Skip Navigation LinksIntroduction

 
Introduction - Infrastructure
 
The Long An port project is a 1,925 hectare project in Can Giuoc district, Long An, South of Ho Chi Minh City and about 30 km to center of Ho Chi Minh City. Project is divided into four components, comprising a 396 ha industrial park, 236 ha industrial service area, 1,145 ha residential area and a 147 ha seaport with 2.6 km of frontage along Soai Rap river. 
 
Transportation system connects Long An province with HCM city, Mekong delta river and other area is basic good, including roads and waterways 
Water source (27/02)
 
Water source: Long An has Vam Co Dong River and Vam Co Tay River and the interlaced system of canals and ditches connecting with Tien River which is the main water transmission and irrigation line. However, this water source is limited and contaminated with saline and alum, therefore, the water fails to meet the production and domestic demands.  
 
Up to 31/5/2013, there are more than 700 schools in the province, including: There are 46 high schools, 132 secondary schools including 1 specialized school (Long An Specialized School), 5 private schools. There are 249 primary schools with 4,401 classes and 125,089 students in which there are 135 schools open all-day for 59,908 students. There are 187 pre-schools including 131 nursery schools and 56.  
 
Up to 8/2013, there are 20 hospital in the province, in which: - 03 provincial hospitals (Provincial General Hospital (900 patient beds), Traditional Medicine Hospital (110 beds), Tuberculosis and Lung Disease Hospital (70 beds) – 3 Region General Hospitals (Hau Nghia Region General Hospital (250 beds), Dong Thap Muoi Region General Hospital (140 beds), Can Giuoc Region General Hospital (250 beds).  
 
Long An Province Power Development Plan for phase 2011 – 2015 with considerations to 2020 has the following main criteria: I. Power load The power load is calculated to meet the sufficient power demand for socio-economic development of Long An province with the GDP growth rate in Phase 2011 – 2015 of 14.0%/year; GDP growth rate in phase 2016-2020 of 13.3%/year.  
 
The grid supplied to Long An province includes intermediary transformer stations and electricity-generating cluster. 
 
In recent years, post - telecommunication industry has forcefully developed. In 1990, telephone density was only 0,12 machines/100 persons, until the end of 1999, telephone density was 1,96 machines/100 persons with total of 25.631 machines. 
 
Until the end of 2004, roadways in province was 1.698km, in which asphalt roads were 474km, accounting for 27,9%, gravel roads were 1053km (62%), other kinds of roads were 171km (10,1%) (excluding rural roads). 
 
 
  
  
Tóm tắt
Nội dung
  
  
  
Tan Lap floating village to put into operation before Tet holidayTan Lap floating village to put into operation before Tet holiday
Secretary of the Party Committee of Long An province Pham Van Ranh led leaders of Department of Culture, Sports and Tourism, the Tran Thai Group and Thap Muoi Tourism Company to visit and survey Tan Lap floating village- the ecological tourism area in Tan Lap Commune, Moc Hoa District, Long An province on December 6.

Lam-viec-cac-nha-dau-tu lang noi Tan Lap 30122017.jpg

Secretary of the Party Committee of Long An Province has a working session with investors and leaders of relevant departments

Tan Lap floating village located in the heart of Dong Thap Muoi sub-region (also known as the Plain of Reeds) which covers more than 135 hectares of core area and 500 hectares of buffer area. 

The floating village has been known as wetlands with its habitat of indigo forests, lotus, lily, water hyacinth, typical rice of the area; and as the home of many wildlife as birds, stork, fish...

Tan Lap floating village has a special location for tourism exploitation and development being just about 60 kilometers of the northwestward of central Tan An city and about 100 kilometers of the westward of Ho Chi Minh City.

In the past, the Tan Lap floating village was managed by the Department of Culture, Sports and Tourism; after that it was transferred to the Thap Muoi Tourism Company under Tran Thai Group in 2016 for investment and exploitation following the socialization form. 

At present, investors are carrying out construction works, renovating some works including 5 kilometer-long road through the indigo forest, cable car system for visitors, and 32 hotel- rooms on based of renovation of observation tower (including nine floors with 38 meters high). 

Besides, they have also expanded many functional areas as environmental educational center, natural conservation area, wild bird sanctuary, floating houses on piles, park-restaurant area, marina area...

Nhiều-công-ty-lữ-hành-tham-quan,-tìm-hiểu-Khu-du-lịch-Làng-nổi-Tân-Lập30122017.jpg

Many tour operators discover Tan Lap floating village. Photo: Le Duc

The leader of Thap Muoi Tourism Company said that although the Tan Lap floating village does not officially put into operation, it receives around 200 visitors per day, and around 1,000 arrivals per day on weekends.

Secretary Pham Van Ranh said that with the interference location between the Southeast and the Mekong Delta region, bordering with Ho Chi Minh City, located on the national tourism route of Ho Chi Minh City – the Mekong Delta and trans-Asia travel route connecting with Cambodia through the provincial border, Long An has an important strategic position in trade and tourism; in particular, the province has identified Tan Lap floating tourist village as one of the key tourism projects of the province and the region.

During the survey, Secretary of the Party Committee of Long An Province Pham Van Ranh appreciated the efforts and determination of investors in concentrating resources, speeding up the construction adding that the leaders of the province and related departments and agencies will create the most favorable conditions for the Tan Lap floating tourist village to early be completed and officially put into operation before the Lunar New Year of 2018.

Tham quan thực tế các hạng mục đang đầu tư30122017.jpg

On-site visit the investment works

At the same time, Secretary of the Party Committee of Long An Province Pham Van Ranh asked the Department of Culture, Sports and Tourism to continue coordinating with the Tran Thai Group, Thap Muoi Tourism Company and other potential investors to research and form tours connecting from Ho Chi Minh City to the key tourism projects in the province: 

Ecotourism sites of Rach Cat-Can Duoc, Tan Lap floating village, Center of Conservation and Development of Medicine of Dong Thap Muoi, Lang Sen Wetland Reserve, key historical-cultural relic sites of the province which would contribute to the formation of typical tourism products of Long An, meeting rising demand for short-term excursions, typical ecotourism in Dong Thap Muoi …of this potential market from Ho Chi Minh City and the neighboring provinces./.

Source:  http://news.baolongan.vn/

30/12/2017 10:00 SAĐã ban hành/PublishingImages/2018-01/Nhiều-công-ty-lữ-hành-tham-quan,-tìm-hiểu-Khu-du-lịch-Làng-nổi-Tân-Lập30122017.jpg
Duc Hoa DistrictDuc Hoa District
Duc Hoa is one of districts of Long An province with the natural area of 42,775.65 ha, population of 226,693 people according to the census up to 21/5/2013. Duc Hoa district shares the borders with the following administrative units: the North adjoins to Trang Bang District of Tay Ninh province and Cu Chi District, Hoc Mon District in Ho Chi Minh city, the Southeast adjoins to Binh Chanh district-HCMC, the West adjoins to Duc Hue district, the Southwest adjoins to Ben Luc district.

From Duc Hoa, it is very convenient to connect with the towns of Ho Chi Minh City located on National Highway No. 22 and National Highway No. 1 (Cu Chi town, Hoc Mon town, An Lac town) and the towns of the districts adjoining to Duc Hoa district. Provincial Road No. 8 is also the important traffic axis connecting with National Highway No. 22 to create the traffic axis connecting the Southeast Region and Southwest Region.

The entire district is divided into 20 towns and districts in which Hau Nghia Town is the central town and the remaining administrative units include: Duc Hoa Town, Hiep Hoa town, Loc Giang commune, An Ninh dong commune, An Ninh Tay commune, Tan My commune, Hiep Hoa commune, Tan Phu commune, Hoa Khanh Tay commune, Hoa Khanh Dong commune, Hoa Khanh Nam commune, Duc Lap Thuong commune, Duc Lap Ha commune, Duc Hoa Thuong commune, Duc Hoa Dong commune, Duc Hoa Ha commune, My Hanh Bac commune, My Hanh Nam commune, Huu Thanh commune.​

17/03/2015 11:00 SAĐã ban hành
In August 2019, Long An welcomes 120,000 visitorsIn August 2019, Long An welcomes 120,000 visitors
According to the Department of Culture, Sports and Tourism of Long An Province, in August 2019, Long An welcomed about 120,000 arrivals, an increase of 10 percent over the same period. In particular, international visitors were estimated at 1,600 arrivals. Turnover was estimated at VND 55 billion, up 10 percent compared to July 2019.

HappyLand 492019.jpg​​

Recently, Happyland has attracted a lot of tourists

Director of the Department of Culture-Sports and Tourism - Nguyen Anh Dung said: "Long An tourism has had many important changes over the past time; tourist destinations have been invested or called socialization. The number of tourists of the province is increasing; especially, foreign tourists are more than before. This is the result of the implementation of the tourism development program into a key economic sector of the province."

In particular, there are specific tasks and solutions for Long An tourism to become an important economic sector, creating favorable conditions to promote other fields in accordance with the orientation of the province's socio-economic development strategy.

Long An is located in a favorable position - the gateway connecting Ho Chi Minh City and the Mekong Delta provinces. Currently, the investment in the province's transportation system and national transportation networks such as Ho Chi Minh City - Trung Luong expressway and National Highway 1 are also conditions for the development of Long An tourism.

Especially, Long An has ecological landscapes of Dong Thap Muoi, Vam Co river landscape, historical-cultural relics, craft villages, and so on. These are potential factors for tourism development.

From Tan An City, along Vam Co Tay River, tourists can visit attractive destinations such as Tan Lap Floating Village, Lang Sen Wetland. From Ho Chi Minh City, along National Highway 1, they can visit Memorial Area of Lawyer Nguyen Huu Tho, Happyland, Vam Nhut Tao relic and Nguyen Trung Truc Temple, Ong Ban Quy Temple, etc.

In order to attract more tourists, the province is actively developing new tourism products, focusing on developing eco-tourism and forming inter-regional tours with neighboring provinces.

The province is cooperating with HTVC Cable Television to produce and broadcast the program "Check-In Vietnam" with the theme "Long An - Today Destination".

Hopefully, with the attention of the provincial leaders and the participation of businesses in tourism product development, in the coming time, Long An will attract more international as well as domestic tourists to contribute significantly to the socio-economic development of the province./.

Source: http://news.baolongan.vn 

04/09/2019 11:00 SAĐã ban hành/PublishingImages/2019-09/HappyLand 492019.jpg
Promoting and inviting investment in culture - sports – tourism - entertainment infrastructure in HCMC and Mekong River DeltaPromoting and inviting investment in culture - sports – tourism - entertainment infrastructure in HCMC and Mekong River Delta
On September 4, Ho Chi Minh City Department of Tourism coordinated with Ho Chi Minh City Center for Trade and Investment Promotion to hold a Conference to promote and invite investment in culture - sports - tourism - entertainment infrastructure in Ho Chi Minh City and 13 provinces and cities in the Mekong River Delta.

Thu hút du lịch vùng Đồng bằng sông Cửu Long 492019.jpg

The Mekong River Delta promises to be an attractive destination for investors as well as tourists

Representatives of the leaders of provinces, cities, departments, agencies, branches of Ho Chi Minh City and 13 provinces and cities in the Mekong River Delta with more than 200 guests attended the event.

This conference within the framework of the series of events "Tourism Connection Forum of Ho Chi Minh City - Mekong River Delta 2019" was held from September 4 to September 5 by Ho Chi Minh City Department of Tourism and Ho Chi Minh City Center for Trade and Investment Promotion.

According to the Organization Board, there are currently a total of 179 projects calling for investment in the fields of culture - sports - tourism - entertainment of the region. In particular, Ho Chi Minh City has 51 projects, the Cluster of Tourism Development Cooperation in the Eastern of the Mekong River  Delta - the Eastern Cluster of the Mekong River Delta (including 6 provinces of Dong Thap, Long An, Tien Giang, Ben Tre, Vinh Long and Tra Vinh) has 36 projects.

The cluster of Tourism Development Cooperation - the Western Cluster of the Mekong River Delta (including 7 provinces such as Can Tho City and the provinces of An Giang, Kien Giang, Hau Giang, Soc Trang, Bac Lieu and Ca Mau) has 92 projects.

 Hội  nghị xúc tiến mời gọi đầu tư vùng Đồng bằng sông Cửu Long 492019.jpg

Representatives of local leaders answered questions of delegates

Deputy Director of Ho Chi Minh City Center for Trade and Investment Promotion - Nguyen Tuan informed that the invitation of domestic and foreign investors, enterprises explored the potential of projects on investment environment, preferential policies as well as special attention of local leaders to have strategies and plans in investing in the fields of culture - sports - tourism – entertainment infrastructure of Ho Chi Minh City and the Mekong River Delta.

Director of Department of Culture, Sports and Tourism of Dong Thap province - Nguyen Ngoc Thuong shared that the provinces of the Eastern Mekong River Delta (Dong Thap province as the head) with the available potential promising to bring efficiency to investors. Hopefully, new businesses and investors learn as well as units that have come to invest to continue exploiting and promoting investment projects in the fields of culture - sports - tourism - entertainment to develop together.

At the same time, he wishes to receive information to better understand the requirements and aspirations of investors and commit to creating the most favorable conditions for investors to successfully implement the project.

According to the Director of the Department of Culture - Information - Sports and Tourism of Bac Lieu province - Cao Xuan Thu Van, if they continue to be properly invested, tourism of provinces and cities in the Western Mekong River Delta Cluster (Bac Lieu province as a Head) will continue to "take off and reach out". With the motto of hospitality, respect for partners, understanding of partners, effective development cooperation with Ho Chi Minh City and the whole country, localities in the Western Mekong River Delta always welcome and create the best conditions for investors to come to learn and cooperate in the spirit of "mutual benefit".

At the conference, businesses invested in projects related to the fields of culture - sports - tourism - entertainment to share their remarks and assessments about the development potential of Ho Chi Minh City and the Mekong River Delta. It shows our wish to continue cooperation with localities to develop this field, serving the increasing needs of domestic and international tourists, and contributing ideas for localities to create favorable conditions for businesses to invest.

In addition, some opinions and questions of delegates were answered and clarified by loca​l leaders./.

Source: http://news.baolongan.vn/

05/09/2019 8:00 SAĐã ban hành/PublishingImages/2019-09/Thu hút du lịch vùng Đồng bằng sông Cửu Long 492019.jpg
Duc Hue District Duc Hue District
Duc Hue district is located in the North of Long An Province with the natural area of 43,174.93 ha and the population of 68,238 people according to the census up to 21/5/2013. The district is divided into 11 administrative units (10 communes and 1 town) and shares the borders with 4 districts of Long An Province, Tay Ninh province and Cambodia, in particular, the Northeast adjoins to Duc Hoa district, the South and the Southeast adjoin to Thu Thua District and Ben Luc district, the West and Southwest adjoin to Thanh Hoa District, Long An Province and Cambodia.

Duc Hue is located at the northeast edge of Dong Thap Muoi region, adjoining to Southeast Region where is the transition from the Southeast to Mekong River Delta Region. With the above mentioned geographical location, the district receives the freshwater source from Dau Tieng Lake which helps Duc Hue District to promote the advantage in producing the typical agricultural products of Mekong River Delta Region such as: rice, sugarcane, animals (pig, cows, ducks), shrimps, fish and forestry product (melaleuca). In addition, thanks to located nearest to the border gate from Cambodia to Hau Nghia Town to Ho Chi Minh City, the district has the advantage for developing service and trade (import and export activities through the border gate), attracting the investments into the district (farm, service, trade etc.). In the future, when the main traffic axes and border ring roads N1 are completed, Duc Hue shall have the great opportunities to exploit the socio-economic development advantages, especially in service economy to contribute to transit the economy mechanism following modernization and industrialization.

Besides above mentioned advantages, the geographical location also brings about some restrictions to Duc Hue district as follows: because this is the transition location between the Southeast Region and Mekong River Delta Region with the overlapping of Pleitocene and new alluvial as well as the alum coating, therefore, 100% soil is of "having problem" land category. In addition, when Dau Tieng Lake is not yet completed, the entire Duc Hue district is contaminated with saline with the volume of 4g/l for 3-4 months/year and the infrastructure is not yet invested properly, the district is the poorest district of Long An province (with the percentage of poor households of 19.3%). At the same time, with 25km of border line (in 4 communes), the district is the "hot location" of smuggling with the participation of many people which causes the delays in agricultural production because it is easy to earn money than honest work.

