWorkshop, warehouse,yard,wharf 90.17 ha
Roads system 19.35 ha
Operation and service areas 2.66 ha
Infrastructure system 1.55 ha
Open green 15.15 ha
Residential area 15.1548 ha
SCOPE OF PERMITTED INVESTMENTSThe following business lines will be attracted in Industrial Park: 
• Project on manufacture of electronic, electrical devices 
• Project on manufacture of telecommunication cable and electrical cable
• Project on manufacture of pharmaceutical product and medical devices 
• Project on manufacture of chemical products and cosmetic (excluding basic chemicals) 
• Project on manufacture of PP bag from plastic grain 
• Project on manufacture of paint and basic chemicals
• Project on manufacture of plastic, products from plastic (domestic plastic) 
• Knot wear (without weight reduction) 
• Knot wear (with weight reduction)
• Project on manufacture and processing of garment products (without phases of washing, erasing and dyeing) 
• Project on processing of wood 
• Project on manufacture of laminated wood 
• Project on manufacture of stationary 
• Manufacture of paper carton board from rolling paper 
• Project on manufacture of soft drink 
• Project on manufacture of milk 
• Project on manufacture of food products 
• Project on manufacture of confectionary
• Project on processing of cooking oil 
• Project on processing of tea 
• Mechanical fabrication (lathing, cutting, welding etc) 
• Storage and showroom of products 
• Service and business of packages, technical accessories relating to gas 
• Project of mechanics, fabrication of machine and equipment (with plating and coating in production line, excluding fabrication and manufacture of plating and coating
• Project on manufacture of CO2 gas, with liquefaction extraction and feeding 
• Project for trading of liquefied petroleum gas (LPG)
• Batching plant 
• Manufacture of welding electrodes 
• Consumer goods 
• Project on manufacture of other building materials 
• Project on alimunium and steel rolling from material blank 
• Project on recycling and treatment of solid wastes of all kinds (excluding wastes from outside of Long An Province) 
• Project on manufacture of fertilizer 
• Project on manufacture of plastic grain 
• Making and processing of sport shoes
CLIMATELocated in the tropical region under the influence of sub-equatorial monsoon with high temperature and distinctively dry and rainy season in a year. Average temperature reaches 270C. Annual average humidity is relatively high, around 70% - 80%. West - South wind: from May to November; East - South wind: from December to April
TOPOGRAPHY AND GEOLOGY- Land height: 2,1m
- Compressive strength: 0,061 cm2/kg
- Cohesion strength C: 0,06kg/cm2
- Natural unit weight: 1,91g/cm3
- Compressibility coefficient: 0,187kg/cm2
- Internal friction angle: 3o00'
WASTE WATERFollow current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEMMain road system : 33m in width
Internal road system : 20m in width
ELECTRICITY SUPPLY SYSTEM- On-site 3x63 MVA transformer station.
WATER SUPPLY SYSTEMOn-site water treatment plant, capacity 4.560 m3/ day night
WASTEWATER TREATMENT SYSTEMCapacity 4,200 m3/day night, meet TCVN 5945:2005 level A standards, before being discharge
POST AND TELECOMMUNICATION SYSTEMEstablishing the modern and international standard network of Postal & Telecommunication Service; such as to equip , telephone system and ADSL provided by a Telecommunication Service and meet all demands of investors.
PUBLIC UTILITIES- Park system is planned for the whole in order to provide fresh air, prevent air pollution and create beautiful sights and comfortable working environment for the work force 
- All of tax and custom service, banking service... will be carried out convenient at Industrial Park
SUPPORTING SERVICES
FREE SERVICES- Business establishment registration
- Custom and accounting registration
- Investment certificate
- Factory construction permit
SUPPORTING SERVICE- On-site custom office
- ICD port
- Standard ready-built factories/warehouses
- Petrol/liquid petrol gas supplied
- Catering supplied
- Shuttle bus to major location like Hochiminh City
- Banking, shopping area, schools and training centers, hospital, administration offices…
TYPICAL CLIENTS
CUSTOMER LISTClick here for more detail
DOCUMENTS

Source: Long An Economic Zone Authority (LEAZA)


02/12/2016 7:00 CHĐã ban hành/PublishingImages/2016-12/khu-cong-nghiep-phuoc-dong-01.jpg
LONG HAU - HOA BINH INDUSTRIAL PARK, THU THUA, LONG ANLONG HAU - HOA BINH INDUSTRIAL PARK, THU THUA, LONG AN
Location: Binh Anh T-Junction, National Road 1A, Thu Thua District, Long An Province, Vietnam

kcn-long-hau-hoa-binh-01.jpg

Contact: www.longhau-hoabinh.com.vn
Distance to traffic hubs

TRAFFIC ROAD: 
• To Ho Chi Minh City 22Km (26 min drive)
(Intersection Nguyen Van Linh Boulevard 