The district consist of Dong Thanh Town-the center of the district and 10 communes of My Thanh Dong, My Quy Dong, My Quy Tay, My Thanh Tay, Binh Thanh, My Thanh Bac, Binh Hoa Bac, Binh Hoa Nam, Binh Hoa Hung, My Binh (separated from Binh Hoa Hung commune).​

17/03/2015 11:10 SAĐã ban hành
Industrial Complexes in Long An Province after reviewing up to 2020 and vision to 2030Industrial Complexes in Long An Province after reviewing up to 2020 and vision to 2030
Industrial Complexes in Long An Province after reviewing up to 2020 and vision to 2030

No.Industrial Complex NameLocation (district, commune)Area (ha)
IIndustrial Complexes having the infrastructure invested, production enterprises operated or registered for operation
1Lien Hung Industrial ComplexDuc Hoa district, Duc Hoa Ha commune32.85
2Duc Hoa Plastic Industrial Complex Duc Hoa district, Duc Hoa Ha commune47.66
3Lien Minh Industrial ComplexDuc Hoa district, Duc Hoa Ha commune35.93
4Hoang Gia Industrial ComplexDuc Hoa district, My Hanh Nam commune128
5Duc Thuan Long An Industrial ComplexDuc Hoa district, Mu Hanh Bac commune46.80
6Duc My Industrial ComplexDuc Hoa district, Duc Hoa Dong 48.92
7Long Cang Industrial ComplexCan Duoc district, Long Dinh commune and Long Cang commune303.89
 Five-Star International Industrial ComplexCan Duoc district, Long Dinh commune13
 Loi Loi Industrial ComplexCan Duoc district, Long Dinh commune25
  Anova Group Industrial ComplexCan Duoc district, Long Cang commune20
 Hoang Long Long Cang Industrial ComplexCan Duoc district, Long Cang commune65
 Kien Thanh Industrial ComplexCan Duoc district, Long Cang commune30
8Loi Binh Nhon Industrial ComplexTan An City, Loi Binh Nhon commune88.39
9Hoang Huong Industrial Complex Tan Thanh district, Tan Binh commune14.30
Total 746.74
IIIndustrial complexes with infrastructure under construction
10Sao Vang Industrial Complex Duc Hoa district, Hoa Khanh Dong commune15.30
11Huu Thanh – Lien A Industrial Complex Duc Hoa district, Huu Thanh commune18.21
12Hiep Thanh Industrial Complex Ben Luc district, Luong Binh commune23
13Vissan Food Processing Industrial Complex Ben Luc district, Luong Binh commune22.40
14

 

Nhut Chanh II Industrial Complex

Ben Luc district, Nhut Chanh commune106.70
15Quoc Quang Industrial Complex Ben Luc district, Luong Binh commune19.16
16Phat Hai Industrial Complex  Can Giuoc District, Phuoc Ly commune24
17Caric-Hong Linh Industrial Complex Can Giuoc District, Phuoc Vinh Dong  commune100
18Hai Son Long Thuong Industrial Complex Can Giuoc District, Long Thuong commune54.60
19 Tan Phu Thinh Industrial Complex Can Giuoc District, Truong Binh commune30
20Thien Loc Thanh Industrial Complex Can Duoc district, Long Son commune18.14
21Phuoc Tan Hung Industrial Complex Chau Thanh District, Phuoc Tan Hung commune50
Total481.51
IIIIndustrial Complexes with the investment procedures under processing
22Hai Son Industrial ComplexDuc Hoa district, Duc Hoa Dong commune297
23ATAD Industrial ComplexDuc Hoa district, Duc Hoa Thuong commune41
24Phong Phu Industrial ComplexBen Luc district, Luong Hoa commune75
25Nam Hoa Industrial ComplexCan Giuoc District, Truong Binh  commune280
26Viet Hoa Nong Industrial ComplexThanh Hoa district, Tan Dong commune29
 27TTCN Binh Tay Industrial ComplexCan Duoc district, Long Khe commune36
28Deep-water port Industrial ComplexCan Duoc district, Long Huu Dong commune and Long Huu Tay commune  500, reduced to 150
29Long Cang Industrial Complex (expanded)Can Duoc district, Long Dinh commune and Long Son commune 557, reduced to 100
Total1,008
IVIndustrial Complexes having the withdrawal decision issued by Provincial People's Committee
30Vinh Phong Industrial ComplexCan Duoc district, Long Son Commune 68
31Hoang Huong I Industrial ComplexTan Thanh district, Kien Binh Commune 50
32Dong Tam Industrial ComplexCan Duoc district, Long Dinh commune and Long Cang Commune 300
33Van Phuc Loc Clean Industrial ComplexTan An City, Ward 715
34TTCN Tan Kim Industrial ComplexCan Giuoc District, Tan Kim Commune 17.40
35Tan Dong Industrial ComplexThanh Hoa district, Tan Dong Commune 187
36Nhat Quang Industrial ComplexCan Duoc district, Tan Trach Commune 30
37Thanh Tai Industrial ComplexCan Duoc district, Tan Trach Commune 70
38Gemadept Industrial ComplexTan An City, Nhon Thanh Trung Commune 80
39Hoang Long II Industrial ComplexBen Luc district, Luong Hoa Commune 38
40Hoang Long I Industrial Complex Ben Luc district, Thanh Phu Commune 266
Total1,121.4​
06/03/2015 9:00 SAĐã ban hành/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
PHU AN THANH INDUSTRIAL PARK, BEN LUC, LONG ANPHU AN THANH INDUSTRIAL PARK, BEN LUC, LONG AN
Location: Provincial road 830, An Thanh commune, Ben Luc district, Long An Province

cong khu cong nghiep phu an thanhmoi.jpg

Contact: www.pat-ip.com​

Distance to traffic hubs

Roads:
Phu An Thanh Industrial Park connected with the important roads like:

To the freeway HCM 

Trung Luong: 3 km

To Nation road 1A: 6 km

To center of Ho Chi Minh City: 35 km

Border with Binh Chanh District Ho Chi Minh City

To Tan Son Nhat International Airport: 37 km

River:
  Phu An Thanh Industrial Park adjacent to Vam Co Dong River, very convenient for transportation of goods and raw materials between industrial parks, ports and the Mekong delta river.

To Bourbon river port: 7 km

To Cat Lai port: 30 km

To Hiep Phuoc Port: 35 km

khu-cong-nghiep-phu-an-thanh-03moi.jpg

STRENGTHS1. Strategic location
  Situated on 830 provincial road connected with national highway 1A, to HCM - Trung Luong freeway about 3km, connected to the main roads such as Nguyen Van Linh, Dong Tay Highway connected Ho Chi Minh City and Cat Lai.
2. Internal cargo terminal 
  Located next to the Vam Co Dong River, internal cargo makes it very convenient for transporting, loading and unloading of materials and goods.
3. Allowed risk pollution industries (prone to cause land environment pollution industries)
 Phu An Thanh industrial park allowed risk pollution industries such as textile, electroplating, leather tanning by Long An Provincial People's Committee and the Economic Zone Authority. Phu An Thanh industrial park has separate areas suitable for many level of pollution.
4. Large area of land lease
Phu An Thanh industrial park is available large clean land area able to receive multiple industries production of large investors.
5. Good structural geology 
Phu An Thanh Industrial Park is located on land with good geological structure, soil bearing capacity of large (12 ton / m²), suitable for all manufacturing industries, particularly favorable for the construction of the Heavy machine structure. Construction costs lower than other industrial parks.
6. Flexible Payment method:
 To assist investors, we have a payment method flexible, divided into 2 tranches with the following plan:
 ● Payment of installments, completed within one year.
 ● Payment of installments, completed in 3 years - 5 years.
7. Supports investment license "One Stop Service" is free
 Investors will be supported quickly complete all the procedures for investment licenses, tax identification numbers and seal ... etc, under the mode of "One Stop Service" and does not charge any service fees .
8. Supports investors access to preferential loans
With the good relations with major credit organizes, we will assist investors to access sources of medium and long term loans with preferential interest rates.
9. Preferential Tax Policy
  When investing a new projects in Phu An Thanh industrial park, investors will be exempt from corporate income tax for 02 years when have taxable income and 50% of the tax for the next 04 years.

POSITION

See location map on Google maps

- The West: Provincial road 830
- The East: Go Dung canal
- The North: Rach Vong canal 
- Southern borders: Nuoc Muc canal
INVESTMENT INCENTIVESFree of 02 years, 50% in the next 04 years. 20% corporate income tax.
Click here for more detail
PERFORMANCE DURATIONUntil 9/2057
LEASING PRICE AND MODE OF PAYMENT58 - 65 USD / m2. Land lease price depend on location, land area and negotiable.
Land lease guaranteed technical requirements leveling, complete infrastructure
FACTORY LEASE PRICE3.0 - 3.5 USD/m2
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICESManagement fee : 790 VND/m² (about 0,036 USD/m2/month).
WATER RATES8.980 VND/m³ (about 0,4 USD/m3).
FEE WASTEWATER TREATMENT7.950 VND/m³ (about 0,35 USD/m3).
ELECTRICITY PRICEhttp://ipinvietnam.vn/investment-instructions/power-prices.html
FUNCTIONAL BLOCK1. Division of industrial land for risk pollution industries (industries prone to cause environment pollution) (textile, electroplating, leather tanning)
2. Division of industrial land for other industries.
LAND USE STRUCTUREIndustrial land: 211.7 ha
Land for services and administration: 3.4 ha
Land for technical construction: 3,5 ha
Land for garden and park: 40.9 ha
Land for traffic, port: 32.2 ha
Land for experts residential: 11.6 ha
Reserve land: 3,6 ha
SCOPE OF PERMITTED INVESTMENTS● Group clothing, textile dyeing
● Group mechanics and plating
● Group leather tanning
● Group manufacturing building materials
● Group manufacturing, processing, processing of agricultural, forestry, fishery, food.
● Group manufacturing, food processing and poultry, livestock and veterinary medicines.
● Group food processing, farm produce after harvest.
● Group precision engineering, machinery, equipment, tools, spare parts for agriculture and forestry.
● Group shipbuilding industry machine and equipment parts for freighters and fishing boats.
● Group manufacturing of pharmaceuticals, pharmaceutical raw materials.
● Group of wood processing industry serve domestic consumption and export.
● Group manufacturing instruments and medical equipment, laboratory.
● Group manufacturing textiles, garments, textile, packaging, footwear, products for printing on fabric, paper, packaging, wood.
● Group manufacturing teaching supplies, school supplies, toys, sports instruments, household appliances, production of consumer goods.
● Group food, drinks.
● Group components and electronics - telecommunications, equipment and raw materials, spare parts for the electronics industry and telecommunications.
● Group manufacturing components, household electrical equipments
● Group textile, printing, printing services.
● Group manufacturing tools, sport equipments, household equipments - office supplies, children's toys
● Group manufacturing of textile industry machine.
● Group crafted jewelry, gems, porcelain.
● Group manufacturing plastic packaging, paper and wood.
● Group manufacture materials, washing products, cosmetics, printing inks.
● Group manufacturing automotive parts, motorcycles, manufacturing and assembly of motorcycle components, motor vehicles, manufacturing equipment and motors for the transport sector.
● Group manufacturing materials, composite products, insulation, sound insulation materials, insulation materials, composite materials, heat resistant materials, construction plastic, fiberglass.
● Group manufacturing ceramic products, glass, plywood, paint.
● Group manufacturing interior decoration materials, furniture crafts.
● Group manufacturing new materials, rare materials.
● Group manufacturing building components assembly, roofing, ceramic tiles, steel types ... etc.
CLIMATELong An is located in a tropical monsoon and equatorial area with stable and high temperature background around the year and it has two distinctive rainy and sunny seasons but Duc Hoa dst. is affected by monsoons with more rains. Annual average temperature: 27.7 degrees Celsius
TOPOGRAPHY AND GEOLOGY- Building height: 2,7 m
- Bearing capacity of the foundation soil 12 ton/m2, depth of foundation 12 m
WASTE WATERFollow current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEMRoad: Provincial Road 830, A street right-of-way planning is 70m, this is the transport route connecting Mekong Delta river area to Ho Chi Minh City.
River: Vam Co Dong river system is one of the waterway transport system in Vietnam's Southern Key Economic Zone, planning warehouse and storage area adjacent Vam Co Dong river with berth (terminal) length of 500m.
Logic internal transportation system, main roads width: 84m and internal road network with road width: 49,5m and 42m, road arranged logically to ensure that matching requirement in industrial park service such as fire, ambulance, transportation of goods, movement of each plant, factory safety and utility.
ELECTRICITY SUPPLY SYSTEMMedium voltage system of the national grid (voltage of 22 kV) from Ben Luc 110KV stations (dual circuit), EVN Long An will supply to factories and enterprises.
Lighting systems and traffic lights were installed along roads in industrial park to ensure traffic safety.
WATER SUPPLY SYSTEMClean water supply by Phu An Thanh Industrial Park Industrial Park, we ensure water quality and quantity supply to investors in industrial park. Current capacity: 13.000m3 / day.
Phu An Thanh Industrial Park venture with partners: Kobelco, Dong Tam, Shinsho build water supply capacity: 50,000m3 / day located in Phu An Thanh Industrial Park and supply for Phu An Thanh Industrial Park, Thuan Dao and the neighborhood region.
WASTEWATER TREATMENT SYSTEMWaste water from factories is treated by local wastewater treatment system and matching requirement before collected through the underground piping network and treated in the Sewage Treatment Plant with its capacity 5.000 m3/day and Pharse 2: 10.000 m3/day 
The wastewater shall be treated according to The Vietnam Environmental Standard before its falling into Vam Co Dong River.
POST AND TELECOMMUNICATION SYSTEMThe modern telecommunication network is established according to international standards such as MDF, telephone system and high-speed internet connection supplied by the post-telecommunication provider which is able to meet all the investors' requirements.
PUBLIC UTILITIES- Completed rainwater and wastewater drainage systems 
- The green spaces are scattered throughout the region that can handle effectively air pollutions (noise, dust, fumes ..) and create beautiful and tidy landscape for the industrial zone as well as a comfortable work environment for employees.
SUPPORTING SERVICES
FREE SERVICESConsult, support investors about procedures for investment licenses and realate administrative procedures in the earliest time: Registration of corporation, tax, custom, registration building certificate.
SUPPORTING SERVICE☆ Support before invest:
• Implement policies to attract investment flexibility, matching the demand of customers (on prices, tariffs, on the methods and conditions of payment);
• Investment consult & support procedures simple and quick;
• Consult & support procedures for bank loans.
☆ Support after invest:
• Support construction license, committed environmental, fire safety plans ... etc.
• Support certification procedures for land use rights.
• Support procedures for building owner license.
• Support to take care of workers (construction of accommodation, commercial services, health care, nursery - schools, workers' dormitory area, residential area).
• Introduce suppliers of petroleum, gas
• Introduce suppliers catering industry
• Introduce consulting company, supervision, build warehouse, office.
• Security suppliers.
• Support recruitment.
TYPICAL CLIENTS1. Vina Eco Board Co., Ltd (Sumitomo Group) (Japan)
2. Fukui Co., Ltd (Japan)
3. SCG Concrete Co., Ltd (Thailand)
4. Huu Lien Steel Co., Ltd (Taiwan)
5. A Chau Steel Jointstock Company (Vietnam)
6. Shintung Co., Ltd (Taiwan)
7. Lavifood Jointstock Company (Vietnam)
8. Vietcombank - South Data Center (Vietnam)
CUSTOMER LISTClick here for more detail
DOCUMENTS


Source: Long An Economic Zone Authority (LEAZA)Description: http://ipinvietnam.vn/Upload/Gallery/9/khu-cong-nghiep-phu-an-thanh-02.jpg
02/12/2016 9:00 SAĐã ban hành/PublishingImages/2016-12/cong khu cong nghiep phu an thanhmoi.jpg
DUC HOA III - THAI HOA INDUSTRIAL PARK, DUC HOA, LONG ANDUC HOA III - THAI HOA INDUSTRIAL PARK, DUC HOA, LONG AN
Location: Tan Hoa hamlet, Duc Lap Ha commune, Duc Hoa district, Long An province

kcn Duc Hoa III Thai Hoa.jpg

Contact: www.thaihoa-ip.vn
Distance to traffic hubs

Next to Ho Chi Minh city on road 10, distances from:

Ho Chi Minh city center : 35 km

An Sương Station : 26 km

Tan Son Nhat airport : 32 km

Sai Gon Port : 45 km

STRENGTHS* The policy of exempt, reduce corporate income tax in the first 10 years.
* Advantage of geographic position, providing convenient in transportation and carriage.
* Complete infrastructure, able to build factory right away.
* Vietnam standard's Activated Sludge sewage treatment system with capacity of 2,000m3/day&night.
* A system to prevent flood, waterlogged in industrial zone: equiped 3 pumps with capacity of 10,000m3/hour/machine, ensuring that no water penetration in the zone when there is rain storm, tide.
* Reasonable price and payment method; saving initial investment cost for investors.

POSITION

See location map on Google maps

Located at Tan Hoa hamlet, Duc Lap Ha commune, Duc Hoa district, Long An province; 2.5km away from 832 provincial road. There are two main transport routes to Thai Hoa IZ:
+ Thay Cai road: 20m wide, 11km long, asphalted. This road goes along the channel, across head of Thai Hoa IZ.
+ Duc Hoa 3 road: 36 meters wide, 11 kilometers long, go through the middle of Thai Hoa IZ
INVESTMENT INCENTIVESFree of 02 years, 50% in the next 04 years.
Click here for more detail
PERFORMANCE DURATIONUntil 06/09/2054
LEASING PRICE AND MODE OF PAYMENT51 USD/square meter 
Rental land is guaranteed to meet all leveling standards and have a complete infrastructure. 
- Rental price is applied for different time of land rental registration, which depends on loaction and payment method.
- Payment method: flexible, suitable for investors' demand and financial resources. Especially, factory and land rental package with payment in 10 years.
FACTORY LEASE PRICE2.5 USD/m2
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICESSection A: 1.050 VNĐ m2/ Month, Section B: 630 VNĐ m2/ Month
WATER RATES7.330 VNĐ/ m3
FEE WASTEWATER TREATMENT6.300 VNĐ/m3
ELECTRICITY PRICE
FUNCTIONAL BLOCK
LAND USE STRUCTUREFactory construction land: 70.28 hectare (70.09%)
Administrative construction and service land: 4.19 hectare. Storey: 2-12 floors (4.17%)
Technical area land (sewage treatment station): 1.00 hectare (1.00%)
Verdure land,water surface : 10.17 hectare (10.14%)
traffic land: 14.60 hectare (14.60%)
SCOPE OF PERMITTED INVESTMENTSThai Hoa IZ accepts the following manufacturing industries: 
- Produce building materials (apart from cement, clay brick)
- Manufacture domestic and export comsumer goods.
- Products for serving agriculture, foodstuff for cattle; manufacturing and assembling machinery of agriculture - fishery.
- Produce phamaceutical products and cometics.
- Food and beverage (except alcoholic products)
- Process wood (without soaking).
- Manufacture glass, pottery, porcelain.
- Process farm products.
- Footwear, rubber tyre and tube, which is using up-to-standard rubber (not waste rubber from used tyre and tube).
CLIMATEinfluenced by monsoon climate, lots of rain falls, annual average rainfall is 1,805 mm, average temperature: 27.70C. High level of humidity, illumination, suitable for many kinds of cultivated crops, have only few influence of natural disaster. influenced by 2 main kinds of wind: southwest wind in rainy season, southeast wind in dry season.
TOPOGRAPHY AND GEOLOGY- Constructive height: 1.4 m
- Compression ratio: 0.5 cm2/kg
- Adhesion strength C: 0.18 kg/cm2
- Natural weight: 1.91g/cm3
- Compressive intensity of land: 5 tons/m2
WASTE WATERFollow current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEM* Approximately 2.5km away from provincial road number 8. Two main routes to access to Thai Hoa IZ:
+ Thay Cai road: 20m wide, 11km long, asphalted. This road goes along teh channel, across head of Thai Hoa IZ.
+ Duc Hoa 3 road: 36 meters wide, 11 kilometers long, go through the middle of Thai Hoa IZ
* Industrial zone's internal roads: include 4 main roads (A, B, C, D); length: 2,000m; parallel to artificial channel and with 8 cross-line named from 1 to 8, each line 500 long.
ELECTRICITY SUPPLY SYSTEMSupplied by Duc Hoa Electric Power Company. Duc Hoa Power Station is 110/22 KV with capacity of 2x65MVA; Duc Hoa Power station 2 is 110/22 KV with capacity of 65 MVA, 2km away from Thai Hoa IZ entrance. Electricity cost is calculated according to Government regulations.
WATER SUPPLY SYSTEMFresh water system is supplied by Phu My Vinh Water Supply Plant with capacity of 40.000m3 water per day and night. Water supply network will be covered all over industrial zone so that all investors are able to connect and use. Water cost is calculated according to Gorvernment regulations, with Vietnam quality standard.
WASTEWATER TREATMENT SYSTEMVietnam standard of Activated Sludge sewage treatment system with capacity of 2,000m3/day&night.
POST AND TELECOMMUNICATION SYSTEM* Telephone: 1,000 lines * High speed Fibre Optic Cable with bandwith up to 100 Mbps * Cost is calculated according to Government price
PUBLIC UTILITIES* A system to prevent flood, waterlogged in industrial zone: equiped 3 pumps with capacity of 10,000m3/hour/machine, ensuring that no water penetration in the zone when there is rain storm, tide.
* Verdure system, environment sanitation provides beautiful clean scenery, fresh air which is environmental friendly and pollution free
* Artificial channel creates natural airy scenery for the industrial zone.
SUPPORTING SERVICES
FREE SERVICES* Consulting service related to applying Business Registration Certificate, Investment Certificate, Construction Permit documents, as-built document,etc.
* Support service for importing factory equipments: investors only need to contect us when having teh demand to importing factory equipments, we will give our best support in legal procedure so that investors are able to operate as soon as possible.
* Tax consulting service, bank loans: Investors of Thai Hoa IZ will receive consulting from professionals so as to understand thoroughly all tax policies, incentive standard, low interest rate bank loan in a short time.
SUPPORTING SERVICEVerdure take care service
Supply industrial servings
Bank, shopping area, schools, job center
TYPICAL CLIENTS
CUSTOMER LISTClick here for more detail
DOCUMENTS

Source: Long An Economic Zone Authority (LEAZA)​


02/12/2016 8:00 CHĐã ban hành/PublishingImages/2016-12/kcn Duc Hoa III Thai Hoa.jpg
In February 2019, Long An welcomed more than 450,000 visitorsIn February 2019, Long An welcomed more than 450,000 visitors
Just after the Lunar New Year, the number of visitors to Long An increased many times over the same period in 2018.

Du lich Long An thang 2.jpg

Happyland entertainment area has many activities to attract tourists

According to Long An Department of Culture, Sports and Tourism, in February 2019, tourists to Long An reached more than 450,000 people, increased 9 times over the same period of 2018. Of which, international visitors reached 2,500 turns of people, revenue reached VND 135 billion, increased more than 100% over the same period of 2018.

Vice Director of the Department of Culture, Sports and Tourism – Nguyen Thanh Thanh said that, after the Lunar New Year, tourists manly visited ecological tourism sites, cultural and historical relics of the province, especially the number of visitors to Happyland tourism area soared.

With its position as the Western gateway and the vast area of Dong Thap Muoi, Long An is a relatively new destination for near and far tourists./.

Reported by Minh Dang

​Translated by Lan Vy ​


15/03/2019 5:00 CHĐã ban hành/PublishingImages/2019-03/Du lich Long An thang 2.jpg
People’s CouncilPeople’s Council
Members of People's Council of Long An Province for the term of 2016 - 2021

Chairman of Provincial People's Council - ​Mr Pham Van Ranh.

Vice Chairman of Provincial People's Council – Mr Nguyen Thanh Cang

Vice Chairman of Provincial People's Council – Mr Nguyen Minh Lam

Member of Standing Committee, Office Manager of People's Council – Mrs Dang Thi Ngoc Mai

Head of Legal Department of Provincial People's Council – Mr Le Son Ha

Head of Economic-Budget Department of Provincial People's Council – Mr Nguyen Huu Tuan

Head of Culture-Social Department of Provincial People's Council – Mr Truong Van Nam

People's Council Office of Long An Province

Addresses:  61 Nguyen Hue Street, Ward 1, Tan An City, Long An Province

Phone number (0272). 3553 924

Fax: (0272). 3830 150

Email: dbnd@longan.gov.vn

06/07/2018 9:00 SAĐã ban hành/PublishingImages/2018-07/to-chuc-bo-may.jpg
THUAN DAO INDUSTRIAL PARK, BEN LUC, LONG ANTHUAN DAO INDUSTRIAL PARK, BEN LUC, LONG AN
Location: Ben Luc town, Ben Luc district, Long An province.

khu-cong-nghiep-thuan-dao-05.jpg

Contact: www.thuandao.com
Distance to traffic hubs

1. From the Industrial Park (IP) to

Center of Ho Chi Minh City: 21 km.

Phu My Hung urban area – Dist. 7, HCM City: 18 km (20 mins)

Green City, Tan An City – Long An: 20 km (20 mins)
2. Road:

National Road 1A => the IP: 0.8 km

Highway of HCMC – Trung Luong => the IP: 2 km

Belt Road 4 => the IP: 2 km

Belt Road 3 (Highway Ben Luc 

Long Thanh) => the IP: 5 km
3. Waterway & Port system:

Vam Co river: 200m in width, 12 – 20m in depth

Bourbon and Hoang Tuan ports: away from the IP 500m, vessel of 5,000 DWT, capacity of 550,000 ton/year

Long An International seaport: far from the IP 28 km – vessel of 50,000 – 70,000 DWT; capacity in 2020: 15 million ton/year

Hiep Phưoc seaport 

Tp. HCM: far from the IP 30 km (road) – vessel of 50,000 – 70,000 DWT, capacity of 200 million ton/year

Cat Lai port – Tp. HCM: far from the IP 35 km, capacity of 70 million ton/year
4. Airway: 

Tan Son Nhat Airport – Tp HCM: away from the IP 20 km; capacity: 23 million passengers/year and 600,000 ton of commodities/year

Long Thanh International Ariport – Dong Nai: far from the IP 45 km (Highway of Ben Luc – Long Thanh); capacity of 100 million passengers/year and 5 million ton of commodities/year.

khu-cong-nghiep-thuan-dao-07.jpg

kcn thuan dao8.jpg

STRENGTHS1. Convenient location: Thuan Dao Industrial Park locates at the center of Ben Luc town, Ben Luc district, Long An province.
Long An is considered as a "backyard" of Ho Chi Minh city and is the key and only trading gateway between the two major economic zones of the South and Mekong Delta.
2. Transportation advantages:
Thuan Dao Industrial Park is a hub for the national traffic system (road, airline, waterway and railway) easily and conveniently such as:
- Road: National Road 1A, Belt Road 3, Belt Road 4, Highway from HCMC – Trung Luong – Can Tho, provincial road 16.
- Airline: Tan Son Nhat International airport, Long Thanh International airport
- Waterway: Ben Luc Bourbon port, Long An International port, Hiep Phuoc Port; Cat Lai Port.
3. Term of land use:
Investor is entitled to use land for 50 years and does not have any other annual land payment to the Government.
4. HR- Training:
Thuan Dao is the only IP in Mekong Delta occupies 53% of Long An labor force with 30,000 workers compared to 47,000 workers of the whole province
5. Procedures of "one stop service":
Investors are served with procedures of one stop service quickly and free of charge: investment certificate, tax code, seal, etc.
6. Free consulting service:
Investors are freely provided with the consulting services of environment, design, construction, completion, works ownership, procedures of customs, tax, banking, accounting, bank loan, investment and construction of warehouses, machinery and equipment, etc.

POSITION

See location map on Google maps

- East: adjoining to provincial road 19
- West: adjoining to Long Cang - Long Dinh road
- North: adjoining to Chanh canal
- South: internal road
INVESTMENT INCENTIVESIncentive for corporate income tax : tax exemption for first 02 years and reduction by 50% for the next 04 years (income tax is 17%) Click here for more information
PERFORMANCE DURATIONUntil September 06th, 2061.
LEASING PRICE AND MODE OF PAYMENT75 - 85 USD/m2 (not inclusive of VAT, depending on area and location)

1. Payment Method for land lease:
- Signing MOU: deposit of 10%
- Issueing an Investment Certificate: payment of 30% (Total: 40%) 
- Signing Contract of Land Lease: payment of 30% (Total: 70%)
- Handover of the land: payment of 25% (Total: 95%)
- Issueing Certificate of Land Use Right: payment of the rest.
FACTORY LEASE PRICE3 - 5 USD/m2/month (can be built according to customer's design).
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICESInfrastructure maintaining fee: 0.034 USD/m2.month (not inclusive of VAT)
WATER RATES0.47 USD/m3 (not inclusive of VAT)
FEE WASTEWATER TREATMENT0.34 USD/m3 (not inclusive of VAT)
ELECTRICITY PRICEAccording to the price table of the Government
FUNCTIONAL BLOCK1. Land for lease: 132 ha 
- Land for dyeing and plating industries: 26 ha 
- Land for other industries: 95 ha 
2. Land for warehouse lease: 11 ha
LAND USE STRUCTURETotal: 189.843 ha 
- Land for factory & warehouse: 130.25 ha (Land for dyeing and plating: 26 ha)
- Land for commercial service: 18.58 ha 
- Land for transportation: 19.63 ha 
- Land for green trees: 19.04 ha 
- Land for engineering: 2.34 ha
SCOPE OF PERMITTED INVESTMENTSProjects on dyeing and textile
Projects on mechanical engineering and plating
Projects on production of building materials, exception for fibro cement roofing sheet
Projects on traffic and production of asphalt concrete
Projects on energy and production of power wire and cable
Projects on electronics and telecommunication
Projects on exploration, exploitation and processing of minerals
Projects on waste treatment: building up non-toxic industrial waste treatment and disposal facilities
Projects on timber processing, production of glass and ceramic products
Projects on food processing
Projects on processing of agricultural products
Projects on breeding and animal feed processing of cattle, poultry, fishery, except for the project of construction of fishmeal processing facility
Projects on production of chemical fertilizer, pesticide, except for the project of extracting and packaging pesticide
Projects on chemicals, pharmaceuticals and cosmetics
Projects on production of paper and stationery
Other projects, excepting for leather from fresh leather, rubber processing, rubber latex
CLIMATE- Rainy season: from May to October
- Dry season: From November to April
- Average temperature: 27.2 0C - 27.7 0C
- Annual rainfall: 966 - 1,325 mm
- Average humunity: 80% - 82%
- Annual Average hours of sunshine: 2,500 - 2,800 hours
- Wind: Northeast: frequency of 60 - 70% in dry season; Southwest: frequency of 70% in rainy season.
TOPOGRAPHY AND GEOLOGY- Handover elevation: 1.85m
- Ground compression: 8 - 10 tons/m2
- Depending on location and area, pile ranges from 8 - 15m
WASTE WATERAccording to QCVN 40:2011/BTNMT
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEM1. Internal road:
- Asphalt concrete road designed by Vietnam standard H30, is from 16 – 30 m
2. External road:
- Nguyen Trung Truc street is 30m linking the Industrial Park into the National Road no.1A
- Long Cang – Long Dinh street is 24m linking the Industrial Park into Ben Luc town
- The provincial road no.19 is 24m linking the Industrial Park into Long An International seaport
ELECTRICITY SUPPLY SYSTEM- Ben Luc pawer station, 110/22KV, output 40 + 63MVA
- Rach Chanh – Can Duoc power station, output 40 MVA
WATER SUPPLY SYSTEMThere are four plants supplying water for the IP: 
- Go Den water plant: 7,200 m2/day
- Hoang Long water plant: 10,000 m3/day
- Binh Anh water plant: 15,000 m3/day
WASTEWATER TREATMENT SYSTEM1. Land area: 15,000 m2
- Stage 1: 2,500 m3/day
- Stage 2: 5,000 m3/day
- The pipeline: F 600 – 800
2. Investor treats their wastewater up to B Standard – QCVN 40:2011/BTNMT. The IP continues to treat the wastewater up to A Standard – QCVN 40:2011/BTNMT
3. The IP invests to build a monitoring station to automatically test the wastewater before discharging into Chanh Canal
POST AND TELECOMMUNICATION SYSTEMThe modern telecommunication network is established according to international standards such as MDF, telephone system and high-speed internet connection supplied by the post-telecommunication provider which is able to meet all the investors' requirements.
PUBLIC UTILITIESLand area: 28 ha including: Custom office, Bank, Post office, Hospital, Schools, Commercial & service centers, restaurants, Canteens, Offices for rent, Sport center, Convention center, Kindergarten, Warehouses, Logistics, etc … are set up in the IP and the residential area
SUPPORTING SERVICES
FREE SERVICESMaking applications for all licenses from the beginning to investor's operation.
SUPPORTING SERVICE- Consulting: Design, construction, completion, ownership of structure, customs, tax, accounting, wastewater treatment …
- Assisting: Recruiting and training, lunch meal, telecommunication, electricity, water, houses …
- Supplying building materials: fresh concrete, drain, pile, floor tile, wall tile, roof tile, sanitary wares, UPVC window, liquid paint … with competitive prices
TYPICAL CLIENTS
CUSTOMER LISTClick here for more detail
DOCUMENTS

Source: Long An Economic Zone Authority (LEAZA)​


02/12/2016 10:00 CHĐã ban hành/PublishingImages/2016-12/kcn thuan dao hinh nen.jpg
Chau Thanh DistrictChau Thanh District
Chau Thanh district shares borders with Tan An City, about 12 km away from the city center, 52 km following National Highway No. 1A and 42 km following National Highway No. 50 away from Ho Chi Minh city. The North of the district adjoins to Tan Tru District sharing the borders with Vam Co Tay River; the South adjoins to Cho Gao district and Go Cong Tay District of Tien Giang province; the East adjoins to Can Duoc district with the administrative border of Vam Co river; the West adjoins to Chau Thanh district, Tien Giang province. Chau Thanh district has the total natural area of 15,087.83 ha, and population of 107,840 people according to the census up to 21/5/2013.