National Road 1A)
• To Tan Son Nhat Airport 45Km (69 min drive)
• Tan An City 05Km (10 min drive)
WATER WAY: 
• To Bourbon – Ben Luc Port 05 km (10 min drive)
• To Cat Lai Sea Port /SPCT 47-49 km (1h15' drive)

kcn-long-hau-hoa-binh-04.jpg

STRENGTHS1. Western trading gateway:Long Hau-Hoa Binh IP is located at Binh Anh T-Junction, National Road 1A, Thu Thua District, Long An Province, a strategic location as gateway to Mekong delta region and HCM city where potential market to be considered to develop. With national road 1 A and HCM-Trung Luong highway, together with Bourbon Ben Luc river port (5 km away from IP), investors will find much more conveniences in transportation in Long Hau-Hoa Binh IP
2. Completed infrastructure
3. Competitive land leasing fee. Flexible Payment Method
4. Flexible lease area, a minimum of 4.000m2.
5. Support Services Investor diverse staff of customer care & professional enthusiasm, and many utilities available in the Industrial Park.
6. Abundant labor resources

POSITION

See location map on Google maps

Western trading gateway of Ho Chi Minh city and Mekong delta region, Binh Anh T-Junction, National Road 1A, Thu Thua District, Long An Province, Vietnam
INVESTMENT INCENTIVESFree of 02 years, 50% in the next 04 years. 20% corporate income tax.
Click here for more detail
PERFORMANCE DURATIONUntil 10/9/2058
LEASING PRICE AND MODE OF PAYMENT- Competitive land leasing fee
- land leasing fee apply depending on location and time of each registration.
- Payment method: flexibility, divided into tranches with Competitive interest rates in accordance with the needs and financial capacity of investors
FACTORY LEASE PRICE2.7 USD ~ 3.2 USD/m2/month
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICES0.03 USD/m2/month
WATER RATES0.37 USD/m3
FEE WASTEWATER TREATMENT0.3 USD/m3
ELECTRICITY PRICE
FUNCTIONAL BLOCK
LAND USE STRUCTURE- Land of plants, warehouse:s 86.16 ha
- Land of administration services 1.96 ha
- Land of techniques: 1.58 ha
- Land of transport: 12.39ha
- Land of green: 15.56 ha
SCOPE OF PERMITTED INVESTMENTS- Group projects of electronics , telecommunications
+ Project production of electrical equipment , electronics
+ Project production electronic components , electronic
+ Project telecom cable production
- The project team of mechanics , metallurgy
+ Project engineering , manufacturing machinery and equipment .
+ Project production , assembly and repair of motorcycles
+ Project outsourcing , manufacturing cold rolled , hot rolled , steel pipes , metal stamping cutting staff
- Group projects food processing , beverage
+ Food Processing Project
+ Project beverage production
+ Milk Processing Project
+ Edible Oil Processing Projects
+ Project confectionery production
- Group projects for pharmaceutical , cosmetic
+ Project cosmetic products
+ Project pharmaceutical production
- Group projects stationery
+ Production project stationery
- Group projects apparel
+ Project outsourcing garments without washing stages
- Group projects equipment manufacturing interior
- Industrial production of products for agricultural , mechanical assembly manufacturing , agricultural machinery - motor fishing .
- Industrial production for domestic consumption and export : household appliances , packaging .
- The production of building materials : interior decoration materials , structures and prefabricated houses , pouring roofing tiles .
- Project team warehouses , yards
CLIMATELong An is located in the tropical monsoon, equatorial, high temperatures are in the year, there are two rainy seasons - clear sunny. The average annual temperature is 27.5°C
TOPOGRAPHY AND GEOLOGY- Full geologic drilling.
- The land is leveled with river sand to elevation: +1.8 m above the highs of Hon Dau.
- Compression ratio: ≥ 0.85 K
WASTE WATERFollow current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEMDirectly connected to National Road 1A about 500m
Internal roads with axis loading of 12 tons.
ELECTRICITY SUPPLY SYSTEM- From national electricity network via Tan An Power Station (110 kV/22 kV – 2x25MVA).
- Customers will signing contract to purchase electricity directly from EVN.
WATER SUPPLY SYSTEM- FRESH WATER: Supplied by Thu Thua Water Plant with capacity: 15.000m3/day - Price: 8.150 VND/m3 - Paid monthly
- RECYCLED WATER: Supplied by Wastewater Treatment Plant after treatment,
WASTEWATER TREATMENT SYSTEMTotal capacity: 4,000m3/day (Phase 1: 2,000m3/day)
- Sewer tariff: 6,450 VND/m3 equivalent to 0.30USD/m3 based on 80% of water consumption volume.
- Input: Grade C
- Payment: monthly
POST AND TELECOMMUNICATION SYSTEMTelecommunications underground cable system. - Establish a network of modern telecommunications, complete, capable of synchronous connection to the national telecommunications network and international communications systems, high speed internet connection.
PUBLIC UTILITIES- Job recommendation center
- Customs
- Hospital
- College LADEC
- fire
- Catering
- Housing for workers
services
- Virtual Office Services
- The consulting services:
+ Accounting
+ Human resourse
+ Legal
+ Finance
+ System Management
SUPPORTING SERVICES
FREE SERVICESFREE OF CHARGE FOR PROCEDURES ASSISTANCE
- Business Registration + Tax Code + Seal Registration
- Branch Establishment Registration
- Investment Registration
- Registration of Land Use
- VAT Tax Declaration (for the first 3 months)
SUPPORTING SERVICEGUIDANCE OF LEGAL PROCEDURES DURING INVESTMENT PROCESS
- Construction Permit
- Environment Impact Report
- Fire Fighting Approval
- Import – Export Procedures, Custom Declaration for machinery, raw materials for processing enterprises
- Foreign Labor Registration
- Enterprise Regulation Registration
- Payment of Social Insurance
- Declaration of Personal Income Tax
TYPICAL CLIENTS
CUSTOMER LISTClick here for more detail
DOCUMENTS