Chau Thanh district has the convenient waterway and road system to facilitate the agricultural product consumption and application of science and technology to develop the hi-tech agriculture, processing industry, trade-service and become the clue for purchasing agricultural products. Provincial Road No. 827 and the bypass through National Highway No.50 shall be the main external road of the District connecting the economic zones together. On the other hand, Chau Thanh is located adjoining to Vam Co River, near East Sea with many saline areas, at the downstream, there is fresh water source from Cho Gao canal and Bao Dinh canal, therefore, the fresh water is limited (especially in communes of Thanh Phu Long, Thuan My, Thanh Vinh Dong) and there are many saline alluvial areas.​

17/03/2015 10:00 SAĐã ban hành
DUC HOA III – VIET HOA INDUSTRIAL PARK, DUC HOA, LONG ANDUC HOA III – VIET HOA INDUSTRIAL PARK, DUC HOA, LONG AN
Location: Duc Lap Ha Commune, Duc Hoa District, Long An Province.


khu-cong-nghiep-viet-hoa-03.jpg

Contact: http://www.phumyvinh.com/​

Distance to traffic hubs

Duc Hoa Industrial Park III 

Viet Hoa, Duc Lap Ha Commune, Duc Hoa District, Long An Province. 

Center of HoChiMinh city: 40km 

Tan SonNhat airport: 32km

Sai Gon port: 40km

An Suong bus station: 27km

Tan An town: 50km

Long An international port: 60km

khu-cong-nghiep-viet-hoa-04.JPG​​

STRENGTHS1) Favourable location: Duc Hoa III- Viet Hoa Industrial Park is the focal point position on the map investment from neighboring industrial areas in the area of the lane region of key economic northwestern.
2)Traffic convenience: DH III- Viet Hoa Industrial Park is near to 823 Provincial Highway, distant from Xuyen A road about 5km. With great transportation connection to other province,e.g Bind Duong, Dong Nai, especially HCMC
Completed infrastructure , Full facilities
3) Leasing term: Transferring the land use right for 50 year instead of yearly lease
4)Human resource- training: 
_ DH3 supports investors to recruit human resource 
-Professional manager, technical staff from Long An and HCMC
_Technical memmbers experience from technical vocational college ( VN-JP, Long an vocational college, Long an College)
5) Quick procedure: Investment can accass quick single procedure free of charge : Invesment Cert, Tax Code, Stamp, environmental Protection Commitment
- Attractive investment preferential treatment
6) Pree of charge Consultancy: Supporting for all legal procedures
- Assisting with finance loan sources
- Living and working environment with all facilities

POSITION

See location map on Google maps

_East border adjoins Thai Hoa Industrial Zone
_West border adjoins residential area
_Noth border adjoins Thay Cai channel, Cu Chi Area
_South border adjoins Anh Hong Industrial Zone
INVESTMENT INCENTIVESIncentive tax reduction: 20% Income tax in 10 years, free income tax for the first 2 years and 50% for the next 4 years
PERFORMANCE DURATION50 years (until 09/2055)
LEASING PRICE AND MODE OF PAYMENTPrice:
- Rents: 55 – 60 usd/m2 (including VAT)
FACTORY LEASE PRICE
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICESManagement fee: 0,04 USD/m2/month (assurance,maintenance, security,..)
WATER RATES7000VNĐ/m3
FEE WASTEWATER TREATMENT0,3USD/m3
ELECTRICITY PRICEPeak houR 2.156/Kw/h (9:30 A.M-11:30 A.M, 5 P.M-8 P.M). 
Off-peak hour : 746 VND/Kw/h (22h – 4h)
Normal hours : 1184 VND/Kw/h
FUNCTIONAL BLOCK
LAND USE STRUCTURETotal planned area: 832,150.9 m2
including:
1. Factory Estate: 483,876 m2 = 58.15%
- Factories: 387,876 m2
- Green tree area: 96,775 m2
2. Construction works: 31,630 m2 = 3.8%
- Sewage treatment area and trash transfer station: 9247 m2
- Water work plant: 19,980 m2
- Power-house: 2403 m2
3. Traffic construction: 122,301.9 m2 = 12.77%
4. Offices for administration and services: 106 282 m2 = 14.7%
- The control center of the industrial zone: 22,747 m2
- Villas for professionals: 34,136 m2
- Housing for workers: 25,671 m2
- Public service offices: 23 728 m2
5. Green area, water surface: 88,061 m2 = 10.58%
- Green area: 61,643 m2
- Water surface: 26,418 m2
SCOPE OF PERMITTED INVESTMENTS- Production of paper, wrinkled paper, paperboard labels; manufacturing of electrical equipment, electronic components, electronic; except for the constructions of broadcast stations, and telecommunication lines.
- Manufacturing construction materials of assembled RBS, mechanical processing, rolling, and machine assembly.
- Projects on recycling, solid waste disposal.
- Production of fertilizers, processing seafood, animal and poultry feed.
- Production of beer and malt, wholesale projects such as food, beverages, tobacco, pipe tobacco; and trading, import, export projects of alcoholic beverage products.
- Woodworking projects (no boiling and soaking); production of consumer goods.
- Production of plastic packaging, and food processing.
- Clothing Industry
CLIMATELong An Province is located in the equatorial, tropical area, with high temperatures = the Annual average temperature is 27.50 C; there are 2 opposite seasons in a year: dry and rainy seasons. Annual average humidity is high, around 70 - 800C. Influenced by two major types of wind:
- south west Wind ,ratio 70%, during the rainy season (from April to November)
- southeast Wind during the dry season (from December to April), ratio 60% -70% in dry season
-Rainy season: From May to Oct
-Dry season: From Nov to April next year
-Average humidity: 80%-82%
-Annual sunshine estimated: 2500-2800 hours
TOPOGRAPHY AND GEOLOGY- Building datum: 2,1m
- Compressibility factor: 0,082 cm2/kg
- Bonding power C: 0,2kg/cm2
- Natural density: 1,96g/cm3
- Ground compressive strength: 1.74kg/cm2
WASTE WATERFollowing current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEM- The system consists of 4 main traffic lanes, width 36m
- The transportation system consisting of two lanes, width 16 m, 24 m.
ELECTRICITY SUPPLY SYSTEMNational Grid system - Duc Hoa electricity lines 110kV and 550KV
WATER SUPPLY SYSTEMCapacity: 15,000 m3/day from PMV water supply plant and 80,000 m3/day from implementing HKT plant(almost finished)
WASTEWATER TREATMENT SYSTEMCapacity: 5,000 m3 / day
POST AND TELECOMMUNICATION SYSTEMEstablishing the modern telecommunication network, which meet international criteria, such as MDF facilitites inplementation, high speed telephone network and internet connection from Long An Branch of VNPT installment, which will sastisfy any demands from investors
PUBLIC UTILITIESServices Area,tenament for labor workers and villas for experts
SUPPORTING SERVICES
FREE SERVICES- Registration of establishment of the enterprise
- Procedures for granting investment certificates
- Registration of accounting and customs procedures
- Procedures for registration of building a factory
SUPPORTING SERVICE- Custom Offices
- ICD ports (Inland)
- Standard Warehouses and workshops
- Housing for professionals, workers
- Supply of petroleum, gas 
- Banks, schools, shopping centers, vocational training centers, hospitals, offices …
TYPICAL CLIENTSVinataba/ Sapporo Brewing Co.ltd
CUSTOMER LIST1. Quý Kỳ Corp. JSC 
2. Bình Điền Fertilizer JSC, 
3.Vinataba/ Sapporo Brewing Co.ltd , 
4. Hyman PaperCo.ltd, Thiên Nam elevator JSC, 
5. Nguồn Lực Thời Trang Co.Ltd. 
6. Phú Mỹ Vinh – Long An Supply water JSC, 7. Hành Tinh Xanh Việt Nam Co.Ltd. 
8. Dây Cáp điện Đệ Nhất JSC. 
9. Huỳnh Luông Private Enterprise

​Source: Long An Economic Zone Authority (LEAZA)​


02/12/2016 9:00 CHĐã ban hành/PublishingImages/2016-12/khu-cong-nghiep-viet-hoa-04.JPG
Salt water intrusionSalt water intrusion
Intruding salt water source into Long An is mainly from the East Sea through Soai Rap estuary due to the semidiurnal tide regime.

The East Sea tide in Soai Rap estuary has amplitude of high from 3,5 to 3,9 m. The process of intruding salt water is deeper and longer into the inland. The reason is the strong operation of tide, northeast wind, less water from upstream and especially many exploitations of surface water in dry season. In the past, Vam Co Tay river had been intruded by salt water in Tuyen Nhon of about 5 km, since 1993, it has reached to Vinh Hung. The salinization has started from January to June with 2 - 4 gam/liters. The salinity of Vam Co Dong river has gradually reduced by the influence of Dau Tieng lake.

Besides, the earth tends to be hotter, facilitating sea level raising, developing the salinization deeply to inland.

The salinization has changed the ecological system of region which has been stable for many years, resulting in the influence to production and daily life of people. To reduce this process, should not exploit too much in dry season and the investment in irrigation systems should consider the impact of salt water intrusion on the general ecological system.

19/08/2014 5:00 CHĐã ban hành/PublishingImages/2018-11/Tài nguyên cát Long An.jpg
LONG AN S.E.A INDUSTRIAL PARK, CAN GIUOC, LONG ANLONG AN S.E.A INDUSTRIAL PARK, CAN GIUOC, LONG AN
Location: Tan Tap Ward, Can Giuoc district, Long An province.

​​hinhkcn long an sea.jpg

Contact: www.dongtam.com.vn
Distance to traffic hubs

1. From the Industrial Park (IP) to

Center of Ho Chi Minh City: 30-40 km along to National Road 50.

Phu My Hung urban area – Dist. 7, HCM City: 18 km.

Green City, Tan An City – Long An: 50 km.
2. Road:

National Road 1A => the IP: 41 km

Highway of HCMC – Trung Luong => the IP: 30 km
3. Waterway & Port system:

Soai Rap river: adjacent to IP

Bourbon and Hoang Tuan ports: far from the IP 28km, vessel of 5,000 DWT, capacity of 550,000 ton/year

Long An International seaport: adjacent to IP – vessel of 50,000 – 70,000 DWT; capacity in 2020: 15 million ton/year

Hiep Phưoc seaport 

Tp. HCM: far from the IP 10 km (road) – vessel of 50,000 – 70,000 DWT, capacity of 200 million ton/year
4. Airway: 

Tan Son Nhat Airport – Tp HCM: away from the IP 65 km; capacity: 23 million passengers/year and 600,000 ton of commodities/year

Long Thanh International Ariport – Dong Nai: far from the IP 65 km (Highway of Ben Luc – Long Thanh); capacity of 100 million passengers/year and 5 million ton of commodities/year
5. Railways:

Far from terminal Saigon HCM city 60km.​

STRENGTHS1. Convenient location: Thuan Dao Industrial Park locates at the center of Ben Luc town, Ben Luc district, Long An province.
Long An is considered as a "backyard" of Ho Chi Minh city and is the key and only trading gateway between the two major economic zones of the South and Mekong Delta.
2. Transportation advantages:
Thuan Dao Industrial Park is a hub for the national traffic system (road, airline, waterway and railway) easily and conveniently such as:
- Road: National Road 1A, Belt Road 3, Belt Road 4, Highway from HCMC – Trung Luong – Can Tho, provincial road 16.
- Airline: Tan Son Nhat International airport, Long Thanh International airport
- Waterway: Ben Luc Bourbon port, Long An International port, Hiep Phuoc Port; Cat Lai Port.
3. Term of land use:
Investor is entitled to use land for 50 years and does not have any other annual land payment to the Government.
4. HR- Training:
Thuan Dao is the only IP in Mekong Delta occupies 53% of Long An labor force with 30,000 workers compared to 47,000 workers of the whole province
5. Procedures of "one stop service":
Investors are served with procedures of one stop service quickly and free of charge: investment certificate, tax code, seal, etc.
6. Free consulting service:
Investors are freely provided with the consulting services of environment, design, construction, completion, works ownership, procedures of customs, tax, banking, accounting, bank loan, investment and construction of warehouses, machinery and equipment, etc.

POSITION

See location map on Google maps

- East: adjoining to provincial road 19
- West: adjoining to Long Cang - Long Dinh road
- North: adjoining to Chanh canal
- South: internal road
INVESTMENT INCENTIVESIncentive for corporate income tax : tax exemption for first 02 years and reduction by 50% for the next 04 years (income tax is 22%, and will decrease to 20% in 01/01/2016)
Click here for more information
PERFORMANCE DURATIONUntil June 20th, 2062.
LEASING PRICE AND MODE OF PAYMENT90 USD/m2 (not inclusive of VAT, depending on area and location)

1. Payment Method for land lease:
- Signing MOU: deposit of 10%
- Issueing an Investment Certificate: payment of 30% (Total: 40%) 
- Signing Contract of Land Lease: payment of 30% (Total: 70%)
- Handover of the land: payment of 25% (Total: 95%)
- Issueing Certificate of Land Use Right: payment of the rest.
FACTORY LEASE PRICE4 USD/m2/month (can be built according to customer's design).
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICESInfrastructure maintaining fee: 750 VND/m2.month (not inclusive of VAT)
WATER RATES9,500 VND/m3 (not inclusive of VAT)
FEE WASTEWATER TREATMENT7,500 VND/m3 (not inclusive of VAT)
ELECTRICITY PRICEAccording to the price table of the Government
FUNCTIONAL BLOCK1. Land for industrial construction: 181,04 ha 
2. Land for commercial service: 7.7 ha 
3. Land for warehouse: 29.04 ha
LAND USE STRUCTURETotal area: 396 ha
1. Land for industrial construction: 181,04 ha 
2. Land for warehouse: 11 ha
3. Land for excutive management: 14.5 ha
4. Land for commercial - service: 7.07 ha
5. Land for clue construction: 4.4 ha
6. Land for tranportation: 92.09 ha
7. Land for greenery, river: 59.78 ha
8. Land for reverve : 7.74 ha
SCOPE OF PERMITTED INVESTMENTSMixed industrial planning area (zone A) -The average industrial pollution
- Group of projects on Petrochemical
- Group of projects on mechanics, metallurgy.
- Group of projects on building materials production.
- Group of projects on electric wires and cables, telecommunication cables production
- Group of projects on chemical fertilizers, plant protection production
- Group of projects on chemicals, cosmetics

Clean industrial area (area B) -The less industrial pollution 
- Group of items processed.
- The group of consumer goods.
- The production base projects of pharmaceutical, medicinal and veterinary drugs.
Area high-tech industry (Zone C) -The high-tech industries
- Group of projects on electrical appliances, electronics production.
- Group of projects on electrical components, electronic production.
CLIMATE- Rainy season: from May to October
- Dry season: From November to April
- Average temperature: 27.2 0C - 27.7 0C
- Annual rainfall: 966 - 1,325 mm
- Average humunity: 80% - 82%
- Annual Average hours of sunshine: 2,500 - 2,800 hours
- Wind: Northeast: frequency of 60 - 70% in dry season; Southwest: frequency of 70% in rainy season.
TOPOGRAPHY AND GEOLOGY- Handover elevation: 1.85m
- Ground compression: 8 - 10 tons/m2
- Depending on location and area, pile ranges from 8 - 15m
WASTE WATERAccording to QCVN 40:2011/BTNMT
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEM1. Internal road:
- Asphalt concrete road designed by Vietnam standard H30. Route: 45; 2 x 12 m wide road surface, 5m wide range median, 2 x 8m wide sides technical corridor 
2. External road:
located in the south area designed in the east - west connects with road No. 12, National Highway 50 to provincial road 826, Provincial Road 835 and the National Highway 1A. Route 60m, 2 x 15 m wide road surface, separators in between 10m wide, technical corridor 10m wide on each side.
ELECTRICITY SUPPLY SYSTEM-Transformers, power 110 / 22KV, capacity 40 + 63 MVA
- Transformer station, power 110 / 22KV, 40 + 63 MVA capacity.
WATER SUPPLY SYSTEMCooporation with Bang Tam Company building pipelines for water supply project for 05 communes.
F 250mm main pipe system and F 200 - 150mm branch pipe system . According QCVN 01: 2009: BYT
WASTEWATER TREATMENT SYSTEM1. Land area: 4,4 ha
- Capacity: 6000 m3 / day, Pipelines D 600-800.
2. Investor treats their wastewater up to B Standard – QCVN 40:2011/BTNMT. The IP continues to treat the wastewater up to A Standard – QCVN 40:2011/BTNMT.
POST AND TELECOMMUNICATION SYSTEMThe modern telecommunication network is established according to international standards such as MDF, telephone system and high-speed internet connection supplied by the post-telecommunication provider which is able to meet all the investors' requirements.
PUBLIC UTILITIESLand area: 7.07 ha including: Custom office, Bank, Post office, Hospital, Schools, Commercial & service centers, restaurants, Canteens, Offices for rent, Sport center, Convention center, Kindergarten, Warehouses, Logistics, etc … are set up in the IP and the residential area
SUPPORTING SERVICES
FREE SERVICESMaking applications for all licenses from the beginning to investor's operation.
SUPPORTING SERVICE- Consulting: Design, construction, completion, ownership of structure, customs, tax, accounting, wastewater treatment …
- Assisting: Recruiting and training, lunch meal, telecommunication, electricity, water, houses …
- Supplying building materials: fresh concrete, drain, pile, floor tile, wall tile, roof tile, sanitary wares, UPVC window, liquid paint … with competitive prices
TYPICAL CLIENTS
CUSTOMER LIST
DOCUMENTS

​​Source: Long An Economic Zone Authority (LEAZA)​


02/12/2016 4:00 CHĐã ban hành/PublishingImages/2016-12/hinhkcn long an sea.jpg
Water sourceWater source
Water source:
Long An has Vam Co Dong River and Vam Co Tay River and the interlaced system of canals and ditches connecting with Tien River which is the main water transmission and irrigation line. However, this water source is limited and contaminated with saline and alum, therefore, the water fails to meet the production and domestic demands.

The groundwater deposit in Long An is also not various and the quality is poor, mainly found at the depth of more than 200 meter. The ground water contains many ion to harden the water and reduce the quality of the water. The main water source ​​is the surface water from lakes, rivers. The clean water program funded by UNICEF supports to drill some wells in the areas with water shortage.

 Water supply:

Communication System​ supply system of Long An running through the flow of Vam Co river, Vam Co Dong River and Vam Co Tay River is also contaminated with saline and alum.

Long An is supplied with the clean water from Tan An Water Plant with the capacity of 15,000m3/day for the residential areas in the center of Tan An City and the neighboring areas. Up to now, thanks to the investments from many different capital sources such as State Budget (strategy program, program 135), loans, Unicef capital, OECF capital, all towns in the provinces are supplied with clean tapped water. The percentage of households accessing clean water accounts for 77% with the total number of 1,085,634 people.

In the rural areas, the domestic water supply source is depending on the available water sources with untreated water, therefore, the quality and hygiene of water are not yet ensured. The clean water program funded by UNICEF can only help more than 50% of the population of the province access the clean water.

 Drainage/sewerage:

The majority of the urban areas and residential areas have not yet provided with the complete drainage system. Domestic wastewater and rainwater are directly discharged to the surface water source through the traffic culverts. The province has not yet constructed the drainage and wastewater treatment system separately. The total km of the culverts is only 10.5% of the total length of the roads. The demand for the future investments for the drainage and sewerage systems is very high, especially for Tan An City, towns, small towns and other centers in the province.

 The program to mobilize all resources to construct the traffic, power, water infrastructure system serving for the industrial development has been implemented synchronously by Long An Province at all levels, sectors

 Progress of water supply projects:

 1. The projects listed in the Plan for mobilizing all resources to invest in traffic, water, power infrastructure to serve for the industrial development:

 - Hoa Khanh Tay Water Plant located at Duc Hoa Thuong commune, with the capacity in phase 1 of 40,000 m³/day, in phase 2 of 80,000m³/day, it is planned to commence the construction in early 8/2013.

 - Phu My Vinh 2 Water Supply system, located at Duc Hoa Thuong commune with the capacity in phase 1 of 50,000m³/day, in phase 2 of 200,000m³/day, the investment report is under preparation.

 - Tan Tao Water Plant: the land use criteria are considering because the plant has the construction location moved from Binh Hoa Nam commune, Duc Hue district to Hoa Khanh Tay commune, Duc Hoa district.

 -Kenh Dong Water Supply system: invested by Phu My Vinh Compnay, however, in accordance with the report from the investor, the water supply network of the company shall not take the water from Kenh Dong but use the water from the plant in Duc Hoa III – Viet Hoa Industrial Park and Hoa Khanh Tay Water Plant.

 - Tan Kim Groundwater Plant invested by Holland  Water Supply Co., Ltd. is operating with the exploitation capacity of 1,500 m³/day (in addition to the project in Truogn Binh commune, this company also has the another plant operating with the capacity of 2,000m³/day).

 - Phuoc Vinh Dong Groundwater Plant: calling for investment.

 2. Other projects

 +Bao Dinh Water Plant Project, located at Nhi Thanh commune, the planned capacity of 60,000m³/day, the investment report is under preparation by Long An Water Supply One Member Co., Ltd.

 + Water Supply Project invested by Duc Hoa Water Supply Co., Ltd, taking clean water from Ho Chi Minh City following provincial road 825 to supply water to Tan Do Industrial Park with the estimated capacity in phase 1 of 15,000m³/day, phase 2 of 40,000m³/day, the investment project is under preparation by the investor.​

27/02/2015 11:00 SAĐã ban hành
Electricity supply systemElectricity supply system
The grid supplied to Long An province includes intermediary transformer stations and electricity-generating cluster.

Electricity network :

The grid supplied to Long An province includes intermediary transformer stations and electricity-generating cluster as follows:

- Tan An station: Tan An 1 station: 110/22/15KV(40 MVA); Tan An 2 station: 110/22/15 KV(40MVA)

- Ben Luc station: (65MVA)

- Moc Hoa station: 110/22/15 KV(25 MVA).

- Can Duoc station: ( 16MVA)

- Duc Hoa station: 110/22/15(40MVA)

- Phu Lam station: voltage of 110/15 KV, capacity of 40 MVA supplied to city and a part to Can Giuoc district.

- Cai Lay station: voltage of 66/15 KV, capacity of 10 MVA supplied to Tien Giang province and a part to Moc Hoa, Vinh Hung, Tan Thanh and Thanh Hoa districts.

- Trang Bang Station: voltage of 66/15 KV, capacity of 12,5 MVA supplied to Tay Ninh and a part to Duc Hoa and Duc Hue district.

- Diesel Station: including diesel station in Tan An township with capacity of 565 Kw.

Until the end of 2004, in the whole province, there were 100% of communes (188/188) with the national electricity grids reaching to the center and 92,7% of households with electricity.

Besides, there are many big companies with self investment in separate station such as: Ching Luh Shoes Co., Ltd (with capacity of 25 MVA); Formosa Taffeta Vietnam Co., Ltd (with capacity of 10 MVA); Vina-Chung Shing company (with capacity of 25MVA)

In general, transformer stations of province remain overloaded, preventive sources of diesel only meet a part of demand of electric energy for households using electricity as priority in case of power cut.

Table 1 : Electricity consumption structure of Long An province in the 2002 – 2004 period

ĐVT : %

 

2002

2003

2004

Province

100

100

100

Electricity for Industry– Construction

1,2

51,8

54,9

Electricity for Agriculture – Forestry– Aquaculture

1,2

1,2

1,4

Lighting

45,6

43,5

40,2

Non-industry

2,4

2,5

2,6

Commerce – Tourism

1,1

1

0,9

(Source: Long An Department of Industry)

19/08/2014 5:00 CHĐã ban hành/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
Ecological environmentEcological environment
 Environmental reality:
Natural environment is valuable resource for activities of creature life. Therefore, the appropriate exploitation and natural environment protection will help stable and sustainable social development.

During the course of urbanization, intensive farming. . . the environmental pollution is serious, reducing the quality of environment.

Quality of air: According to assessment of some professional organizations, the concentration of SO2, NO2, CO, lead. . . are low and satisfy the standard as stipulated. Criteria of dust and noise are many times higher than acceptable standard and focus on urban areas, populous areas and main traffic roads.

Quality of water source: on main rivers - channels such as Vam Co Dong, Vam Co Tay, Can Giuoc River . . . Tan An township has the acceptable content of Nitrate, organic substances, concentration of excess drugs, microorganism. . . . as stipulated (TCVN 5937 - 1995). Over the past years, Can Giuoc receives waste water from Ho Chi Minh City with high pollution, impacting on production and daily life of people.

Land: According to result of analysis on sample, concentration of toxic substances such as Cu, Pb, Cd . . . in mud and land is quite low and in acceptable limitation (according to Dutch standard).

Organism: with natural feature including many ecological systems of wetland: brackish water, salt water, fresh water, alum . . . organism resource of province has been assessed as being varied and diversified. During the past few years, as response to human, achievements of exploitation, utilization for production has brought many high results, but the environmental protection has not been considered deeply and synchronously, resulting in the break of the ecological balance between the populations, at the same time reducing or losing many rare and valuable wild animal such as chicken, python, snake, turtle. . . ; vegetations such as flooded cajeput forest, arenga forest, aegiceras forest, mangrove forest. . . and resulting in danger of mice destroying production.


19/08/2014 5:00 CHĐã ban hành/PublishingImages/2018-11/Môi trường sinh thái Long An.jpg
Long An strives to send 1,000 laborers abroad in 2018-2020 periodLong An strives to send 1,000 laborers abroad in 2018-2020 period
On April 11, People's Committee of Long An province held a conference of labor export in the period of 2018-2020 and by 2025.

Phó-Chủ-tịch-UBND-tỉnh-Nguyễn-Văn-Được-chủ-trì-hội-thảo lao đong1142018.jpg

At the conference

Accordingly, in the period of 2018 - 2020, Long An plans to send 1,000 local laborers abroad and 1,000 laborers will be sent abroad annually starting 2021 to 2025.

The move is under a scheme to export labor abroad signed by local authorities, aiming to tackle local unemployment. It is to reduce poverty, provide more job opportunities, contribute to socio-economic development and to allow the unemployed to earn more stable income as well as to develop an awareness of complying with workplace regulations.

In the period of 2011-2017, the province sent more than 600 laborers abroad. However, labor export has so far faced many difficulties resulting that the number of local laborers working abroad has remained still low, said the Deputy Director of Department of Labor, Invalids and Social Affairs - Hoa Thanh Nien./.

Source: http://news.baolongan.vn

18/04/2018 3:00 CHĐã ban hành/PublishingImages/2018-11/Phó-Chủ-tịch-UBND-tỉnh-Nguyễn-Văn-Được-chủ-trì-hội-thảo lao đong1142018.jpg
Communication SystemCommunication System
Until the end of 2004, roadways in province was 1.698km, in which asphalt roads were 474km, accounting for 27,9%, gravel roads were 1053km (62%), other kinds of roads were 171km (10,1%) (excluding rural roads).

​/. Road traffic :

Until the end of 2004, roadways in province was 1.698km, in which asphalt roads were 474km, accounting for 27,9%, gravel roads were 1053km (62%), other kinds of roads were 171km (10,1%) (excluding rural roads). Total length of bridge was 15.799 m long/346 bridges, in which concrete bridges were 7.099 md/123 bridges, girder bridges were 6812 md/194 bridges, others were 1889 md/29 bridges. Density of road by area increased from 0,198 Km/Km2 in 1991 to 0,285 Km/Km2 in 2000 and 0,359 km/Km2 in 2004.

Density of road by population increased from 0,667 Km/1.000 persons in 1991 to 0,957 Km/1000 person in 2000 and 1,130 km/1000 person in 2004.

 

In general, roadways system is prioritized to invest, helping actively to develop production and improve living standard of population. However, there also remain some roads not satisfying the demand of transportation, lacking of synchronism between roads and bridges, not forming uninterrupted branches of roads.

 

Most of the Southern communications network has not been increased, mainly improved, upgraded and expanded, except some rural roads. In Nothern region, the communications network has developed rapidly, contributing to reclaimation, reallocation of population. To date, traffic roads are, however, quite scattered in this region, province road only has some roads just for cars, branches of roads accessible to residential clusters have not been built yet. Therefore this has influenced to travel and organization of life of rural people.

 

At present, the system of bridges and roads have been built synchronously in term of capacity in most of main roads from province to district and roads to industrial zones. However, there still remain some roads with low-capacity bridges, constraining the development of cargo transportation.

 

In recent years, although border belt ways have been invested, they are mainly small-scale rural roads, asynchronous bridge roads, inluencing to the national defense and smuggling fighting.

 

In recent years, the construction of rural transportation has become a big movement, combining from the budget and contribution of population. At present, 156 over 188 communes have car roads to the center (accounting for 83%), 32 communes under 7 districts do not have car roads to center, including 18 roads with total length of 126 km and 140 bridges/6637m long.

 

In recent years, the investment in traffic industry has been constantly increased. However, the annual budget for maintenance is low. Therefore the roads are degrading quickly. According to economists, it is necessary for capital given priority to maintain other than to invest in building. It will bring socio-economic efficiency.

 

In recent years, the roadways system has been considered and invested by the province, but in general it is not extensive and synchronous, influencing to the investment attraction and socio-economic development of province.

 

2/.Waterway traffic:

 

Since 1995, the waterways network has not increased, with scale of 2.559 km. Density of waterways by area was 0,59 Km/Km2 and by population was 1,8 Km/ten thousand of people with main waterways of Vam Co river, Vam Co Dong, Vam Co Tay, Rach Cat river . . .

 

Besides, on rural waterways, especially districts in Dong Thap Muoi, people can travel by boats from house to house, from region to region and boats are the main means of transport, means of living of many families in Dong Thap Muoi. Communes where do not have car roads to center will travel by waterways.

 

However, the waterways network, at present, still depends mainly on natural advantage, not developing the existing potentials, lacking in support system such as marking buoy, local waterways signal. The phenomena of appropriation of flow and way of boats, breach of protective corridors of local waterways such as construction of house and building materials yard, holding a market, etc. have not controlled properly. Many waterways have had great siltation through development in many years but they have not dredged and influenced to travel capacity of means.

 

Long An has great potentials of waterways but they are difficulties and obstacles for building road traffic.


19/08/2014 5:00 CHĐã ban hành/PublishingImages/2014-08/ht-giao-thong.jpg
By 2020: Long An will have 62 industrial clustersBy 2020: Long An will have 62 industrial clusters
The People’s Committee of Long Anh province has issued Decision No. 1315/QD-UBND approving the adjustment and supplementation to the Industrial Cluster Development Planning in the province up to 2020.

cụm công nghiêp Long An đen nam 2020 co 62 cum cong nghiep 1352018.jpg

Traffic system in Long Hau Industrial Park was invested completely. Photo: Thanh My

Accordingly, by 2020, the province will have 62 industrial clusters with a total area of 3,106.5 hectares, allocated to 8 districts and Tan An City. Specifically, Duc Hoa will have 20 industrial clusters with a total area of 994.6 hectares; Ben Luc will have 6 industrial clusters with a total area of 267.1 hectares; Can Giuoc will have 10 industrial clusters with a total area of 487.2 hectares; Can Duoc will have 17 industrial clusters with a total area of 957.1 hectares; Tan An City: 3 industrial clusters with a total area of 164.7 hectares; Duc Hue: 1 industrial cluster with an area of 50 hectares; Thanh Hoa: 1 industrial cluster with an area of 14.3 hectares; Tan Tru: 5 industrial clusters with a total area of 171.5 hectares. It is estimated that the capital demand to build infrastructure for the industrial clusters in the province by 2020 is about VND 27,337.