​Source: Long An Economic Zone Authority (LEAZA)​


02/12/2016 6:00 CHĐã ban hành/PublishingImages/2016-12/kcn-long-hau-hoa-binh-01.jpg
Geographical locationGeographical location
Long An Province is adjoining to Ho Chi Minh city and Tay Ninh Province to the East, Kingdom of Cambodia to the North, Dong Thap Province to the West and Tien Giang Province to the South.

Long An province is located at the quite special geographical location because although the province is located in the Mekong River Delta Region, the province belongs to Key Economic Development Zone in the South which is defined as the key economic area with specially important role in the economic development strategy of Vietnam. Long An ratios the borders with the Kingdom of Cambodia with the length of 132.977 km and two border gates of Binh Hiep (Moc Hoa) and Tho Mo (Duc Hue). Long An is the gateway connecting the Southeast Region with Mekong River Delta Region, specially the province ratios the borders with Ho Chi Minh city by the road system such as National Highway No. 1A, National Highway No. 50 etc. and provincial roads of DT.823, DT.824, DT.825 etc. The interregional and national waterway has been upgraded, expanded, newly constructed to create the driving force and new opportunities for the development. In addition, Long An province is also provided with the water source from two river systems of Me Kong and Dong Nai. ​Being a province located next to Ho Chi Minh City with the closer and closer economic relation with the South Key Economic Development Zone, especially Ho Chi Minh city which is an important province in the South which accounts for 50% of the industrial output of the whole country and the biggest investment, technology transfer partner and biggest agricultural product consumption market of Mekong River Delta Region.

The natural area of the entire province is 449,194.49 ha, the population is 1,542,606 (according to the population statistics up to May 2013). The geographical coordinates are: 105030' 30'' to 106047' 02'' East Longitude and 10023' 40'' to 11002' 00'' Northern Latitude.

Long An Province has 15 administrative units including districts of Duc Hue, Duc Hoa, Ben Luc, Can Duoc, Can Giuoc, Thu Thua, Tan Tru, Chau Thanh, Thanh Hoa, Tan Thanh, Moc Hoa, Vinh Hung, Tan Hung, Kien Tuong Town and Tan An City; and 192 administrative units of commune level including 166 communes, 12 wards and 14 towns.​

04/03/2015 3:00 CHĐã ban hành/PublishingImages/2018-11/ban_do_hanh_chinh_long_an.jpg
1 - 30Next
LONG AN PORTAL
Line Agency: People's Committee of Long An Province
Standing agency: The National Assembly Delegation, the Provincial People's Council and People's Committee Office​
Direct instruction: Mr. Nguyen Thanh Vung - Chief of Staff of the National Assembly Delegation, the provincial People's Council and People's Committee​​
Address: 61 Nguyen Hue, Ward 1, Tan An City, Long An Province
Phone: (0272). 3552489​
Email: vpubnd@longan.gov.vn; webmaster@longan.gov.vn
License No. 01 / GP-TTDT-STTTT dated March 3, 2015 - Department of Information and Communications