The development planning of industrial clusters by 2020 is the basis for the provincial People's Committee to consider and decide the establishment of industrial clusters. At the same time, the province continues to promote and attract investment in the infrastructural construction for industrial clusters, relocating enterprises and production facilities that are polluting or threatening to pollute out of the trade villages, residential areas, etc. 

To implement and conduct the plan, the provincial People's Committee identified 7 main solutions: investment capital for infrastructural development; creation of clean land for industrial cluster development; attracting investment in construction, business of industrial cluster infrastructure; development of synchronous infrastructure inside and outside industrial clusters; attracting production investment in industrial cluster; linking to develop industrial clusters; renovation of the state management on industrial clusters./.

Reported by  T.T

  Translated by Lan Vy ​

14/05/2018 3:00 CHĐã ban hành/PublishingImages/2018-11/cụm công nghiêp Long An đen nam 2020 co 62 cum cong nghiep 1352018.jpg
Long An: There are 8 export markets of over USD 100 millionLong An: There are 8 export markets of over USD 100 million
In the province, there are nearly 800 enterprises participating in importing and exporting to more than 120 countries and territories in the world with commodities: Rice, cashew nuts, seafood, dragon fruit, seedless lemon, leather shoes, textile, mechanism, electric-electronic products, battery, machinery, agricultural equipment, plastic, etc.

Chanh,-thanh-long-là-một-trong-những-mặt-hàng-nông-sản-có-giá-trị-xuất-khẩu-cao-của-tỉnh tiếng anh1872018.jpg

Lemon, dragon fruit are two of the agricultural products with high export value of the province 

Accordingly, the exported products are various, the quality of exported products is improved, raising the competitiveness and reaching the market demanding high quality such as EU, US, Japan, and Korea.

In 800 export enterprises, there are 90 enterprises exporting over USD 10 million, focusing on commodities: Rice, seafood, cashew nuts, coffee, bear, shoes, textiles, steel, battery, plastic products, and electronic components. Especially, the province's products have 8 export markets over USD 100 million products of the province (China, Taiwan, Korea, US, Japan, Hong Kong, Cambodia, and Vietnam (in-place export), and 26 export markets over USD 10 million.

In the first 6 months of 2018, the province's export turnover was estimated at USD 2.55 billion, increasing by 20.9%; import turnover was estimated at USD 1.93 billion, increasing by 3.4% over the same period of 2017./.

Reported by Gia Han

Translated by Lan Vy​

19/07/2018 10:00 SAĐã ban hành/PublishingImages/2018-11/Chanh,-thanh-long-là-một-trong-những-mặt-hàng-nông-sản-có-giá-trị-xuất-khẩu-cao-của-tỉnh tiếng anh1872018.jpg
VINH LOC 2 INDUSTRIAL PARK, BEN LUC, LONG ANVINH LOC 2 INDUSTRIAL PARK, BEN LUC, LONG AN
Location: National Highway No. 01, Voi La Village, Long Hiep Commune, Ben Luc District, Long An Province

khu-cong-nghiep-vinh-loc-2-01.jpg

Contact: www.kcnvinhloc2.com.vn​

Distance to traffic hubs

Downtown: 25 km 

Tan Son Nhat Airport: 28km

An Lac Intersection (connected to Dong Tay Avenue): 14 km

Nguyen Van Linh Intersection (connected to National Highway 1A): 10 km

Phu My Hung Urban Zone: 22 km

Sai Gon Port: 27 km

Bourbon Part (Ben Luc): 04 km

khu-cong-nghiep-vinh-loc-2-02.jpg

STRENGTHS* Band reputation: The Company is incorporated by shareholders who are experienced in investment and business in industrial park infrastructures, including Vinh Loc Industrial park Company Limited, who was particularly successful in the Project of Vinh Loc Industrial park in Ho Chi Minh City;

* Regional development potential: Industrial park of Vinh Loc 2 is located in Ben Luc, bordering Binh Chanh District, Ho Chi Minh City, which is considered as the key economic center of Long An province and expanded urban area to the West of Ho Chi Minh City, resulting in higher growth rate than other areas; 

* Strategic location with favorable traffic connections: Industrial park of Vinh Loc 2 has the main gate adjacent to National Highway No. 01, favorable for transportation with respect to both roads (façade of National Highway No. 01, 3 km from Sai Gon-Trung Luong highway and 20 km from Ho Chi Minh downtown…) and waterways (27 km from Sai Gon port and 4km from Bourbon port);
* Infrastructure: modern and synchronic planning, every land lot borders at least 2 roads: 1 main road (width of 30-47 m) and 1 secondary road (width of 8-16 m), facilitating transportation of high-load vehicles, exits and construction of infrastructures of enterprises.
* Natural advantages thanks to soil structures: Industrial park of Vinh Loc 2 is located far away from rivers, resulting in relatively hard geological characteristics, reducing construction costs, ensuring works' durability and lowering annual maintenance costs;
* Price and payment method: adapted to every investor's condition;
* Ability to attract manpower, living conditions and social welfares in the park: Industrial park of Vinh Loc 2 is located in township with dense population and abundant workers with high skills, effectively meeting the demand for manpower of enterprises;
* Policies to attract investment and competitive advantage of locality: Long An has policies to make favorable conditions to investors by establishing friendly environment, adopting one-stop policy for quick and favorable investment procedures; 
High density of plants and workshops (70%); the maximum height of plants is 5 floors, stocks 4 floors.

POSITION

See location map on Google maps

Located at Km 1929 – 1930, National Highway No. 01, Voi La Village, Long Hiep Commune, Ben Luc District, Long An, bordering Binh Chanh District, Ho Chi Minh City, directly connected to National Highway 1A in the front side, adjacent to Ho Chi Minh-Can Tho Highway in the back side, bordering Bourbon port (load of 5,000 tons).
INVESTMENT INCENTIVESFree of 02 years, 50% in the next 04 years. 20% corporate income tax.
Click here for more detail
PERFORMANCE DURATION50 years (2011-2061)
LEASING PRICE AND MODE OF PAYMENTRental rate: adjusted from time to time, depending on location and payment method.
Payment method: flexible, adaptable to investor's demand and financial capability
FACTORY LEASE PRICE
INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICES0.4 USD/m2/năm
WATER RATESApplying the prices of Long An Water Supply Company
FEE WASTEWATER TREATMENTSewage treatment fee: 0.3 USD / m3 (type B, coefficient k = 1)
ELECTRICITY PRICEAccording to the price table of the Government
FUNCTIONAL BLOCKLand for factory: 148,28 ha
Administrative and service area: 3,09 ha
Technical works: 2,93 ha
Transport roads: 40,09 ha
Green trees: 31,97 ha
LAND USE STRUCTURE
SCOPE OF PERMITTED INVESTMENTSAgricultural, forestry, fishery processing industries; foods and foodstuffs (excluding seasoning powder); foods for livestock, poultry and seafoods; beverages (excluding alcoholic drinks).
Fertilizers, pesticides; pharmaceutica products and medicines; cosmetics; paints; bio-fuels, coal; plastic (construction, industrial and household plastic); rubber tires and products made from rubbers; plastics and products therefrom.
Construction material production, interior decoration, components for fabricated house, roofings, coverings; wood processing and products therefrom (not impregnated), ply wood, household woodworks, handicraft products; ceramics, glass, crystal, tiles, lights; sound and electricity insulated materials, composite.
Manufacture and assembly of machineries and equipment, electric parts and accessories (machinery, industrial and household electricity), electronics, informatics, information and technology (IT), telecommunication; electrical materials, telecom cables, IT products.
Mechanical industry, manufacture of machineries, equipment and parts serving agriculture, forestry, fishery industry and transportation; manufacture and assembly of bicycles, motorbikes, cars and other transport means and replacements; pattern processing, metal rolling; manufacture of metal products and alloys; medical equipment and tools, laboratories, labor protection, fire fighting and prevention.
Production of consumption and household goods: textile, embroidering, knitting, garments; luggages, handbags; footwears; packages; prepress, printing; paper and products therefrom (excluding pulp); stationeries; equipment and tools for offices and schools; sports equipment; toys; crafted jeweleries and specious stones.
Other: trade-services (banking, post, telecommunication, logistics), workshops, warehouses and other industries which cause less environmental pollution.
CLIMATETropical monsoon climate with two distinct seasons: 
Rainy season: May-November
Dry season: December-April
-Average moisture in dry season: 77%
-Average moisture in rainy season: 83%
-Highest moiture in September: 84%
TOPOGRAPHY AND GEOLOGY- Land height: 2,1 m
- Compressive strength: 0,082 cm2/kg
- Cohesion strength C: 0,18 kg/cm2
- Natural unit weight: 1,96 g/cm3
- Compressibility coefficient: 1,74 kg/cm2
WASTE WATERFollow current Vietnam's standards
FIRE PREVENTION AND PROTECTIONFire protection system complies with the current regulations of the government
INFRASTRUCTURE
TRAFFIC SYSTEM• Main internal road: width of 30 - 47 meters.
• Secondary internal road: width of 8 - 20m.
The main routes to the land area are Road VL1 (directly connected to National Highway No. 1A) and VL2, VL3, VL4 which have been levelled and asphalt covered (the widths of main roads and secondary roads are 30-47m and 8-16m, respectively; sidewalks with green trees) up to the rented land area, ensuring the smooth transport of construction materials an goods.
ELECTRICITY SUPPLY SYSTEM* Phase 1: electricity is supplied by the National Grid through Go Den electricity Station (110/22KV), serving for all electricity use purposes of enterprises including: production, business, living and lighting...
* Phase 2: electricity is supplied by internal electricity station of the industrial park (110/22kV), meeting the demand for electricity of all enterprises operating in the industrial park including public light and electricity for resettlement and boarding areas.
WATER SUPPLY SYSTEMPhase 1: capacity of 5,000 – 7,000 m3/day and night, supplied by Go Den Water Plant
Phase 2: capacity of 7,000 – 12,000 m3/day and night, supplied by both water treatment and exploitation station of industrial park of Vinh Loc 2 and Go Den Water Plant with water running though pipelines of the industrial park to rented land area, ensuring sufficient supply of quality water for enterprises.
WASTEWATER TREATMENT SYSTEMCentralized wastewater treatment plant of industrial park of Vinh Loc 2 is put into use with capacity in phase 1: 2,000 m3/day and night, in accordance with national standard on industrial wastewater QCVN24:2009/BTNMT
POST AND TELECOMMUNICATION SYSTEMEstablish modern and complete posts and telecommunications network, synchronically connecting to national and international telecommunications networks, information and communication system with high-speed internet connection.
PUBLIC UTILITIES- Banking system: support and supply corporate financial services and transactions by residential community.
- Local general hospitals: health care for workers and first aid 24/7
- Vocational and labor promotion colleges: provide training courses to improve qualifications of workers, support enterprises in seeking and selecting skilled workers.
- Sports centers: meet the demands for physical exercises of workers and staff and organize friendly matches among enterprises.
- Customer conference centers: equipped with sufficient amenities for events and customer conferences.
- Boarding area for workers-resettlement area: meet the demand for settlement of all workers and staff working in the industrial park so that workers can live with ease and enterprises can stabilize their manelectricity as well as their development. This is both strength and highlight of Industrial park of Vinh Loc 2, completely overcoming the current drawback of most industrial parks in Ho Chi Minh City where manelectricity is unstable.
- Supermarket and commercial center: supply workers with consumption goods.
- Kindergarten and school: childcare and teaching for children of workers and staff working in the industrial park.
- Security-Firefighting: Develop professional and experienced security guards and firefighters with sufficient modern equipment and ready all the time to ensure both spiritual and material lives for enterprises in the industrial park.
- Green tree-environment hygiene services: ensure beauty and hygiene, care for the landscape surrounding working area of enterprises.
SUPPORTING SERVICES
FREE SERVICESPre-investment support:
• Free support in procedures of investment application at Long An Economic Zone Authority (LAEZA);
• Adopting investment policies which are flexible and adapted to customer's demands;
• Investment consultancy and support in completing procedures simply and quickly;
• Consultancy and support in completing procedures for bank loans.
Post-investment support:
• Construction and design consultancy & free support in procedures to apply for construction license, commitment-assessment of environmental impacts, methods of fire fighting and prevention...
• Support in completing procedures for land use right certificate (Red document).
• Support in completing procedures for Work ownership certificate (Pink document).
• Utility services supply;
• Customer care & annual activities for community;
• Enhancing worker's living standards (boarding house, commercial and medical services, kindergarten-school, connected residential cluster development)
SUPPORTING SERVICE- Petrol and oil supply
- Industrial catering supply
- Banks, shopping areas, schools, job centers
TYPICAL CLIENTS
CUSTOMER LISTClick here for more detail
DOCUMENTS

​​​Source: Long An Economic Zone Authority (LEAZA)​


02/12/2016 5:00 CHĐã ban hành/PublishingImages/2016-12/khu-cong-nghiep-vinh-loc-2-01 hinh nen.jpg
Departments, Committee and Branches Departments, Committee and Branches
Departments, Committee and Branches

1. LONG AN ECONOMIC ZONE AUTHORITY

Mr. Truong Van Trieu - Director of Long An Economic Zone Authority

Addresses: No. 6​5B Chau Van Giac, Ward 2, Tan An City, Long An Province

Phone number : (0272) 3825445

Fax: (0272) 3825442

Email: bqlkkt@longan.gov.vn

Website: https://bqlkkt.longan.gov.vn/Eng/Pages/default.aspx

Function: Long An Economic Zone Authorit was established on the basis of reorganization of the Management Board of Industrial Parks in Long An province, is directly under the People's Committee of Long An Province; directly performing state management functions for industrial zones, economic zones and border economic zones in Long An province; managing and implementing service-providing functions of public administration and other support services related to investment activities and production business for investors in industrial zones and economic zones, border economic zones in Long An province in accordance with the law

Long An Economic Zone Authority was decided to establish by the Prime Minister, international transaction name is "Long An Economic Zone Authority"; abbreviation is "LAEZA"; subject to the direction and management of the organization, staffing, program work plans and operational expenditure of Long An province; under the direction, guidance and inspection expertise of the operations, administration, industry or sector concerned; shall coordinate closely with the professional bodies of the PPC in the management of industrial zones, economic zones and border economic zones.

2. LONG AN DEPARTMENT OF INDUSTRY AND TRADE 
Mr. Le Minh Duc - Director of Department of Industry and Trade

Address: 112, Cach Mang Thang Tam Street, Ward 1, Tân An City, Long An Province 
Phone number : (0272) 3826 336  

Fax: (0272) 3826 956  

Email: sct@longan.gov.vn

Website: https://sct.longan.gov.vn/Eng/Pages/default.aspx

Function:  Long An Department of Industry and Trade is the specialized organization under Provincial People's Committee and is responsible for providing advices and supporting the Provincial People's Committee to perform the state management functions in industry and trade, including: mechanical, metallurgy, electricity, new energy, renewable energy, chemical, mine and mineral exploitation industry, consumer goods industry, food industry, other processing industries, good circulation in the province, import, export, border trade, market management, competitiveness management, trade promotion, monopoly control, anti-dumping, anti-subsidy, consumer right protection, e-trade; commercial services, economic integration, management of industrial parks and complexes in the province, industry encouragement activities, industrial services under the state management authority of the Department.

3. LONG AN DEPARTMENT OF EDUCATION AND TRAINING

Mr. Nguyen Thanh Tiep - Director of Department of Education and Training
Addresses: 411, National Highway No. 01, Ward 4, Tan An City, Long An Province

Phone number : (0272) 3826394

Fax:(0272) 3832144

Email: sgd@longan.gov.vn

Function:  Long An Department of Education and Training is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee to perform the function of State management of education and training.

4. LONG AN DEPARTMENT OF TRANSPORT

Mr. Nguyen Van Hoc - Director of  Department of  Transport

Addresses: 66 Hung Vuong Street, Ward 2, Tan An City, Long An Province

Phone number : (0272) 3526465

Fax: (0272) 3824725

Email: sgtvt @longan.gov.vn

Function: Long An Department of Transport is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committees in performing the function of State management over transport including: Planning and implementing plans to build the road and river transportation network in the area; Drafting and submitting Provincial People's Committees to promulgate mechanisms, policies, legal documents and sectoral management in their respective localities according to regulations; To organize the implementation of legal documents, plannings, plans, programs, schemes, projects, standards, technical regulations and economic-technical norms in the field of communications and transport. is issued or approved by a competent state agency.

5. LONG AN DEPARTMENT OF PLANNING AND INVESTMENT

Mr. Nguyen Van Tieu - Director of Department of Planning and Investment

Addresses: 61 Truong Dinh Street, Ward 1, Tan An City, Long An Province 
Phone number : (0272) 3837 127

Fax: (0272) 3825 044  

Email: skhdt @longan. gov.vn 

Function: Long An Department of Planning and Investment is the specialized agency of the People's Committee of the province that has the function of advising and assisting the People's Committee of the province to perform the function of State management and investment plans including: synthesis of planning, socio-economic development plans; implementation and proposals on mechanisms and policies of socio-economic management of the province; domestic investment, foreign investment in the locality; management of official development assistance (ODA), non-governmental aid; Bidding; business registration within the locality; synthesis and unified management of business issues, collective economy, private economy; organizations providing public services under the jurisdiction of the department in accordance with the regulations of the law.​​​

6. LONG AN DEPARTMENT OF SCIENCE AND TECHNOLOGY​

Mr.  Le Quoc Dung - Director of the Department of Science and Technology

Addresses: 365, National Highway No. 01, Ward 4, Tan An City, Long An Province

Phone number : (0272).3826249

Fax: (0272).3822093  

Email:skhcn@longan.gov.vn

Website: https://skhcn.longan.gov.vn/Eng/Pages/default.aspx

Function:  Long An Department of Science and Technology is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committees in State management related to science and technology, including science and technology, development of scientific and technological potential; standard, measurement, quality; intellectual property; application of radiation and radioactive isotopes; radiation and nuclear safety; public services in the area of the Department under the management of the province in accordance with the provisions of law.

7. LONG AN DEPARTMENT OF LABOUR, WAR INVALIDS AND SOCIAL AFFAIRS

Mr. Vo Thanh Tri - Deputy Director in charge of ​ Department​ ​​​of Labor, War Invalids and Social Affairs

Addresses: 76 Nguyen Hue Street, Ward 1, Tan An City, Long An Province

Phone number (0272) 382 6214  

Fax: (0272) 3827 149  

Email: sld@longan.gov.vn

Function: Long An Department of Labor, War Invalids and Social Affairs is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in performing the State management function in the fields, including job; vocational training; labor; salary; social insurance (compulsory social insurance, voluntary social insurance, unemployment insurance); labor safety; people with merit; social protection; child protection and care; gender equality; prevent and fight against social evils (referred to labor, people with merit and social affairs); public services under the management of the Department and perform some other tasks and function as assigned and authorized by the Provincial People's Committee and the provisions of law.

8. LONG AN DEPPARTMENT OF HOME AFFAIRS

Mr. Nguyen Van Bon -  Director of Department of Home Affairs

Addresses: 19 A Tran Hung Dao Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3.826.353  

Fax: (0272) 3.834.028

Email: snv @longan.gov.vn

 Function: Department of Home Affairs is the specialized agency of the provincial People's Committee of  Long An has the function of advising and assisting Provincial People's Committee performs the function of state management of internal affairs, including : organizational structure, staffing and administrative agencies, career state administrative reform, local government, administrative boundaries; officials ,civil servants, state employees, officers and servants of communes, wards and townships organizing, NGOs government; clerical state archives religious; emulate - rewarded. 

9. LONG AN DEPARTMENT OF AGRICULTURE AND RURAL DEVELOPMENT

Mr. Le Van Hoang - Director of Department of Agriculture and Rural Development

Addresses: 8T, National Highway No. 01, Ward 5, Tan An City, Long An Province

Phone number : : (0272) 3.826410  

Fax: (0272) 3.822967  

Email: snn @longan.gov.vn

Function: Long An Department of Agriculture and Rural is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committees in performing the function of State management in terms of agriculture; forestry; seafood; irrigation and rural development; flood prevention; the safety of agricultural, forestry, fishery; public services related to the agriculture and rural development sector and performing some tasks and powers under the authorization of the Provincial People's Committee and in accordance with the law.

10. LONG AN DEPARTMENT OF FOREIGN AFFAIRS

Mr. Do Thanh Son - Director of Department of Foreign Affairs

Addresses: 61 Nguyen Hue Street, Ward 1, Tan An City, Long An Province

Phone number : (0272).3553070

Fax: (0272).3553475

Email: sngv@longan.gov.vn

Function: Long An Department of Foreign Affairs is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in state management of external affairs and national border affairs of the locality; public services under the jurisdiction of the Department in accordance with the provisions of law.


 11. LONG AN DEPARTMENT OF FINANCE

Mr. Huynh Van Son - Deputy Director in charge of the Department of Finance

Addresses: 57 Truong Dinh Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3824 362

Fax: (0272) 3823 987  

Email: stc@longan.gov.vn

Function: Long An Department of Finance is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in performing the function of State management over finance; State budget; taxes, charges, fees and other revenues of the State budget; State property; State financial funds; financial investment; business finance; accountant; independent auditing; price and financial services activities in the locality in accordance with the law.

Mr. Phan Nhan Duy - Director of Department of Natural Resources and Environment

Addresses: 137, National Highway No. 01, Ward 4, Tan An City, Long An Province

Phone number :  (0272) 3826 260  

Fax: (0272) 3823 264  

Email: stnmt@longan.gov.vn

Website: https://stnmt.longan.gov.vn/eng/Pages/default.aspx

Function: Long An Department of Natural Resources and Environment of Long An Province is the specialized organization in charge of supporting Long An Province People's Committee to perform the state management functions on land resources, water resources, mineral resources, geology, environment, meteorology, measurement and mapping; performing the public services in the sectors under the management authority of the Department.

13. LONG AN DEPARTMENT OF JUSTICE

Mr. Tran Minh Man - Director of Department of Justice

Addresses: 151 Nguyen Dinh Chieu Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3829522

Email: phongpbgdpl @longan.gov.vn

Function:  Long An Department of Justice is a specialized agency under the Provincial People's Committees, advising and assisting the Provincial People's Committees in performing the function of State management related to elaborating and monitoring the implementation of legal documents; inspecting and handling legal documents; controlling of administrative procedures; propagating and educating law; authenticating; adoption involving foreign elements; commercial arbitration; civil; nationality; judicial records; lawyer; legal advice; legal aid; judicial expertise; conciliation at grassroots level; auction of assets; the responsibility of the State in compensation; register security transactions; managing the implementation of the law on handling of administrative violations and other judicial work according to the provisions of law.

Mr. Nguyen Van Hung - Director of Department of Construction

Addresses:  19 Tran Hung Dao Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3826 169  

Fax: (0272) 3824 746  

Emailsxd@longan.gov.vn

Website: https://sxd.longan.gov.vn/Eng/Pages/Default.aspx

Function: Long An Department of Construction is a specialized agency of the provincial People's Committee, which functions to advise the PPC performing the function of state management in the field of construction; architecture, planning and construction; urban infrastructure, industrial parks, export processing zones, economic zones, hi-tech parks (including transport infrastructure in urban water supply and drainage, waste water treatment, lighting, green parks, cemeteries, urban solid waste, industrial parks, export processing zones, economic zones, high-tech zones); urban development; housing and offices; real estate business; building materials; public services in the field of state management of the facility; perform a number of tasks and powers as assigned, authorized by the PPC and the provisions of law.

15. LONG AN DEPARTMENT OF HEALTH

Mr. Huynh Minh Phuc - Deputy Director in charge of the Department of Health

Addresses: 70 Nguyen Dinh Chieu Street, Ward 1, Tan An City, Long An Province

Phone number : 0272. 3826407 - 0272.3829050  

Fax: 0272.3824161 - 0272.3829050

Email: syt@longan.gov.vn

Function: Long An Department of Health is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in performing the function of State management over the care for people's health, including: preventive medicine, medical examination and treatment, functional rehabilitation, traditional medicine, preventive medicine for people, cosmetics affecting human health, food safety and hygiene, medical equipment; public services in the health sector; performing a number of tasks and powers under the authorization of the Provincial People's Committee and the provisions of law.

16. LONG AN PROVINCE INSPECTORATE

Mr. Phan Huu Hanh - Provincial Chief Inspector

Addresses: 51A Nguyen Hue Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3824 958  

Fax: (0272) 3824 958

Email: ttra@longan.gov.vn

Function: The Province Inspectorate is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in performing the State management function of the inspection and settlement of complaints and denunciations, anti-corruption within the scope of State management of the Provincial People's Committee.

17. OFFICE OF PEOPLE'COMMITTEE OF LONG AN PROVINCE

Mr. Mai Van Nhieu - Office Manager of Provincial People's Committee

Addresses: 61 Nguyen Hue Street, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3826101

Fax: (0272) 3821858

Email: vpubnd@longan.gov.vn

Function:  The Office of the People's Committee of Long An Province is an agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committee in organizing the common activities of the People's Committee; To advise and assist the Chairman of the People's Committee and the Vice Chairman of the People's Committees in directing and administering the general activities of the administrative apparatus in their respective localities; To ensure the provision of information for the direction and administration of the People's Committees and presidents of the People's Committees and information to the public according to the provisions of law; To ensure the technical and material conditions for the operation of the People's Committees and the Chairman of the People's Committees.

18. LONG AN DEPARTMENT OF INFORMATION AND COMMUNICATIONS

Mr. Nguyen Ba Luan - Director of Department of Information and Communications

Addresses: 38 Thu Khoa Huan Street, Ward 1, Tan An Ciy, Long An Province

Phone number : (0272). 3523 345

Fax: (0272). 3523 567   

Emailstt@longan.gov.vn

Function: Long An Department of Information and Communications is a specialized agency under the Provincial People's Committee, which is responsible for advising and assisting the Provincial People's Committee in the state management of the press; publish; Postal; telecommunication; radio frequency; Information Technology; electronic; radio and television; external information; news bulletins; background information; communication infrastructure; Advertising in the press, in the network environment, on publications and integrated advertisement on postal, telecommunications and information technology products and services.


19. LONG AN DEPARTMENT OF CULTURE, SPORTS AND TOURISM

Mr. Nguyen Anh Dung - Director of Department of Culture Sports and Tourism

Addresses: 03 Vo Van Tan Street, Ward 2, Tan An City, Long An Province

Phone number (0272) 3826 452  

Fax: (0272) 3832 042  

Emailsvhttdl @longan.gov.vn

Function: Long An Department of Culture, Sports and Tourism is a specialized agency under the Provincial People's Committee, which has the function of advising and assisting the Provincial People's Committees in performing the function of State management related to culture, family, physical education, sports, tourism and advertisement (except advertising in newspapers, computer networks and publications) in the locality, public services under the management of the Department and implementing a the number of tasks and functions under the authorization of the Provincial People's Committees and the provisions of law.​


06/07/2018 10:00 SAĐã ban hành/PublishingImages/2018-07/to-chuc-bo-may.jpg
Opening "Vietnam - Japan Economic, Trade and Tourism Fair, Long An in 2018"Opening "Vietnam - Japan Economic, Trade and Tourism Fair, Long An in 2018"
In the evening of October 13, Vietnam - Japan Economic, Trade and Tourism Fair, Long An in 2018 was officially opened at Ward 3 Park, Tan An City. This is one of activities to celebrate the 45th anniversary of the establishment of diplomatic relations between Vietnam and Japan (September 21st, 1973 – September 21st, 2018).

From Japanese side, the opening ceremony had the attendance of Mr. Kawaue Junichi - Consulate General of Japan in Ho Chi Minh City; Mr. Kadowaki Keiichi - Chairman of the Japanese Business Association in Ho Chi Minh City.

The Exhibition will be organized on the scale of more than 400 standard booths of provinces, cities and enterprises in order to introduce the achievements of socio-economic achievements and tourism development of each locality; promote and introduce potentials, strengths, products and goods; develop brands; and seek partners and consumption markets.

Chủ tịch UBND tỉnh Trần Văn Cần phát biểu Khai mạc Hội chợ triễn lãm kinh tế thương mại du lịch Việt Nhật 13102018.jpg

Chairman of the Provincial People's Committee Tran Van Can spoke at the opening ceremony

Speaking at the Opening Ceremony, Chairman of the Provincial People's Committee Tran Van Can said that Japan is now the third largest economy in the world with much potential on science and technology which is leading in the world. Therefore, the People's Committee of Long An Province desires to continue calling for and attracting investments from Japan into such fields as hi-tech industry; hi-tech agriculture; human resource development etc.

As part of the cultural exchange activities celebrating the 45th anniversary of the establishment of diplomatic relations between Vietnam and Japan, which took place in Long An province, it hopes that the "Vietnam - Japan Economic, Trade and Tourism Fair, Long An in 2018" will be the opportunity for enterprises, investors to exchange and study about the cooperation opportunities as well as to introduce the typical products and strengths of Japanese enterprises inside and outside the province to consumers in Vietnam in general and in Long An Province in particular. 

 Cắt băng Khai mạc Hội chợ triễn lãm kinh tế thương mại du lịch Việt Nhật tại tỉnh Long An13102018.jpg

Delegates are cutting the opening band of the fair

Lãnh đạo tham quan gian hàng tại Hội chợ triễn lãm kinh tế thương mại du lịch viet-nhat13102018.jpg

Provincial leaders are visiting booths at the fair

Vietnam - Japan Economic, Trade and Tourism Fair, Long An in 2018 will be held until October 21st, 2018.


Reported by TV

Translated by Lan Vy ​​

15/10/2018 10:00 SAĐã ban hành/PublishingImages/2018-11/Cắt băng Khai mạc Hội chợ triễn lãm kinh tế thương mại du lịch Việt Nhật tại tỉnh Long An13102018.jpg
Natural condition Characteristics of geological structure in Long An provinceNatural condition Characteristics of geological structure in Long An province
Long An is located in the South Eastern edge of Da Lat zone. This is independent tectonic - metallogenetic zone, with foundation of Precambrian continental crust, subsided in early – middle Jura and experienced epicontinental regime in late Mesozoi.

The East Sea tide in Soai Rap estuary has amplitude of high from 3,5 to 3,9 m. The process of intruding salt water is deeper and longer into the inland. The reason is the strong operation of tide, northeast wind, less water from upstream and especially many exploitations of surface water in dry season. In the past, Vam Co Tay river had been intruded by salt water in Tuyen Nhon of about 5 km, since 1993, it has reached to Vinh Hung. The salinization has started from January to June with 2 - 4 gam/liters. The salinity of Vam Co Dong river has gradually reduced by the influence of Dau Tieng lake.

Besides, the earth tends to be hotter, facilitating sea level raising, developing the salinization deeply to inland.

The salinization has changed the ecological system of region which has been stable for many years, resulting in the influence to production and daily life of people. To reduce this process, should not exploit too much in dry season and the investment in irrigation systems should consider the impact of salt water intrusion on the general ecological system.

At the end of Mesozoi and in Kainozoi, Da Lat zone was activated forcefully. In Neogen – Quaternary, this region involving Mekong basin was subsided forcefully and filled up by terrigenous sediments . In Long An province, it mainly developed formations of sediments of Neogen Quaternary:

Sediments of conglomerate, sandstone, clay siltstone of Can Tho formation (N21ct) have large area of allocation.

Gravelstone, sandstone, siltstone, claystone of Nam Can formation (N22nc) have large area of allocation.

Formations of stream deposition including pebble, gravel, grit, sand, clay, kaolin of Cu Chi formation (aQ23cc) are allocated mainly in Loc Giang, Duc Lap Thuong, My Hanh Bac, Hoa Khanh Dong, An Ninh Tay communes under Duc Hoa district.

Formations of sea and rivers depositions including silt, clay with few gypsum of Moc Hoa formation (amQ21mh) are allocated mainly in areas of Duc Hue, Moc Hoa, Vinh Hung, Tan Hung districts.

Formations of stream deposition including pebble, gravel, grit, sand, clay kaolin of Hau Giang formation (mQ21hg) are allocated mainly in areas of Tan Thanh, Moc Hoa, Tan Hung districts.

Formations of sediments of Middle-Upper Holocen (aQ22-3) including stream deposition (sand, silt, clay), river - marsh (silt, clay, remains of plants and peat), are shelf deposits, alluvial flat and river bed deposit, allocating most of areas of districts in Long An province.

According to result of geological survey at the ratio of 1:200.000, it is recorded that there are 2 main fault systems in the North Western - South Eastern direction and North Eastern - South Western direction. These fault systems were found according to geophysical materials and indirect geological signs.​


19/08/2014 5:00 CHĐã ban hành
People’s CommitteePeople’s Committee
Members of People’s Committee of Long An Province for the term of 2016 - 2021

 

1Trần Văn Cần.jpg

1. Chairman: Mr. Tran Van Can, Deputy Secretary of the Provincial Party Committee

Date of Birth: 1962

Ethnic: Kinh

Religion: None

Place of birth: Hiep Thanh commune, Chau Thanh District, Long An Province

Date of joining the Party: 20/2/1985

Qualifications:

+ Education: University

+ Profession: University of Party and State Government Construction

+ Politics: High-ranking

Be responsible for all activities of the Provincial People's Committee, directly responsible for the following sectors: planning, organization - personnel administrative reform, inspection, judiciary, anti-corruption, citizen welcoming and settlement of complaints and denunciations from the citizens, internal affairs, external affairs and border affairs, emulation and commendation. 

​​

 

3Pham Van Canh.JPG

2. Vice Chairman: Mr. Pham Van Canh -  Member of Executive Committee of the Provincial Party Committee

Date of Birth: 1/1/1963

Ethnic: Kinh

Religion: None

Place of birth: An Nhut Tan commune, Tan Tru District, Long An Province

Date of joining the Party: 21/7/2006

Qualifications:

+ Education: University

+ Profession: Bridge and Road Engineer

+ Politics: High-ranking

To be responsible for specific tasks in the fields of: agriculture-forestry-fishery, agriculture promotion, plant protection, veterinary, programs on construction and development of new rural areas, science and technology, natural resources and environment, clean water, cooperative economy, construction, transport.​

phạm-tấn-hòa.jpg

3. Vice Chairman: Mr. Pham Tan Hoa – Member of the Executive Committee of the Provincial Party Committee.

Date of birth: January 02nd, 1973
Ethnic group: Kinh
Religion: No
Home town: Tan Binh Thanh commune, Cho Gao district, Tien Giang province
Admitted as a member of Communist Party of Vietnam on: 7/8/1999
Academic level:
+ Education: Master
+ Qualification: Economics   
+ Politics: Advanced


Nguyễn Văn Út.jpg

4. Vice Chairman: Mr. Nguyễn Văn Út  -  Member of Executive Committee of the Provincial Party Committee

Date of Birth: 30/12/1969

Ethnic: Kinh

Religion: None

Place of birth: Bình Hòa Nam commune, Duc Hue District, Long An Province

Date of joining the Party: 05/4/1997

Qualifications:

+ Education: Master

+ Profession: Economics

+ Politics: High-ranking


 

6Nguyen Van Bon So Noi vu.jpg

5. Member: Mr. Nguyen Van Bon - Member of Executive Committee of the Provincial Party Committee - Director of Department of Home Affairs

Date of Birth: 1960

Ethnic: Kinh

Religion: None

Place of birth:  My Yen commune, Ben Luc District, Long An Province

Date of joining the Party: 30/3/1989

Qualifications:

+ Education: University

+ Profession: Bachelor of Laws

+ Politics: Bachelor 

Mr. Nguyen Van Bon, Director of Department of Home Affairs, is in charge of internal affairs.​


 

8Nguyễn Văn Tiều.jpg

6. Member: Mr. Nguyen Van Tieu - Member of Executive Committee of the Provincial Party Committee - Director of Department of Planning and Investment

Date of Birth: 30/9/1959

Ethnic: Kinh

Religion: None

Place of birth:  Nhon Thanh Trung commune, Tan An City, Long An Province

Date of joining the Party: 28/7/1986

Qualifications:

+ Education: University

+ Profession: Economics

+ Politics: High-ranking 

Mr. Nguyen Van Tieu, Director of Department of Planning and Investment, is in charge of planning and investment, in charge of operations of Duc Hoa district.


 

vo-minh-thanh.jpg

7. Member: Mr. Vo Minh Thanh - Director of the Department of Director of Department of Natural Resources and Environment

Date of Birth: 13/8/1978

Ethnic: Kinh

Religion: None

Place of birth:  My Hanh Tay commune, Duc Hue District, Long An Province

Date of joining the Party: 25/4/2006

Qualifications:

+ Education: Master

+ Profession: Law

+ Politics: High-ranking 



 

Nguyễn Thanh Truyền.jpg

​8. Member: Mr. Nguyen Thanh Truyen  – Director of the Department of Agriculture and Rural Development 

Date of birth: March 15th, 1964
Ethnic group: Kinh
Religion: No
Home town: Vinh Tri commune, Vinh Hung district, Long An province
Admitted as a member of Communist Party of Vietnam on: November 10th, 1992
Academic level:
+ Education: University
+ Qualification: Administration
+ Politics: Advanced​​​


 

11Le Minh Duc.jpg

9. Member: Mr. Le Minh Duc - Director of Department of Industry and Trade

Date of Birth: 11/8/1960

Ethnic: Kinh

Religion: None

Place of birth:  Tan Kim commune, Can Giuoc District, Long An Province

Date of joining the Party: 25/2/1989

Qualifications:

+ Education: University

+ Profession: Bachelor of Economics; Bachelor of Party Construction and State Management

+ Politics: High-ranking 

Mr. Le Minh Duc - Director of Department of Industry and Trade​ is in charge of industry and trade.



 

13 Tran Minh Man.JPG

10​. Member: Mr. Tran Minh Man - Director of Department of Justice

Date of Birth: 23/7/1962

Ethnic: Kinh

Religion: None

Place of birth:  Long Tri commune, Chau Thanh District, Long An Province

Date of joining the Party: 8/5/1986

Qualifications:

+ Education: University

+ Profession: Economics

+ Politics: High-ranking 

Mr. Tran Minh Man, Director of the Department of Justice is directly in charge of justice.


 

14Nguyen Van Hoc.jpg

11. Member: Mr. Nguyen Van Hoc  -  Member of Provincial Party Committee - Director of Department of Transport

Date of Birth: 10/2/1961

Ethnic: Kinh

Religion: None

Place of birth:  My Thanh Dong commune, Duc Hue District, Long An Province

Date of joining the Party: 08/4/1986

Qualifications:

+ Education: Bachelor

+ Profession: Economics

+ Politics: High-ranking

 Mr. Nguyen Van Hoc  - Director of Department of Transport is directly in transport.


 



15Nguyen Thanh Tiep.JPG

12. Member: Mr. Nguyen Thanh Tiep  -  Director of Department of Education and Training

Date of Birth: 20/12/1966

Ethnic: Kinh

Religion: None

Place of birth:  Lac Tan commune, Tan Tru District, Long An Province

Date of joining the Party: 29/8/1991

Qualifications:

+ Education: Master

+ Profession: Education

+ Politics: High-ranking

Mr. Nguyen Thanh Tiep   Director of Department of Education and Training is directly in charge of  education and training.

Lê Quốc Dũng.png

13​​. Member: Mr. Le Quoc Dung – Director of the Department of Science and Technology.

Date of birth: June 06th, 1970
Ethnic group: Kinh
Religion: No
Home town: Binh Thanh commune, Duc Hue district, Long An province
Admitted as a member of Communist Party of Vietnam on: September 13th, 2002
Academic level:
+ Education: Master
+ Qualification: Chemical Engineer, Bachelor of Administration, Master of Political Science
+ Politics: Advanced​​​​​​​

Huỳnh Minh Phúc.jpg

14. Member: Mr. Huynh Minh Phuc – Director of the Department of Health.

Date of birth: February 10th, 1965
Ethnic group: Kinh
Religion: No
Home town: An Ninh Tay commune, Duc Hoa district, Long An province
Admitted as a member of Communist Party of Vietnam on: August 05th, 1996
Academic level:
+ Education: Master
+ Qualification: Specialized Doctor for Medical Management
+ Politics: Advanced


Võ Thành Trí.jpg

15. Member: Mr. Vo Thanh Tri  - Director of Department   of Labor, War Invalids and Social Affairs

Date of Birth: 22/6/1975

Ethnic: Kinh

Religion: None

Place of birth: Bình Hòa Bac commune, Duc Hue District, Long An Province

Date of joining the Party: 08/4/2005

Qualifications:

+ Education: Engineer

+ Profession: Industrial Engineering

+ Politics: High-ranking

Nguyễn Bá Luân.jpg

16. Member: Mr. Nguyen Ba Luan - Director of Department of Information and Communications

Date of Birth: 22/6/1964

Ethnic: Kinh

Religion: None

Place of birth: Dương Xuan Hoi commune, Chau Thanh District, Long An Province

Date of joining the Party: 02/7/1993

Qualifications:

+ Education: Master

+ Profession: Politics

+ Politics: High-ranking


 


 16 Nguyen Anh Dung.JPG

17​​. Member: Mr. Nguyen Anh Dung  -  Director of Department of Culture, Sports and Tourism

Date of Birth: 02/9/1963

Ethnic: Kinh

Religion: None

Place of birth:  Tan Kim commune, Can Giuoc District, Long An Province

Date of joining the Party: 12/9/1994

Qualifications:

+ Education: University

+ Profession: Agriculture Economics, Administration

+ Politics: High-ranking 

Mr. Nguyen Anh Dung   Director of Department of Culture, Sports and Tourism is directly in charge of culture, sports and tourism.


 

17 Do Thanh Son.jpg

18​​. Member: Mr. Do Thanh Son - Director of Department of External Affairs

Date of Birth: 18/10/1962

Ethnic: Kinh

Religion: None

Place of birth:  My Cam commune, Cang Long District, Tra Vinh Province

Date of joining the Party: 25/02/1989

Qualifications:

+ Education: Bachelor

+ Profession: Law

+ Politics: High-ranking

Mr. Do Thanh Son - Director of Department of External Affairs is directly in charge of external affairs.


Lê Hồng Nam.jpg ​

19. Member: Mr. Le Hong Nam – Director of the provincial Police.

Date of birth: June 05th, 1966
Ethnic group: Kinh
Religion: No
Home town: Tan An ward, Thu Dau Mot town, Binh Duong province  
Admitted as a member of Communist Party of Vietnam in: November 1990
Academic level:
+ Education: Master
+ Qualification: Investigation of crimes infringing on social safety
+ Politics: Advanced​



  

20 TRAN VAN TRAI.JPG

20​. Member: Mr. Tran Van Trai - Member of Standing Committee of the Provincial Party Committee - Commander of Provincial Military High Command

Date of Birth: 12/3/1967

Ethnic: Kinh

Religion: None

Place of birth:  Lac Tan commune, Tan Tru District, Long An Province

Date of joining the Party: 29/7/1988

Qualifications:

+ Education: University

+ Profession: Bachelor of Military

+ Politics: High-ranking

Mr. Tran Van Trai, Commander of the Provincial Military Command is directly in charge of national defense and in charge of operations of Tan Tru District.

​ 

06/07/2018 10:00 SAĐã ban hành/PublishingImages/2018-07/to-chuc-bo-may.jpg
Associations and Unions  Associations and Unions 
Associations and Unions 

​​

1. Provincial Veteran Association

Address: 48, National Highway No.62, Ward 2, Tan An City, Long An Province

Phone number : (0272) 3829453

Email: hoicuuchienbinh@longan.gov.vn

2. Provincial Red Cross Association

Mr Nguyen Van Ghim, Chairman of Provincial Red Cross Association

Address: 03 Vo Cong Ton, Ward 1, Tan An City, Long An Province

Phone number : (0272).3822529

3. Provincial Women Union

Mrs Nguyen Thi Hong Phuc,  Chairman of Provincial Women Union

Address: Song Hanh road, Highway 1A, Ward 6, Tan An City, Long An Province

Phone number : (0272) 3821313

Email: hoiphunutinh@longan.gov.vn

4. Provincial Farmer Association

Mr Pham Chi Tam, Chairman of Provincial Farmer Association

Address: 14 Truong Cong Xuong, Ward 1, Tan An City, Long An Province

Phone number : (0272) 3826 350

Fax: 0272 3835 480

Email: hoinongdan@longan.gov.vn

5. The Ho Chi Minh Communist Youth Union of Long An

Mr Bui Quoc Bao - Secretary of The Ho Chi Minh Communist Youth Union of Long An

Address: Song Hanh road, Highway 1A, Ward 6, Tan An City, Long An Province

Phone number : (0272) 3826 347

Fax: (0272) 3825 029

Email: tinhdoan@longan.gov.vn

6. Provincial Fatherland Front Committee

Mrs Nguyen Thi Ngoc Hanh, Chairman of Provincial Fatherland Front Committee

Address: 24 Truong Cong Xuong, Ward 1, Tan An City, Long An Province

Phone number : (0272). 3826283

Email: mttq@longan.gov.vn

11/07/2018 8:05 SAĐã ban hành/PublishingImages/2018-07/to-chuc-bo-may.jpg
FloodFlood
Every year flood converges firstly to the Northern districts in Dong Thap Muoi, starting from the beginning or mid August and lasting to November. In this time, the rain has the biggest flow and intensity, causing difficulties for production and life. Flood in Long An province is slow and its level is not deep as upstream but it lasts for longer time.

The frequency of high flood tended to reduce from 1 time for 8 - 10 years in the past, to 1 time for 3 - 4 years (1961, 1966, 1978, 1984, 1991) and high flood had occured for 3 consecutive years (1994, 1995, 1996), especially, flood was very high in 2000.

- Flooding levels according to the natural area in 1996 were as follows:

+ Below 50 cm with flooded area of 50.294 ha, accounting for 13,2 % of the natural area.

+ From 50 - 100 cm with flooded area of 72.360 ha, accounting for 18,99% of the natural area.

+ From 100 -150 cm with flooded area of 63.830 ha, accounting for 16,75% of the natural area.

+ From 150 - 200 cm with flooded area of 94.840 ha, accounting for 24,88% of the natural area.

+ From 200 - 250 cm with flooded area of 66.720 ha, accounting for 17,50% of the natural area.

+ Over 250 cm with flooded area of 33.070 ha, accounting for 8,68% of the natural area.

- Flooding duration:


+ Less than 3 months with 305.757 ha, accounting for 69,91% of the natural area.


+ From 3 - 5 months with 64.724 ha, accounting for 30,09 % of the natural area.


Especially, flood of the year 2000 was the biggest in decades and the long flooding period caused great damages to production and life of people. The highest water level in Moc Hoa (Long An) was 3,27 meter, 41 cm higher than flood peak in 1978. Flood run strongly to the South, resonating with hurricane tide, causing deep and wide flooding in 300.000 ha of natural area, including 132/188 communes, equivalent to 12/14 districts of province. The average flood was from 1,5 - 2 meters, some regions had deep flood of over 3 meters. Total damages to property were about 650 billion dong.


At present, the province has co-ordinated with flood control programs of the Central level to build sewer and dyke system to control closely and effectively flood, i.e. with small flood, try to keep water, with high flood,  use for washing alum to transform the land. Invest in building 186 residential clusters to ensure the stable and sustainable life in flood season. In construction, should choose the elevation exceeding the flooding level of the year 200
19/08/2014 5:00 CHĐã ban hành/PublishingImages/2014-08/Lu.bmp
The planned industrial complexes up to 2020 and vision to 2030The planned industrial complexes up to 2020 and vision to 2030
The planned industrial complexes up to 2020 and vision to 2030

NO.Name of the planned industrial complex Location (district)Area (ha)
1Loc Giang Industrial-Small-scaled Industry Complex Duc Hoa district 74.24
2Long Son Industrial ComplexCan Duc District 48
3Tan Trach  Industrial Complex Can Duc District 44
4Duc Hoa Ha  Industrial ComplexDuc Hoa district 81.67
5Duc Hoa Dong Industrial ComplexDuc Hoa district 87
Total 334.91​
06/03/2015 9:00 SAĐã ban hành/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
1 - 30Next
LONG AN PORTAL
Line Agency: People's Committee of Long An Province
Standing agency: The National Assembly Delegation, the Provincial People's Council and People's Committee Office​
Direct instruction: Mr. Mai Van Nhieu - Chief of Staff of the National Assembly Delegation, the provincial People's Council and People's Committee
Address: 61 Nguyen Hue, Ward 1, Tan An City, Long An Province
Phone: (0272). 3552489​
Email: vpubnd@longan.gov.vn; webmaster@longan.gov.vn
License No. 01 / GP-TTDT-STTTT dated March 3, 2015 - Department of Information and Communications